Plan Review Details - Permit 15031041
Plan Review Stops For Permit 15031041
Review Stop AD ADDRESSING
Rev No 1 Status N Date 2015-04-23 Cont ID  
Sent By spalmer Date 2015-04-23 Time 10:25 Rev Time 0.00
Received By spalmer Date 2015-04-23 Time 10:25 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2015-05-06 Cont ID  
Sent By cranford Date 2015-05-06 Time 15:05 Rev Time 0.00
Received By cranford Date 2015-05-06 Time 15:04 Sent To  
Notes
2015-05-06 15:05:17FENCE RELOCATED TO BE ENTIRELY ON APPLICANT'S PROPERTY.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2015-04-21 Cont ID  
Sent By cranford Date 2015-04-21 Time 08:59 Rev Time 0.00
Received By cranford Date 2015-04-21 Time 08:30 Sent To I
Notes
2015-04-21 08:58:58A RIGHT-OF-WAY PERMIT WILL BE REQUIRED PRIOR TO THE
 INSTALLATION OF THE FENCE WITHIN THE FLORIDA AVENUE
 RIGHT-OF-WAY. THE RIGHT-OF-WAY PERMIT APPLICATION CAN
 BE DOWNLOADED AT
 HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/
  
 KELLY CRANFORD, P.E.
 LAND DEVELOPMENT ENGINEER
 PUBLIC WORKS DEPARTMENT
 CITY OF WEST PALM BEACH
 [email protected]
 561-494-1098 (OFFICE)
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-05-06 Cont ID  
Sent By cranford Date 2015-05-06 Time 15:05 Rev Time 0.00
Received By cranford Date 2015-04-23 Time 10:31 Sent To Z
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-04-23 Cont ID  
Sent By skennedy Date 2015-04-23 Time 10:30 Rev Time 0.00
Received By skennedy Date 2015-03-24 Time 09:39 Sent To  
Notes
2015-03-25 09:40:01SENT TO ZONING SHELF FOR REVIEW. JG.

Review Stop Z ZONING
Rev No 2 Status P Date 2015-05-04 Cont ID  
Sent By cranford Date 2015-05-06 Time 15:05 Rev Time 0.25
Received By eschneid Date 2015-05-04 Time 14:59 Sent To ENG
Notes
2015-05-04 15:00:09FENCE MAY NOT BE ERECTED UNTIL DEMOLITION PERMIT IS
 ISSUED.

Review Stop Z ZONING
Rev No 1 Status F Date 2015-04-17 Cont ID  
Sent By eschneid Date 2015-04-17 Time 15:47 Rev Time 0.25
Received By eschneid Date 2015-04-17 Time 15:47 Sent To ENG
Notes
2015-04-17 15:53:38FAILED
  
 1) A PORTION OF THE FENCE IS LOCATED WITHIN THE FLORIDA
 AVENUE RIGHT-OF-WAY. A RIGHT-OF-WAY PERMIT FROM THE
 CITY'S ENGINEERING SERVICES DEPARTMENT IS REQUIRED
 PRIOR TO ZONING APPROVAL OF THE FENCE WITHIN THE
 RIGHT-OF-WAY.
  
 2) SHOW HOW THE LANDSCAPE THAT IS REQUIRED TO REMAIN
 WITHIN THE LIMITS OF THE CONSTRUCTION FENCE WILL BE
 PROTECTED FROM DAMAGE/DESTRUCTION.
  
 3) PROVIDE VERIFICATION THAT THE REQUIREMENTS OF
 SECTION 94-450(E)(2) TEMPORARY CONSTRUCTION FENCES WILL
 BE MET.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved