Plan Review Details - Permit 15020937
Plan Review Stops For Permit 15020937 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
9 |
Status |
P |
Date |
2017-06-21 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2017-06-21 |
Time |
08:40 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2017-06-21 |
Time |
08:40 |
Sent To |
|
|
Notes |
2017-06-21 09:16:05 | FBC 2014 | | OCC CLASS 5TH ED E | | OCC LOAD 250 | | PROP USE SCHOOL | | SPRINKLER SYS? Y | | SPRK REQ'D? Y | | BATHRMS 9 | | FLOOD ZONE A5 7.00 | | UNITS 1 | | FLOORS 2 | | BEDROOMS 0 | | SQ FT LIVABLE 16033 | | SQ FT FOOTPRINT 8736 | | SQ FT ROOF 7260 | | USC-404 TYPE 326 - NEW:SCHOOL OR UNIVERSITY | | | | DFE PER PLAN = 8.96' NGVD29 | | | | BUILDING UNDER CONSTRUCTION ELEVATION CERTIFICATE OR | | FORM BOARD SURVEY SHOWING PROPOSED ELEVATIONS IS | | REQUIRED PRIOR TO CONCRETE POUR | | FINISHED CONSTRUCTION ELEVATION CERTIFICATE IS REQUIRED | | PRIOR TO FINAL INSPECTION. | | | | PROPOSED STRUCTURE IS LOCATED IN SFHA A5. THE FIRST | | FLOOR PROPOSED FFE IS 8.46 | | | | ELEVATION CERTIFICATE / FORM BOARD SURVEY REQUIRED | | PRIOR TO CONCRETE POUR | | FINISHED CONSTRUCTION ELEVATION CERTIFICATE REQUIRED | | PRIOR TO FINAL INSPECTION | | | | | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
8 |
Status |
P |
Date |
2017-06-13 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2017-06-13 |
Time |
14:44 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2017-06-13 |
Time |
14:14 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
7 |
Status |
P |
Date |
2017-04-25 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2017-04-25 |
Time |
10:22 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2017-04-25 |
Time |
07:57 |
Sent To |
|
|
Notes |
2017-04-25 10:20:56 | PROVISO: | | | | BUILDING UNDER CONSTRUCTION ELEVATION CERTIFICATE OR | | FORM BOARD SURVEY SHOWING PROPOSED ELEVATIONS IS | | REQUIRED PRIOR TO CONCRETE POUR | | | | FINISHED CONSTRUCTION ELEVATION CERTIFICATE IS REQUIRED | | PRIOR TO FINAL INSPECTION. | | | | THIS PERMIT, REVIEWS AND FEES INCLUDE B, M, E, P. ALL | | OTHER ITEMS (FA, FS, FENCES AND GATES, SIGNAGE, | | LANDSCAPING, ETC.) REQUIRE SEPARATE PERMITS - | | APPLICATIONS, FEES, PLANS AND REVIEWS. | | | | SEPARATE SUB PERMITS ARE REQUIRED. | | | | A SEPARATE ROOF SUB PERMIT IS REQUIRED. SUBMIT PRODUCT | | APPROVALS, REVIEWED BY DESIGNER OF RECORD. INDICATE | | ASSEMBLY PROPOSED. PROVIDE ENGINEERING IF APPLICABLE. | | | | | | | | | | | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
6 |
Status |
F |
Date |
2017-03-22 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2017-03-22 |
Time |
17:25 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2017-03-22 |
Time |
17:25 |
Sent To |
|
|
Notes |
2017-03-22 17:45:23 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | FBC = FLORIDA BUILDING CODE, 5TH EDITION (2014) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | | | 1. SEE PREVIOUS LIST. THIS PERMIT CAN BE ISSUED WITH | | PROVISO; SEND VIA EMAIL ELEVATOR LOCATION AND | | COMMITMENT TO SUBMIT A REVISION WHICH INCORPORATES THE | | ELEVATOR. | | | | 2. AS1.1 DOES NOT INCLUDE A LEGEND FOR THE DASHED LINE | | GRAPHIC. IT APPEARS THAT THIS DENOTES AREA OF WORK, NOT | | PROPERTY LINE. THIS PERMIT WILL BE ISSUED WITH PROVISO, | | THE PROPERTY LINES AND ASSUMED PROPERTY LINES WERE USED | | FOR REVIEW. | | | | 3. PLAYGROUND EQUIPMENT WAS NOT REVIEWED; THIS REQUIRES | | A SEPARATE PERMIT. | | | | 4. INFORMATIONAL ONLY; SHEET A2.4 IS NOT INCLUDED ON | | THE INDEX. PLEASE UPDATE INDEX SHEET BUT DO NOT | | RESUBMIT THIS SHEET UNLESS IT IS REVISED AND | | RESUBMITTED AS A RESULT OF COMMENTS FROM ANOTHER TRADE. | | | | | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
5 |
Status |
F |
Date |
2017-02-14 |
|
|
Cont ID |
|
Sent By |
S.HILL |
Date |
2017-02-14 |
Time |
12:55 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2017-02-13 |
Time |
11:26 |
Sent To |
|
|
Notes |
2017-02-14 13:12:40 | ****CORRECTIONS**** | | REVISED 2/14 TO ADD CODE SECTION FBC A 206.4 | | REVISED 2/27 TO ADD INFORMATION FROM EMAIL SENT 2/16/17 | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | FBC = FLORIDA BUILDING CODE, 5TH EDITION (2014) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | | | 3. FBC A 201.1.1, ACCESSIBLE ROUTE TO SECOND FLOOR IS | | NOT CLEAR. THE ROUTE SHOWN INCLUDES STAIRS IN THE | | EXISTING BUILDING. STAIRS ARE NOT A COMPONENT OF AN | | ACCESSIBLE ROUTE, SEE FBC 402.2. | | | | A RAMP IN THE EXISTING BUILDING IS SHOWN, BUT THE ROUTE | | IS NOT CLEAR. A1.01 AND OTHER SHEETS DO NOT CLEARLY | | SHOW HOW AN OCCUPANT ENTERS THE BUILDING FROM THE RAMP. | | THE RAMP DOES NOT APPEAR TO LEAD TO AN ENTRANCE TO THE | | BUILDING. | | | | THE WIDTH OF THE ROUTE (BASE OF STAIRS TO BUILDING) IS | | NOT CLEAR IF THE RAMP IN THE BACK OF THE BUILDING IS | | THE ACCESSIBLE ROUTE. THIS ROUTE APPEARS CUMBERSOME AND | | MORE DIFFICULT THAN THE ROUTE THROUGH THE FRONT; | | LONGER, GOES THROUGH AN EXIT STAIR, TWO DOORS, AND AN | | UNIDENTIFIED AREA. IF THIS IS PROPOSED AS THE | | ACCESSIBLE ROUTE, PLEASE GET THIS APPROVED VIA EMAIL | | PRIOR TO RESUBMITTAL BY SENDING ADDITIONAL INFORMATION | | VIA EMAIL. | | | | 2ND REVIEW: PLEASE SEE FBC A LOCATION (PARTIAL TEXT): | | | | ACCESSIBLE ROUTES SHALL COINCIDE WITH OR BE LOCATED IN | | THE SAME AREA AS GENERAL CIRCULATION PATHS. | | | | SEE ALSO ADVISORY 206.3: | | | | THE ACCESSIBLE ROUTE MUST BE IN THE SAME AREA AS THE | | GENERAL CIRCULATION PATH .... ADDITIONALLY, ACCESSIBLE | | VERTICAL INTERIOR CIRCULATINO MUST BE IN THE SAME AREA | | AS STAIRS AND ESCALATORS, NOT ISOLATED IN THE BACK OF | | THE FACILITY. | | | | AS PER OUR TELEPHONE DISCUSSION, PROVIDE RATIONALE FOR | | THE ACCESSIBLE ROUTE. THE FIRST DESIGN INCLUDED A RAMP | | ADJACENT TO THE STAIRS, SO ALL OCCUPANTS ENTER FROM THE | | SAME AREA FACING THE DROP OFF LOCATION. THE NEW DESIGN | | HAS ALL OCCUPANTS ENTERING VIA THE SAME AREA, BUT THE | | ACCESSIBLE ENTRANCE IS AT THE REAR AND HAS AN | | ADDITIONAL 65 FEET OF TRAVEL DISTANCE TO ARRIVE AT THE | | ELEVATOR. IT IS NOT CLEAR HOW THIS IS AN EQUIVALENT | | FACILITATION. | | | | 7. FBC 107, AS THIS PERMIT WAS READY FOR ISSUANCE, | | SUPPLEMENTARY INFORMATION WHICH IS NO LONGER APPLICABLE | | IS IN THE PACKAGE (SUCH AS ENERGY CALCS). PLEASE TREAT | | THESE THE SAME AS PLANS; THE ONES WHICH SHOULD BE | | REMOVED SHOULD BE MARKED VOID AND RETAINED SEPARATELY, | | WITH THE VOIDED PLAN SHEETS. ASSEMBLE TWO SETS OF | | SUPPLEMENTARY DOCUMENTS FOR REVIEW. | | | | 18. THIS PERMIT WILL BE ISSUED WITH THE FOLLOWING | | PROVISOS: | | | | BUILDING UNDER CONSTRUCTION ELEVATION CERTIFICATE OR | | FORM BOARD SURVEY SHOWING PROPOSED ELEVATIONS IS | | REQUIRED PRIOR TO CONCRETE POUR | | FINISHED CONSTRUCTION ELEVATION CERTIFICATE IS REQUIRED | | PRIOR TO FINAL INSPECTION. | | | | NEW COMMENT 2/16: | | | | AFTER REVIEW OF THE ACTUAL CIRCULATION PATH (OF WHICH I | | WAS PREVIOUSLY NOT AWARE) AND DISCUSSION WITH THE | | BUILDING OFFICIAL, IT APPEARS THAT VERTICAL | | ACCESSIBILITY SERVING THIS BUILDING IS REQUIRED. THE | | PLAN PROPOSED THAT OCCUPANTS WHO CANNOT NAVIGATE THE | | STAIRS ARE TO EXIT THE NEW BUILDING AND ENTER THE | | ADJACENT BUILDING IN ORDER TO UTILIZE AN EXISTING | | ELEVATOR. IT APPEARS THAT THE NEW BUILDING REQUIRES AN | | ELEVATOR. | | | | SEE FBC 206.3: "WHERE CIRCULATION PATHS ARE INTERIOR, | | REQUIRED ACCESSIBLE ROUTES SHALL ALSO BE INTERIOR." | | | | FOR INSTANCE, AN OCCUPANT IN THE NEW BUILDING WHO IS | | ABLE TO USE THE STAIRS CAN GO DIRECTLY TO THE SECOND | | FLOOR AFTER ENTERING VIA ADMINISTRATION. SOMEONE UNABLE | | TO USE THE STAIRS WILL BE REQUIRED TO EXIT THE BUILDING | | AND ENTER A DIFFERENT BUILDING IN ORDER TO ACCESS THE | | SECOND FLOOR OF THE NEW BUILDING. | | | | | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
F |
Date |
2016-12-03 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2016-12-03 |
Time |
11:27 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2016-12-01 |
Time |
06:58 |
Sent To |
|
|
