Plan Review Details - Permit 15040925
Plan Review Stops For Permit 15040925
Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2015-08-20 Cont ID  
Sent By tklarge Date 2015-08-20 Time 13:27 Rev Time 0.00
Received By tklarge Date 2015-08-20 Time 13:27 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-08-10 Cont ID  
Sent By skennedy Date 2015-08-10 Time 18:01 Rev Time 0.00
Received By skennedy Date 2015-08-10 Time 15:13 Sent To  
Notes
2015-08-10 15:13:09RESUB ROUTED TO SKENNEDY

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-04-26 Cont ID  
Sent By skennedy Date 2015-04-26 Time 12:03 Rev Time  
Received By skennedy Date 2015-04-24 Time   Sent To  
Notes
2015-04-25 09:33:15SENT TO S KENNEDY

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2015-08-10 Cont ID  
Sent By skennedy Date 2015-08-10 Time 18:00 Rev Time 0.00
Received By skennedy Date 2015-08-10 Time 18:00 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2015-04-26 Cont ID  
Sent By skennedy Date 2015-04-26 Time 11:59 Rev Time 0.00
Received By skennedy Date 2015-04-26 Time 11:59 Sent To  
Notes
2015-04-26 12:02:581ST REVIEW: FBC 2010
  
 THE DESIGN SUBMITTED IS BY A MECHANICAL CONTRACTOR, NOT
 BY THE ORIGINAL DESIGN PROFESSIONAL TEAM KO ENERGY. AS
 DAVIS IS THE MECHANICAL CONTRACTOR THIS SUBMITTAL IS OK
 FORREVIEW, BUT WHAY IS YOUR INTENT AS TO THE REVISED
 DESIGN BY KO ENERGY SUBMITTED AS A SEPARATE PENDING
 REVISION?
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  

Review Stop P PLUMBING
Rev No 3 Status P Date 2015-08-20 Cont ID  
Sent By tklarge Date 2015-08-20 Time 13:26 Rev Time 0.00
Received By tklarge Date 2015-08-20 Time 13:17 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2015-08-10 Cont ID  
Sent By skennedy Date 2015-08-10 Time 18:01 Rev Time 0.00
Received By skennedy Date 2015-08-10 Time 18:00 Sent To  
Notes
2015-08-10 18:01:42SEE COMMENTS OF 4/26/15, NO NEW PLAN WAS SUBMITTED.

Review Stop P PLUMBING
Rev No 1 Status F Date 2015-04-26 Cont ID  
Sent By skennedy Date 2015-04-26 Time 11:59 Rev Time 0.00
Received By skennedy Date 2015-04-26 Time 11:59 Sent To  
Notes
2015-04-26 12:01:101ST REVIEW: FBC 2010
  
 THE DESIGN SUBMITTED IS BY A PLUMBING CONTRACTOR, NOT
 BY THE ORIGINAL DESIGN PROFESSIONAL TEAM OF RAR,
 ARCHITECTS, & MICHAEL BASSFORD, ENGINEER.. IF THIS
 DRAWING IS TO BE USED, EVIDENCE OF REVIEW BY THE
 ORIGINAL DESIGN TEAM AS AUTHORIZED AND CONSISTENT WITH
 THE ORIGINAL DESIGN IS REQUIRED. NO REVIEW IS HEREBY
 PERFORMED.
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER