Plan Review Details - Permit 15040099
Plan Review Stops For Permit 15040099
Review Stop G GAS REVIEW
Rev No 3 Status P Date 2015-04-11 Cont ID  
Sent By tlarge Date 2015-04-11 Time 03:39 Rev Time 0.00
Received By tklarge Date 2015-04-11 Time 02:58 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2015-04-07 Cont ID  
Sent By tklarge Date 2015-04-07 Time 08:03 Rev Time 0.00
Received By tklarge Date 2015-04-07 Time 07:46 Sent To  
Notes
2015-04-07 08:03:05***NOTE*** - THIS REVIEW SUPERCEDES REVIEW # 1 AS THAT
 REVIEW STOP IS LOCKED AND THE REVIEW COULD NOT BE
 COMPLETED. T.LARGE.
  
 1) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS FOR ALL
 GAS APPLIANCES. APPLIANCES SHALL BE LISTED AND LABELED
 PER THE 2010 FBCR SEC. G2404.3. WPB AMEND. TO 2010 FBC
 SEC. 107.2.1.
 2) SUBMIT A GAS RISER DIAGRAM FOR REVIEW. CLEARLY SHOW
 ALL CUT SECTIONS OF PIPE AND CORRESPONDING LENGTHS, THE
 PIPE SIZE, THE GAS PSI, THE TYPE OF PIPE MATERIAL, AND
 THE SIZE & CORRESPONDING EHD NUMBER OF CORRUGATED
 STAINLESS STEEL TUBING (CSST).2010 WPB AMEND. TO 2010
 FBC SEC. 107.3.5.3.
 3) INDICATE THE TYPE OF GAS .WPB AMEND. TO 2010 FBC
 SEC. 107.2.1.
 4) SHOW THE BTU LOAD OF THE APPLIANCES ON THE GAS
 RISER.2010 WPB AMEND. TO 2010 FBC SEC. 107.3.5.3.
 5) SHOW THE TOTAL DISTANCE FROM THE POINT OF DELIVERY
 (METER) TO THE MOST REMOTE GAS OUTLET. 2010 FBCR
 SEC.G2413.4.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  
  

Review Stop G GAS REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By tklarge Date 2015-04-07 Time 06:17 Sent To  
Notes
2015-04-07 06:56:351) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS FOR ALL
 GAS APPLIANCES. APPLIANCES SHALL BE LISTED AND LABELED
 PER THE 2010 FBCR SEC. G2404.3. WPB AMEND. TO 2010 FBC
 SEC. 107.2.1.
 2) SUBMIT A GAS RISER DIAGRAM FOR REVIEW. CLEARLY SHOW
 ALL CUT SECTIONS OF PIPE AND CORRESPONDING LENGTHS, THE
 PIPE SIZE, THE TYPE OF PIPE MATERIAL,AND THE SIZE &
 CORRESPONDING EHD NUMBER OF CORRUGATED STAINLESS STEEL
 TUBING (CSST).
 3) INDICATE THE TYPE OF GAS .
 4) SHOW THE BTU LOAD OF THE APPLIANCE ON THE GAS RISER.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-04-11 Cont ID  
Sent By tlarge Date 2015-04-11 Time 03:39 Rev Time 0.00
Received By tklarge Date 2015-04-08 Time 08:41 Sent To P
Notes
2015-04-10 08:42:09TO T. LARGE DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-04-07 Cont ID  
Sent By tklarge Date 2015-04-07 Time 08:03 Rev Time 0.00
Received By tklarge Date 2015-04-03 Time 12:07 Sent To  
Notes
2015-04-03 12:07:54TO PLUMBING < $5K


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved