Plan Review Stops For Permit 15040825 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2015-05-18 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2015-05-18 |
Time |
15:41 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2015-05-18 |
Time |
15:41 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2015-04-22 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2015-04-22 |
Time |
18:45 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2015-04-22 |
Time |
18:45 |
Sent To |
|
|
Notes |
2015-04-22 18:52:59 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | 1. SEE PAGE 6 OF THE PRODUCT APPROVAL. CONTRACTOR HAS | | PROVIDED THE FASTENING FOR "OPEN" ENCLOSURE. FOR AN | | ENCLOSED STRUCTURE, FASTENING SHOULD BE ACCORDING TO | | THE CHART FOR "ENCLOSED" (PAGE NOT INCLUDED). THIS PAGE | | IS FOR SYSTEM TYPE C: MECHANICALLY ATTACHED INSULATION, | | BONDED ROOF COVER. | | | | PAGE 9 WAS ALSO PROVIDED, SYSTEM TYPE D: INSULATION, | | MECHANICALLY ATTACHED BASE, BONDED ROOF COVER. | | | | IT IS NOT CLEAR WHICH OF THE TWO SYSTEMS IS PROPOSED. | | PLEASE SELECT ONE. IF SYSTEM C IS SELECTED, PROVIDE THE | | MISSING PAGE (7) AND REVISE PROPOSED FASTENING TO | | CORRELATE WITH THE PRODUCT APPROVAL (OR CIRCLE ON | | PRODUCT APPROVAL). | | |
|
|
|