Plan Review Details - Permit 15040413
Plan Review Stops For Permit 15040413 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2015-04-26 |
|
|
Cont ID |
|
Sent By |
jwitmer |
Date |
2015-04-26 |
Time |
07:00 |
Rev Time |
|
Received By |
jwitmer |
Date |
2015-04-26 |
Time |
06:20 |
Sent To |
|
|
Notes |
2015-04-26 07:01:05 | REVISION: DELTA # 1 DATED 2/18/2015 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2015-05-12 |
|
|
Cont ID |
|
Sent By |
rlecky |
Date |
2015-05-12 |
Time |
13:40 |
Rev Time |
0.00 |
Received By |
rlecky |
Date |
2015-05-12 |
Time |
13:25 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
P |
Date |
2015-04-27 |
|
|
Cont ID |
|
Sent By |
scaldero |
Date |
2015-04-27 |
Time |
13:36 |
Rev Time |
0.00 |
Received By |
scaldero |
Date |
2015-04-27 |
Time |
13:09 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2015-05-23 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2015-05-23 |
Time |
13:42 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2015-05-21 |
Time |
|
Sent To |
|
|
Notes |
2015-05-22 16:59:27 | SENT TO T LARGE |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2015-05-15 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2015-05-15 |
Time |
12:49 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2015-04-13 |
Time |
16:36 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
P |
Date |
2015-05-15 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2015-05-15 |
Time |
12:47 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2015-04-13 |
Time |
12:47 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2015-05-23 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2015-05-23 |
Time |
13:42 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2015-05-23 |
Time |
13:05 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2015-05-10 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2015-05-10 |
Time |
08:10 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2015-05-10 |
Time |
07:15 |
Sent To |
|
|
Notes |
2015-05-10 08:09:02 | 1) SHT. P2.0 - THE MAXIMUM SQUARE FOOTAGE PERMITTED ON | | AN 8 INCH HORIZONTAL STORM DRAIN IS 9,200 SQ. FT. BASED | | ON 5 INCH RAINFALL PER TABLE 1106.3 OF 2010 | | FBC-PLUMBING. THE PLAN IS SHOWING 12,200 SQ. FT. INTO | | EACH DRAIN. IS THIS NUMBER A TYPOGRAPHICAL ERROR? THE | | EXISTING PLANS SHOW A LOT LESS SQUARE FOOTAGE DRAINING | | INTO THESE DRAINS. | | 2) SHT.A1.7 SHOW THESE DRAINA AS EXISTING BUT THE | | EXISTING PLANS AND THIS PLAN APPEARS TO SHOW THEM AS | | NEW. CLARIFY. | | 3) AIR CONDITIONING DRAINS THAT DISCHARGE INTO ROOF | | DRAINS SHALL BE ADDED AS EACH GPM = 96 SQUARE FEET PER | | AIR CONDITIONING DRAIN PER 2010 FBC-PLUMBING | | SEC.1109.1. THIS SHALL BE SHOWN ON THE CALCULATIONS. | | | | PLUMBING PLAN REVIEW | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | 561-805-6692 | | [email protected] | | |
|
|
|