Plan Review Details - Permit 15031190
Plan Review Stops For Permit 15031190
Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2015-04-15 Cont ID  
Sent By tklarge Date 2015-04-15 Time 11:40 Rev Time 0.00
Received By tklarge Date 2015-04-15 Time 11:40 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-04-11 Cont ID  
Sent By tlarge Date 2015-04-11 Time 11:17 Rev Time 0.00
Received By tklarge Date 2015-04-09 Time 08:23 Sent To P
Notes
2015-04-10 08:24:16TO T. LARGE DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-03-30 Cont ID  
Sent By tklarge Date 2015-03-30 Time 10:28 Rev Time 0.00
Received By tklarge Date 2015-03-26 Time 10:43 Sent To  
Notes
2015-03-26 10:43:11TO PLUMBING
  

Review Stop P PLUMBING
Rev No 3 Status P Date 2015-04-15 Cont ID  
Sent By tklarge Date 2015-04-15 Time 11:41 Rev Time 0.00
Received By tklarge Date 2015-04-15 Time 11:41 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2015-04-11 Cont ID  
Sent By tklarge Date 2015-04-11 Time 11:17 Rev Time 0.00
Received By tklarge Date 2015-04-11 Time 09:24 Sent To  
Notes
2015-04-11 11:17:011) SHT. P2.3 - 3RD FLOOR WASTE - SHOWS A 4 " HORIZONTAL
 RAINWATER LINE BY COL.#2 COLEECTING 1800 SQUARE FEET OF
 AREA. TABLE 1106.3 LIMITS THE SQUARE FOOTAGE OF A 4"
 LINE TO 1504 SQUARE FEET AT A 5" RAINFALL RATE.
 2) SHT. P2.2 SHOWS A 6" RAINWATER LINE THAT GOES
 NOWHERE. CLARIFY.
 3) SHT. P2.3 - SHOWS A 4" RAINWATER LINE PENETRATING
 WHAT APPEARS TO BE A RATED STAIR ENCLOSURE.
 PENETRATIONS INTO AND OPENINGS THROUGH ARE PROHIBITED
 EXCEPT FOR REQUIRED EXIT DOORS, EQUIPMENT AND DUCTWORK
 NECESSARY FOR FOR INDEPENDENT VENTILATION OR
 PRESSURIZATION, SPRINKLER PIPING, STANDPIPES,
 ELECTRICAL RACEWAYS FOR FIRE DEPARTMENT COMMUNICATIONS,
 ETC. PER THE 2010 FBC SEC.1022.4.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2015-03-30 Cont ID  
Sent By tklarge Date 2015-03-30 Time 10:28 Rev Time 0.00
Received By tklarge Date 2015-03-30 Time 06:49 Sent To  
Notes
2015-03-30 10:28:381) SUBMIT A ROOF SCUPPER DETAIL FOR REVIEW.SHOW THE
 LENGTH & WIDTH & HEIGHT DIMENSIONS, THE SQUARE FOOTAGE
 THAT WOULD DRAINED BY EACH SCUPPER, AND THE HEAD OF THE
 SCUPPER PER TABLE 1106.7 OF THE 2010 FPC. SCUPPER
 DESIGN AND LOCATION SHALL COMPLY W/2010 FBC SEC.
 1503.4.2.1.
 2) SUBMIT A CLEAR AND LEGIBLE PLAN THAT SHOWS THE
 LOCATION OF THE ROOF DRAINS AND THE SCUPPERS. THE HAND
 DRAWN PLAN IS NOT LEGIBLE ENOUGH. WPB AMEND. TO 2010
 FBC SEC. 107.2.1.
 3) INDICATE ON THE PLAN IF THE SCUPPERS DISCHARGE TO A
 COLLECTOR BOX AND DOWNSPOUT. IF SO, SHOW THE LOCATION
 AND SIZES ON THE PLANS. DOWNSPOUTS SHALL COMPLY W/ 2010
 FPC TABLES 1106.2 (1) OR 110602 (2).
 4) SUBMIT A STORM DRAINAGE RISER FOR THE NEWLY ADDED 4"
 OVERFLOW DRAINS. SHOW THE SQUARE FOOTAGE DRAINED BY
 EACH DRAIN AND SHOW THE SIZES OF ALL VERTICAL AND
 HORIZONTAL PIPES. COMPLY WITH TABLE 1106.3 OF 2010 FPC.
 5) CLEARLY IDENTIFY BY CLOUDING THE NEW 4" ROOF
 OVERFLOW DRAINS ON THE DRAWINGS FROM EMERALD
 ENGINEERING. WPB AMEND. TO 2010 FBC SEC.107.2.1.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  
  