Plan Review Stops For Permit 15040196 |
Review Stop |
E |
ELECTRICAL |
Rev No |
4 |
Status |
P |
Date |
2015-06-05 |
|
|
Cont ID |
|
Sent By |
tlarge |
Date |
2015-06-05 |
Time |
10:24 |
Rev Time |
0.00 |
Received By |
dhayes |
Date |
2015-06-05 |
Time |
10:24 |
Sent To |
P |
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
F |
Date |
2015-05-12 |
|
|
Cont ID |
|
Sent By |
dhayes |
Date |
2015-05-12 |
Time |
13:49 |
Rev Time |
0.00 |
Received By |
dhayes |
Date |
2015-05-12 |
Time |
13:49 |
Sent To |
|
|
Notes |
2015-05-12 13:57:05 | 3RD REVIEW. | | | | 1) PROVIDE AN ELECTRICAL PANEL SCHEDULE INDICATEING THE | | OCPD AND WIRE SIZE FOR THE WATER HEATER CIRCUIT. NEC | | 408.8 | | ) PROVIDE A LOAD CALCULATION INDICATING THE CAPACITY OF | | THE SERVICE AND PANEL(S) TO SUPPORT THE ADDITIONAL LOAD | | OF THE NEW WATER HEATER. | | | | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, | | 561-805-6717 OR [email protected] |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
F |
Date |
2015-05-02 |
|
|
Cont ID |
|
Sent By |
dhayes |
Date |
2015-05-02 |
Time |
14:23 |
Rev Time |
0.00 |
Received By |
dhayes |
Date |
2015-05-02 |
Time |
14:23 |
Sent To |
|
|
Notes |
2015-05-02 14:27:32 | 2ND REVIEW. DUPLICATE COMMENTS. PREVIOUS COMMENTS HAVE | | NOT YET BEEN ADDRESSED. | | | | 1) SUBMIT AN EXISTING FLOOR PLAN SHOWING THE LOCATION | | OF THE EXISTING WATER HEATER. WHAT WILL BE DONE WITH | | THE EXISTING ELECTRIC? WPB AMEND. TO 2010 FBC SEC. | | 107.2.1. | | 2) PROVIDE AN ELECTRICAL PANEL SCHEDULE INDICATEING THE | | OCPD AND WIRE SIZE FOR THE WATER HEATER CIRCUIT. NEC | | 408.8 | | 3) PROVIDE THE WIRING METHODS AND MATERIALS PROPOSED | | FOR THE RELOCATION OF THE WATER HEATER CIRCUIT. | | 4) PROVIDE MANUFACTURER NAMEPLATE INFORMATION ON THE | | WATER HEATER INDICATING THE REQUIRED OPERATING VOLTAGE | | AND WATTAGE AND NUMBER OF THE ELEMENTS AND TYPE OF | | THERMOSTAT USED | | | | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, | | 561-805-6717 OR [email protected] |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2015-04-07 |
|
|
Cont ID |
|
Sent By |
dhayes |
Date |
2015-04-07 |
Time |
07:12 |
Rev Time |
0.00 |
Received By |
dhayes |
Date |
2015-04-07 |
Time |
07:12 |
Sent To |
|
|
Notes |
2015-04-07 07:19:10 | 1) SUBMIT AN EXISTING FLOOR PLAN SHOWING THE LOCATION | | OF THE EXISTING WATER HEATER. WHAT WILL BE DONE WITH | | THE EXISTING ELECTRIC? WPB AMEND. TO 2010 FBC SEC. | | 107.2.1. | | 2) PROVIDE AN ELECTRICAL PANEL SCHEDULE INDICATEING THE | | OCPD AND WIRE SIZE FOR THE WATER HEATER CIRCUIT. NEC | | 408.8 | | 3) PROVIDE THE WIRING METHODS AND MATERIALS PROPOSED | | FOR THE RELOCATION OF THE WATER HEATER CIRCUIT. | | 4) PROVIDE MANUFACTURER NAMEPLATE INFORMATION ON THE | | WATER HEATER INDICATING THE REQUIRED OPERATING VOLTAGE | | AND WATTAGE AND NUMBER OF THE ELEMENTS AND TYPE OF | | THERMOSTAT USED | | | | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, | | 561-805-6717 OR [email protected] |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2015-06-06 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2015-06-06 |
Time |
06:46 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2015-06-02 |
Time |
13:10 |
Sent To |
|
|
Notes |
2015-06-02 13:10:30 | TO DAH DESK | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2015-05-12 |
|
|
Cont ID |
|
Sent By |
dhayes |
Date |
2015-05-12 |
Time |
13:50 |
Rev Time |
0.00 |
Received By |
dhayes |
Date |
2015-05-11 |
Time |
|
Sent To |
|
|
Notes |
2015-05-12 09:38:48 | SENT TO D. HAYES DESK. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2015-05-02 |
|
|
Cont ID |
|
Sent By |
dhayes |
Date |
2015-05-02 |
Time |
14:23 |
Rev Time |
0.00 |
Received By |
dhayes |
Date |
2015-04-30 |
Time |
12:20 |
Sent To |
|
|
Notes |
2015-04-30 12:20:24 | TO TL DESK | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2015-04-07 |
|
|
Cont ID |
|
Sent By |
dhayes |
Date |
2015-04-07 |
Time |
07:19 |
Rev Time |
0.00 |
Received By |
dhayes |
Date |
2015-04-06 |
Time |
16:14 |
Sent To |
|
|
Notes |
2015-04-06 16:15:14 | ,<5000 PLUMB | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
P |
Date |
2015-06-06 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2015-06-06 |
Time |
06:46 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2015-06-06 |
Time |
06:42 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2015-05-01 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2015-05-01 |
Time |
05:44 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2015-05-01 |
Time |
05:10 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2015-04-07 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2015-04-07 |
Time |
06:17 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2015-04-07 |
Time |
05:32 |
Sent To |
|
|
Notes |
2015-04-07 06:15:29 | 1) SUBMIT AN EXISTING FLOOR PLAN SHOWING THE LOCATION | | OF THE EXISTING WATER HEATER. WHAT WILL BE DONE WITH | | THE EXISTING PLUMBING AND ELECTRIC? WPB AMEND. TO 2010 | | FBC SEC. 107.2.1. | | 2) INDICATE THE OCCUPANCY OF THIS SPACE? WHAT TYPE OF | | BUSINESS IS CURRENTLY OCCUPYING THIS SPACE? FBC | | SEC.302. | | 3) INDICATE ON THE PLANS WHAT THESE SINKS WILL BE USED | | FOR? WPB AMEND. TO 2010 FBC SEC. 107.2.1. | | 4) WHERE IS THE VENT FOR THE EXISTING SINK? WPB AMEND. | | TO 2010 FBC SEC. 107.2.1. | | 5) SUBMIT A WATER RISER FOR REVIEW. SHOW ALL PIPE SIZES | | AND VALVES. | | 6) A CLEANOUT IS REQUIRED IN THE STACK FOR THE AIR | | ADMITTANCE VALVE. FPC SEC.708.3.4. | | 7) SHOW REQUIREMENTS FOR CONTROLLING THERMAL EXPANSION | | IN THE WATER SUPPLY SYSTEM PER THE 2010 FPC | | SEC.607.3.OF THE 2010 FPC. | | 8) SHOW THE WATER LINES ON THE PLAN VIEW. WPB AMEND. TO | | 2010 FBC SEC. 107.2.1. | | 9) ONE OF THE SINKS SHALL COMPLY WITH THE FL. | | ACCESSIBILITY CODE SEC.212.3, 305, 306, 309 & 606. SHOW | | THE REQD. CLEAR FLOOR SPACE, HEIGHTS, DIMENSIONS OF | | SINK, | | 10) INDICATE ON THE PLAN IF THE WATER HEATER IS BEING | | INSTALLED ABOVE OR BELOW THE EXISTING COUNTER. IF ABOVE | | THE CONTER ON A SHELF, A PAN AND PAN DRAIN SHALL BE | | INSTALLED IN ACCORDANCE WITH THE 2010 FPC SEC.504.7. | | 11) THE RELIEF LINE SHALL DISCHARGE IN ACCORDANCE WITH | | 2010 FPC SEC.504.6. | | | | PLUMBING PLAN REVIEW | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | 561-805-6692 | | [email protected] | | |
|
|