Plan Review Details - Permit 15040766
Plan Review Stops For Permit 15040766
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2015-06-03 Cont ID  
Sent By SKENNEDY Date 2015-06-03 Time 16:55 Rev Time 0.00
Received By skennedy Date 2015-06-03 Time 16:55 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2015-05-26 Cont ID  
Sent By skennedy Date 2015-05-26 Time 14:03 Rev Time 0.00
Received By skennedy Date 2015-05-15 Time 17:23 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2015-06-03 Cont ID  
Sent By SKENNEDY Date 2015-06-03 Time 16:55 Rev Time 0.00
Received By skennedy Date 2015-06-03 Time 16:55 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2015-05-26 Cont ID  
Sent By skennedy Date 2015-05-26 Time 14:04 Rev Time 0.00
Received By skennedy Date 2015-05-15 Time 17:22 Sent To  
Notes
2015-05-26 14:06:381ST REVIEW: FBC 2010
  
 SPOKE WITH ZACK AND WENT OVER PLAN DIFICENTCIES. HE
 DECIDED TO RESUBMIT WITH UPDATES AND FOR REVIEW TO BE
 ON HOLD UNTIL HE DOES SO,
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]

Review Stop G GAS REVIEW
Rev No 2 Status P Date 2015-06-12 Cont ID  
Sent By skennedy Date 2015-06-12 Time 15:37 Rev Time 0.00
Received By skennedy Date 2015-06-12 Time 15:37 Sent To  
Notes
2015-06-12 15:37:42REVIEW BY TIM LARGE

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2015-06-11 Cont ID  
Sent By SKENNEDY Date 2015-06-11 Time 06:48 Rev Time 0.00
Received By tklarge Date 2015-06-11 Time 06:31 Sent To  
Notes
2015-06-11 06:19:141) SUBMIT A CLEAR AND LEGIBLE GAS RISER DIAGRAM FOR
 REVIEW. SHOW ALL PIPE SIZES,TYPE OF PIPE MATERIAL, ETC.
 WPB AMEND. TO 2010 FBC SEC. 107.2.1, 107.3.5.3.
 2) SUBMIT MANUF. SPECIFICATIONS FOR ALL GAS EQUIPMENT /
 APPLIANCES. ALL GAS APPLIANCES SHALL BE LISTED AND
 LABELED PER THE FBC-R, SEC. G2404.3.
 3) INDICATE THE LONGEST LENGTH OF THE PIPING FROM THE
 POINT OF DELIVERY TO THE MOST REMOTE OUTLET AND THE
 LOAD OF THE SECTION PER 2010 FBC-R, SEC. G2413.4.1.
 4) SUBMIT CALCULATIONS FOR COMBUSTION AIR FOR THE
 APPLIANCES IN ACCORDANCE WITH 2010 FBC-R SEC.G2407.1.
 5) INDICATE THE GAS PRESSURE (PSI) OF THE SYSTEM.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-06-12 Cont ID  
Sent By tklarge Date 2015-06-12 Time 12:40 Rev Time 0.00
Received By tklarge Date 2015-06-01 Time 10:51 Sent To  
Notes
2015-06-10 14:08:10SENT TO R2

Review Stop I INCOMING/PROCESSING
Rev No 1 Status F Date 2015-05-26 Cont ID  
Sent By skennedy Date 2015-05-26 Time 14:04 Rev Time 0.00
Received By skennedy Date 2015-04-21 Time 12:36 Sent To  
Notes
2015-05-26 14:06:101ST REVIEW: FBC 2010
  
 SPOKE WITH ZACK AND WENT OVER PLAN DIFICENTCIES. HE
 DECIDED TO RESUBMIT WITH UPDATES AND FOR REVIEW TO BE
 ON HOLD UNTIL HE DOES SO,
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  
2015-04-22 12:37:32SENT TO R10 SHELF FOR REVIEW. JG.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2015-05-15 Cont ID  
Sent By skennedy Date 2015-05-15 Time 17:22 Rev Time 0.00
Received By skennedy Date 2015-05-15 Time 17:22 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status P Date 2015-06-12 Cont ID  
Sent By skennedy Date 2015-06-12 Time 17:03 Rev Time 0.00
Received By skennedy Date 2015-06-12 Time 17:03 Sent To  
Notes
2015-06-12 17:04:01REVIEW BY TIM LARGE.

Review Stop P PLUMBING
Rev No 2 Status F Date 2015-06-11 Cont ID  
Sent By SKENNEDY Date 2015-06-11 Time 06:31 Rev Time 0.00
Received By tklarge Date 2015-06-11 Time 06:24 Sent To  
Notes
2015-06-11 06:09:051) SUBMIT A CLEAR AND LEGIBLE SANITARY RISER DIAGRAM
 FOR REVIEW. THE DIAGRAM IS DRAWN SO SMALL IT IS
 DIFFICULT TO CHECK PIPE SIZES AT POINTS AND THE TYPE OF
 FIXTURE. WPB AMEND. TO 2010 FBC 107.2.1, 107.3.5.3.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2015-05-26 Cont ID  
Sent By skennedy Date 2015-05-26 Time 14:04 Rev Time 0.00
Received By skennedy Date 2015-05-15 Time 17:23 Sent To  
Notes
2015-05-26 14:06:491ST REVIEW: FBC 2010
  
 SPOKE WITH ZACK AND WENT OVER PLAN DIFICENTCIES. HE
 DECIDED TO RESUBMIT WITH UPDATES AND FOR REVIEW TO BE
 ON HOLD UNTIL HE DOES SO,
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]

Review Stop Z ZONING
Rev No 2 Status P Date   Cont ID  
Sent By SGRAHAM Date   Time   Rev Time 0.00
Received By sgraham Date 2015-06-11 Time 15:06 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2015-05-08 Cont ID  
Sent By sgraham Date 2015-05-08 Time 12:56 Rev Time 0.00
Received By sgraham Date 2015-05-08 Time 12:56 Sent To  
Notes
2015-05-08 12:56:425/8/15 ZONING FAILED
  
 1. SUBMIT TWO UP TO DATE SURVEYS


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved