Plan Review Stops For Permit 15040864 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2015-06-09 |
|
|
Cont ID |
|
Sent By |
JWITMER |
Date |
2015-06-09 |
Time |
06:31 |
Rev Time |
0.00 |
Received By |
jwitmer |
Date |
2015-06-09 |
Time |
06:02 |
Sent To |
M |
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2015-04-27 |
|
|
Cont ID |
|
Sent By |
jwitmer |
Date |
2015-04-27 |
Time |
08:03 |
Rev Time |
0.00 |
Received By |
jwitmer |
Date |
2015-04-27 |
Time |
07:30 |
Sent To |
|
|
Notes |
2015-04-27 08:03:29 | PROVISO: | | SHEET A1.1 DETAIL # 3 SHOWS A NEW EXTERIOR WALL LOUVER | | DETAIL. PRODUCT APPROVAL WILL NEED TO BE SUPPLIED TO | | COMPLY WITH: | | FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS RULE 9N-3 NOV. | | 01/ 2010 (31) SUB-CATEGORY OF PRODUCTS OR CONSTRUCTION | | SYSTEMS THAT WILL REQUIRE PRODUCT APPROVALS: | | (31)(C) WALL LOUVERS, | | | | 2010 FBC 107.3.4.1 PRODUCT APPROVALS. THOSE PRODUCTS | | WHICH ARE REGULATED BY THE DCA RULE 9N-03 SHALL BE | | REVIEWED AND APPROVED IN WRITING BY THE DESIGNER OF | | RECORD PRIOR TO SUBMITTAL FOR JURISDICTIONAL APPROVAL. | | FL 61G1-23.015 (2) THE ARCHITECT IS RESPONSIBLE FOR | | SUPERVISING AND REVIEWING ALL PROJECT DATA, REPORTS, | | SHOP DRAWINGS ETC | | | | JAMES A. WITMER CBO | | SENIOR COMMERCIAL COMBINATION PLANS EXAMINER | | TEL: 561-805-6715 | | FAX: 561-805-6676 | | E-MAIL: [email protected] | | | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2015-06-04 |
|
|
Cont ID |
|
Sent By |
RLECKY |
Date |
2015-06-04 |
Time |
11:56 |
Rev Time |
0.00 |
Received By |
rlecky |
Date |
2015-06-04 |
Time |
11:12 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2015-05-12 |
|
|
Cont ID |
|
Sent By |
rlecky |
Date |
2015-05-12 |
Time |
12:42 |
Rev Time |
0.00 |
Received By |
rlecky |
Date |
2015-05-12 |
Time |
12:22 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
P |
Date |
2015-06-03 |
|
|
Cont ID |
|
Sent By |
PLEDUC |
Date |
2015-06-03 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2015-06-03 |
Time |
13:06 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
P |
Date |
2015-04-29 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2015-04-29 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2015-04-27 |
Time |
16:48 |
Sent To |
|
|
Notes |
2015-04-29 10:30:20 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, | | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | PLEASE CONSIDER THE FOLLOWING AS PROVISO: | | | | 1) SHEET A1.1 INDICATES AN INCORRECT REFERENCE TO THE | | FIRE CODE. THE PROPOSED PROJECT SHALL MEET THE | | REQUIREMENTS OF THE 5TH EDITION OF FLORIDA FIRE | | PREVENTION CODE INCLUDING THE 2012 EDITION OF NFPA 1 | | AND NFPA 101 AND ALL OTHER APPLICABLE CODES OR | | STANDARDS. | | FIRE SPRINKLER WORK SHALL COMPLY WITH THE REQUIREMENTS | | OF NFPA 13, 2010 EDITION. | | FIRE ALARM WORK SHALL COMPLY WITH THE REQUIREMENTS OF | | NFPA 72, 2010 EDITION. | | | | 2) SHEET A1.1, A2.1 AND E2.1 ADD ONE (1) EXIT SIGN TO | | LEAD TO THE REAR EXIT ACCESS AND EXIT. | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2015-06-09 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2015-06-09 |
Time |
08:16 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2015-06-01 |
Time |
|
Sent To |
|
|
Notes |
2015-06-02 13:11:19 | B32 | | NEW PLANS |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
|
|
|
Cont ID |
|
Sent By |
|
Date |
2015-05-15 |
Time |
|
Rev Time |
0.00 |
Received By |
shill |
Date |
2015-04-23 |
Time |
17:04 |
Sent To |
|
|
Notes |
2015-04-23 17:06:49 | ****EXPEDITED**** | | B07 | | |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
P |
Date |
2015-06-09 |
|
|
Cont ID |
|
Sent By |
CCOLE |
Date |
2015-06-09 |
Time |
08:16 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2015-06-09 |
Time |
08:16 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2015-05-15 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2015-05-15 |
Time |
10:35 |
Rev Time |
|
Received By |
skennedy |
Date |
2015-04-23 |
Time |
|
Sent To |
|
|
Notes |
2015-05-15 10:54:25 | | | 1ST REVIEW: FBC 2010 MECHANICAL | | CHRISTOPHER COLE | | | | 1) PROVIDE SHEET M0.1. IT WAS NOT ENCLOSED WITH THE | | SUBMITTED PLAN SETS. | | 2) PROVIDE SIZING CALCULATIONS FOR THE FCU'S AND 1.5 | | TON SPLIT SYSTEM- SECTION 505.2.2 FBC-10 ENERGY | | CONSERVATION. | | 3) INDICATE THE MAKE AND MANUFACTURER OF THE DS | | DETECTORS ON THE PLAN, AND CLARIFY HOW THEY WILL BE | | SUPERVISED PER SECTION 606.4.1 FMC-10. | | 4) PROVIDE TYPICAL DETAILS FOR SUPPORT AND HANGING OF | | THE FCU'S, AHU-1, THE DUCTWORK, AND THE CHILLED WATER | | PIPING. | | 5) INDICATE THE THICKNESS OF THE CHILLED WATER PIPING | | INSULATIONS- TABLE 503.2.8 FBC-10 ENERGY CONSERVATION. | | | | CHRISTOPHER COLE | | MECHANICAL PLANS EXAMINER | | 561-805-6719 | | [email protected] | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2015-05-14 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2015-05-14 |
Time |
12:15 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2015-05-14 |
Time |
05:54 |
Sent To |
|
|
Notes |
|
|