Plan Review Stops For Permit 15030292 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2015-05-18 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2015-05-18 |
Time |
15:50 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2015-05-18 |
Time |
15:50 |
Sent To |
Z |
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2015-04-08 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2015-04-08 |
Time |
18:07 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2015-04-08 |
Time |
17:11 |
Sent To |
|
|
Notes |
2015-04-08 18:07:52 | PLAN REVIEW COMMENTS | | | | 1ST REVIEW: FBC 2010 | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) FBC 107.3.4 - PROVIDE TWO SETS OF PRODUCT APPROVALS | | FOR THOSE PRODUCTS WHICH ARE REGULATED BY DCA RULE 9N-3 | | THAT HAVE BEEN REVIEWED AND APPROVED IN WRITING BY THE | | DESIGNER OF RECORD. PROVIDE TWO COMPLETE PRODUCT | | APPROVALS WITH FL OR NOA NUMBERS INCLUDING INSTALLATION | | INSTRUCTIONS AND MAXIMUM DESIGN PRESSURES FOR EACH OF | | THE DIFFERENT ROOFING MATERIALS, WINDOW/GLASS TYPES, | | STRUCTURAL MULLIONS AND EXTERIOR DOOR TYPES. | | A) THE PLANS SPECIFY SINGLE HUNG WINDOWS AND PRODUCT | | APPROVALS WERE SUBMITTED FOR CASEMENT WINDOWS. FBC | | 107.2.1 | | B) PRODUCT APPROVALS WERE SUBMITTED FOR GLAZED FRENCH | | DOORS. THE ELEVATIONS SHOW A FLUSH DOOR AND TWO (2) | | PANEL DOORS. ONE OF THE PANEL DOORS HAS AN ARCHED TOP. | | | | 2) SHOW COMPLIANCE WITH FBC EXISTING BUILDING 604.1 AND | | FBC-R310.1 FOR EMERGENCY ESCAPE AND RESCUE AT THE | | BEDROOM WINDOWS. | | | | IN ORDER TO REDUCE PLAN REVIEW TIMES AND PROVIDE | | CLARIFICATION, PLEASE SUBMIT A RESPONSE LETTER | | INDICATING HOW EACH OF THE REVIEW COMMENTS HAS BEEN | | ADDRESSED. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2015-04-08 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2015-04-08 |
Time |
15:37 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2015-04-08 |
Time |
15:37 |
Sent To |
|
|
Notes |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
2 |
Status |
P |
Date |
2015-06-01 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2015-06-01 |
Time |
15:55 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2015-06-01 |
Time |
15:55 |
Sent To |
|
|
Notes |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
1 |
Status |
P |
Date |
2015-03-06 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2015-03-06 |
Time |
16:27 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2015-03-06 |
Time |
16:27 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2015-06-02 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2015-06-02 |
Time |
07:39 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2015-05-01 |
Time |
17:27 |
Sent To |
|
|
Notes |
2015-05-01 17:27:26 | SENT TO R MCDOUGAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
|
|
|
Cont ID |
|
Sent By |
|
Date |
2015-04-08 |
Time |
|
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2015-03-06 |
Time |
18:14 |
Sent To |
|
|
Notes |
2015-03-06 18:15:21 | SENT TO R6 BIN FOR REVIEW. JG. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
N |
Date |
2015-05-18 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2015-05-18 |
Time |
16:36 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2015-05-18 |
Time |
15:51 |
Sent To |
|
|
Notes |
2015-05-18 16:51:02 | CONTRACTOR, NICK VILLE, REMOVED HVAC FROM THE SCOPE OF | | WORK. A SEPARATE PERMIT, APPLICATION AND REVIEW IS | | REQUIRED. THE VALUE OF THE HVAC WORK ( $9000.00 ) WAS | | REMOVED FOR THE MASTER PERMIT. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2015-04-08 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2015-04-08 |
Time |
15:37 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2015-04-08 |
Time |
15:37 |
Sent To |
|
|
Notes |
2015-04-08 16:19:38 | PLAN REVIEW COMMENTS | | | | 1ST REVIEW: FBC 2010 | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY MECHANICAL | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) THE SCOPE OF WORK ON THE PRIMARY PERMIT APPLICATION | | STATES ADD A/C. HOWEVER NO MECHANICAL PLANS OR PERMIT | | APPLICATION WAS SUBMITTED. FBC 107.1 | | | | 2) FBC-R - M1401.3 SIZING. HEATING AND COOLING | | EQUIPMENT SHALL BE SIZED BASED ON BUILDING LOADS | | CALCULATED IN ACCORDANCE WITH ACCA MANUAL J OR OTHER | | APPROVED HEATING AND COOLING CALCULATION METHODOLOGIES. | | PROVIDE EQUIPMENT SIZING CALCULATIONS. | | | | 3) FBC - 107.3.5.3 PROVIDE TWO SETS OF A MECHANICAL | | PLAN TO SHOW EQUIPMENT (SCHEDULE ON PLANS) AND LOCATION | | AND DUCT SYSTEMS PER FBC-R M16 & BATH EXHAUST PER FBC-R | | M15. |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2015-04-04 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2015-04-04 |
Time |
09:33 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2015-04-04 |
Time |
09:17 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2015-03-06 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2015-03-06 |
Time |
16:27 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2015-03-06 |
Time |
16:27 |
Sent To |
B |
|
Notes |
|
|