Plan Review Details - Permit 15041102
Plan Review Stops For Permit 15041102
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2015-07-31 Cont ID  
Sent By shill Date 2015-07-31 Time 10:18 Rev Time 0.00
Received By shill Date 2015-07-31 Time 10:18 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2015-05-27 Cont ID  
Sent By shill Date 2015-05-27 Time 15:30 Rev Time 0.00
Received By shill Date 2015-05-27 Time 15:30 Sent To  
Notes
2015-05-27 15:31:11****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. PROVIDE A VERIFIABLE COPY OF THE CONTRACT FOR THIS
 JOB, FBC 109. THIS MAY BE SENT VIA EMAIL.
  

Review Stop E ELECTRICAL
Rev No 1 Status N Date 2015-05-01 Cont ID  
Sent By dhayes Date 2015-05-01 Time 11:08 Rev Time 0.00
Received By dhayes Date 2015-05-01 Time 11:08 Sent To  
Notes
2015-05-01 11:11:17NO ELECTRICAL PLAN HAS BEEN INCLUDED IN THE SUBMITTAL
 PACKAGE. NO ELECTRICAL REVIEW HAS BEEN PERFORMED AT
 THIS TIME. AN ELECTRICAL PERMIT IS REQUIRED FOR AN
 ELECTRICAL CONTRACTOR TO COMPLETE THE ELECTRICAL
 CONNECTION REQUIRED FOR THE ELECTRICAL APPLIANCES
 INDICATED ON THE PLANS PROVIDED.
  
 1) PROVIDE AN ELECTRICAL PERMIT APPLICATION WITH A
 FLOOR PLAN AND A PANEL SCHEDULE INDICATING THE
 ELECTRICAL CIRCUIT AND DISCONNECT REQUIRED FOR THE NEW
 APPLIANCES PRPOSED. NEC 422.31
  
 DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421,
 561-805-6717 OR [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-07-31 Cont ID  
Sent By shill Date 2015-07-31 Time 10:18 Rev Time 0.00
Received By shill Date 2015-07-30 Time 15:40 Sent To  
Notes
2015-07-30 15:40:34RESUB ROUTED TO SHILL

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-05-27 Cont ID  
Sent By shill Date 2015-05-27 Time 15:31 Rev Time 0.00
Received By shill Date 2015-04-29 Time 11:13 Sent To  
Notes
2015-05-01 17:45:14SENT TO PLUMBING
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
2015-05-01 11:13:31R22

Review Stop P PLUMBING
Rev No 1 Status N Date 2015-05-03 Cont ID  
Sent By tklarge Date 2015-05-03 Time 05:04 Rev Time 0.00
Received By tklarge Date 2015-05-03 Time 04:55 Sent To  
Notes
2015-05-03 05:01:541) THE CONTRACTOR HAS NOT SUBMITTED ANY PLUMBING PLANS
 OR GAS PLANS FOR THE OUTDOOR KITCHEN. A SEPARATE
 PLUMBING AND GAS PERMIT SHALL BE SUBMITTED ALONG WITH
 TWO COPIES OF PLANS AND SPECIFICATIONS FOR THE ENTIRE
 SCOPE OF WORK TO BE DONE. WPB AMENDMENTS TO 2010 FBC
 SEC. 105.1, 107.2.1. T. LARGE