Notes |
2016-12-03 11:29:26 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | FBC = FLORIDA BUILDING CODE, 5TH EDITION (2014) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | | | 1. LS1.0, LS1.1 STATE THIS IS A TWO STORY OFFICE | | BUILDING, BUT OCCUPANCY CLASSIFICATION IS PRIMARILY | | EDUCATIONAL, REVISE OR CLARIFY. | | | | 2. LS1.0 EXISTING BUILDING #2 INFORMATION INCLUDES A | | HEADING ?NEW BUILDING?, REVISE OR CLARIFY. | | | | 3. FBC A 201.1.1, ACCESSIBLE ROUTE TO SECOND FLOOR IS | | NOT CLEAR. THE ROUTE SHOWN INCLUDES STAIRS IN THE | | EXISTING BUILDING. STAIRS ARE NOT A COMPONENT OF AN | | ACCESSIBLE ROUTE, SEE FBC 402.2. | | | | A RAMP IN THE EXISTING BUILDING IS SHOWN, BUT THE ROUTE | | IS NOT CLEAR. A1.01 AND OTHER SHEETS DO NOT CLEARLY | | SHOW HOW AN OCCUPANT ENTERS THE BUILDING FROM THE RAMP. | | THE RAMP DOES NOT APPEAR TO LEAD TO AN ENTRANCE TO THE | | BUILDING. | | | | THE WIDTH OF THE ROUTE (BASE OF STAIRS TO BUILDING) IS | | NOT CLEAR IF THE RAMP IN THE BACK OF THE BUILDING IS | | THE ACCESSIBLE ROUTE. THIS ROUTE APPEARS CUMBERSOME AND | | MORE DIFFICULT THAN THE ROUTE THROUGH THE FRONT; | | LONGER, GOES THROUGH AN EXIT STAIR, TWO DOORS, AND AN | | UNIDENTIFIED AREA. IF THIS IS PROPOSED AS THE | | ACCESSIBLE ROUTE, PLEASE GET THIS APPROVED VIA EMAIL | | PRIOR TO RESUBMITTAL BY SENDING ADDITIONAL INFORMATION | | VIA EMAIL. | | | | 4. A 1.6, THE TEXT IDENTIFYING THE MECHANICAL EQUIPMENT | | IS NOT LEGIBLE, PLEASE RELOCATE, FBC 107. | | | | 5. LS 1.2, THE AREA WHICH APPEARS TO BE A LIBRARY IS | | NOT IDENTIFIED, FBC 107. | | | | 6. LS PAGES, GENERAL INFORMATION, APPEAR TO INCLUDE | | INFORMATION NOT RELEVANT TO THIS PROJECT. IT IS NOT | | CLEAR WHICH DO APPLY, SUCH AS SCIENCE LABS, | | WOODWORKING. REVISE TO CLARIFY WHICH USES ARE | | APPLICABLE, OR REMOVE THOSE NOT APPLICABLE. | | | | 7. FBC 107, AS THIS PERMIT WAS READY FOR ISSUANCE, | | SUPPLEMENTARY INFORMATION WHICH IS NO LONGER APPLICABLE | | IS IN THE PACKAGE (SUCH AS ENERGY CALCS). PLEASE TREAT | | THESE THE SAME AS PLANS; THE ONES WHICH SHOULD BE | | REMOVED SHOULD BE MARKED VOID AND RETAINED SEPARATELY, | | WITH THE VOIDED PLAN SHEETS. ASSEMBLE TWO SETS OF | | SUPPLEMENTARY DOCUMENTS FOR REVIEW. | | | | 8. IT IS NOT CLEAR IF THE STRUCTURAL CALCS PREVIOUSLY | | REVIEWED AND APPROVED ARE TO BE A PART OF THE PERMIT | | PACKAGE. THE BUILDING SIZE CHANGED, BUT NEW CALCS WERE | | NOT PROVIDED. IS IT THE INTENT THAT THE CALCS ALREADY | | PROVIDED BE UTILIZED AS THEY ARE MORE CONSERVATIVE, OR | | ARE THEY NOT TO BE INCLUDED IN THE PERMIT RECORD? | | | | 9. THE STRUCTURAL CALCS PREVIOUSLY SUBMITTED USE 180MPH | | AS DESIGN CRITERIA, PAGE S1.2 STATES 181MPH. CALCS | | STATE RISK CATEGORY III, S1.2 IS CATEGORY II (SEE FBC | | TABLE 1604.5). CALCS USE EXPOSURE D, S1.2 STATES DESIGN | | CRITERIA IS EXPOSURE C (THIS APPEARS TO BE EXPOSURE D, | | FBC 1609.4.3). | | | | REVISE S1.2 TO RISK CATEGORY III, EXPOSURE D, OR SEND | | JUSTIFICATION FOR PROPOSED WIND DESIGN CRITERIA VIA | | EMAIL IN ORDER TO GET THIS ISSUE RESOLVED PRIOR TO | | RESUBMITTAL. | | | | 10. 2 A3.4, NO HANDRAIL SHOWN ON THE STAIRS, FBC | | 1009.15. PLEASE ADVISE WHERE THE DETAIL FOR THE STAIR | | RAIL CAN BE FOUND (OR ADD DETAIL). | | | | 11. SEE PLUMBING COMMENTS REGARDING ACCESSIBILITY; ALL | | ARE APPLICABLE FOR BUILDING REVIEW. | | | | 12. P5.1 CONFLICTS WITH A1.6 ROOF DRAIN SIZES, FBC | | 1503.4. A1.6 APPEARS COMPLIANT BUT SIZING (3 IN) DOES | | NOT APPEAR ADEQUATE ON P5.1, PLEASE REVISE. | | | | 13. SEE THRESHOLD REVIEW. THREE SETS OF PLANS ARE | | REQUIRED FOR RESIDENT INSPECTOR PROJECTS. THIS ITEM HAS | | NOT BEEN ADDRESSED. IT IS NOT CLEAR WHETHER APPLICANT | | AGREES WITH RESIDENT INSPECTOR REQUIREMENT. PLEASE | | ADVISE PRIOR TO RESUBMITTAL OR ENSURE THAT THREE | | COMPLETE SETS OF PERMIT DOCUMENTS ARE PROVIDED AT TIME | | OF RESUBMITTAL. | | | | RESIDENT INSPECTOR DOCUMENTS (RESUMES, AGREEMENT) MAY | | BE SENT SEPARATELY FROM THE RESUBMITTAL VIA EMAIL. AS | | THIS REQUIRES A REVIEW BY PLAN REVIEW (VERIFICATION OF | | LICENSES, COMPLETENESS OF SUBMITTAL) AND THE CHIEF | | BUILDING INSPECTOR (APPROVAL OF PROPOSED INSPECTORS), | | APPLICANT IS ENCOURAGED TO SUBMIT DOCUMENTS AS SOON AS | | THEY ARE AVAILABLE. | | | | 14. IMPACT FEE ASSESSMENT BY PALM BEACH COUNTY IS | | REQUIRED PRIOR TO PERMIT ISSUANCE. THIS MAY BE DONE | | AFTER ALL PLAN REVIEWS ARE COMPLETE AND PASSED. THE | | PLANS STAMPED BY PALM BEACH COUNTY AND THE RECEIPT | | SHOWING THAT FEES DUE HAVE BEEN PAID IS REQUIRED TO BE | | SUBMITTED. | | | | 15. PROVIDE PRODUCT APPROVALS FOR ALL COMPONENTS AND | | CLADDING. ANY PRODUCT APPROVALS NOT SUBMITTED PRIOR TO | | PERMIT ISSUANCE WILL BE REQUIRED TO BE SUBMITTED AS A | | REVISION PRIOR TO INSTALLATION. | | | | 16. OPTIONAL, PROVIDE UPDATED VALUE OF PROJECT, FBC | | 109. | | | | 17. ADVISORY ONLY: THE PROPOSED FLOOD MAPS (CURRENTLY | | SCHEDULED TO TAKE EFFECT IN EARLY 2017), SHOW A THE BFE | | FOR THIS LOCATION OF 8.519 NGVD29 (CONVERTED FROM 7.0 | | NAVD88). THEREFORE THE PROPOSED CONSTRUCTION (8.46 | | NGVD29) IS LOWER THAN THE 100 YEAR FLOOD EVENT BASED ON | | THE MOST RECENT DATA. AS FIRMS (AKA FEMA FLOOD MAPS) | | ARE ROUNDED TO THE NEAREST FOOT, IT IS POSSIBLE THAT | | THE ACTUAL BFE IS UP TO .4 FEET HIGHER. APPLICANT IS | | ENCOURAGED TO INVESTIGATE THIS ISSUE, FBC 1612. PLEASE | | FEEL FREE TO CONTACT ME IF YOU WOULD LIKE ADDITIONAL | | INFORMATION. | | | | THE PROPOSED MAPS ARE AVAILABLE AT THE FEMA WEBSITE | | (MAP SERVICE CENTER) AND ON THE PALM BEACH COUNTY GIS. | | THE RELATED PROPOSED FLOOD INSURANCE STUDY (FIS) IS | | AVAILABLE ON THE FEMA WEBSITE. | | | | HTTP://MSC.FEMA.GOV/PORTAL/SEARCH#SEARCHRESULTSANCHOR | | | | SEARCH FOR THE ADDRESS, | | SELECT "SHOW ALL PRODUCTS FOR THIS AREA" | | SELECT "PRELIMINARY PRODUCTS" | | PRELIMINARY FIS REPORTS AND PRELIMINARY FIRM PANELS | | | | 18. THIS PERMIT WILL BE ISSUED WITH THE FOLLOWING | | PROVISOS: | | | | BUILDING UNDER CONSTRUCTION ELEVATION CERTIFICATE OR | | FORM BOARD SURVEY SHOWING PROPOSED ELEVATIONS IS | | REQUIRED PRIOR TO CONCRETE POUR | | FINISHED CONSTRUCTION ELEVATION CERTIFICATE IS REQUIRED | | PRIOR TO FINAL INSPECTION. | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2016-01-20 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2016-01-20 |
Time |
16:31 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2016-01-19 |
Time |
15:29 |
Sent To |
|
|
Notes |
2016-01-20 16:31:49 | **PROVISOS** | | | | 1. SEPARATE PERMIT REQUIRED FOR DEMOLITION OF THE | | EXISTING STRUCTURE. A PERMIT APPLICATION AND THE DEMO | | PERMIT APPLICATION AND CHECKLIST ARE REQUIRED: | | | | HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/CONSTRU | | CTION/PERMITS | | | | 2. ART IN PUBLIC PLACES; WITHIN 90 DAYS AFTER PERMIT | | ISSUANCE, PROVIDE EVIDENCE OF COMPLIANCE WITH THE | | REQUIREMENTS OF CITY OF WEST PALM BEACH CODE OF | | ORDINANCES, ARTICLE V, ART IN PUBLIC PLACES, SECTION | | 78-123(A) AND SECTION 78-126(A). THIS INFORMATION MAY | | BE SENT VIA EMAIL TO [email protected]. | | | | 3. PROVIDE THE CONSTRUCTION DOCUMENTS ELEVATION | | CERTIFICATE VIA EMAIL FOR REVIEW. | | A FORM BOARD SURVEY AND BUILDING UNDER CONSTRUCTION | | ELEVATION CERTIFICATE IS REQUIRED PRIOR TO CONCRETE | | POUR. | | A FINISHED CONSTRUCTION ELEVATION CERTIFICATE IS | | REQUIRED PRIOR TO FINAL INSPECTION. | | | | 4. OCCUPANT LOAD IS REQUIRED FOR CO. SHEET LS1.0 | | INCLUDES TWO DIFFERENT OCCUPANT COUNTS (352 AND 369), | | PLEASE CORRELATE OR EXPLAIN DISCREPANCY. | | | | 5. SQUARE FOOT AREA IS REQUIRED FOR CO. LS1.0 STATES | | SQUARE FOOT AREA AS 23,576. LS1.1 AND 1.2 STATE AREA AS | | 22,213. PLEASE CORRELATE OR EXPLAIN DISCREPANCY. | | | | 6. USE OF THE SOLYX DECORATIVE WINDOW FILM ON EXTERIOR | | GLAZING SHALL BE APPROVED BY THE WINDOW MANUFACTURER. | | | | 7. ENGINEER TO REVISE FILE SET DESIGN PRESSURE CHARTS | | LABELS PER EMAIL, SHEET S6.1 (NO FURTHER ACTION | | REQUIRED). | | | | 8. SHEET S 7-3. FOR PROPOSED ALUMINUM TRELLIS/ CANOPY | | SYSTEM THE DELEGATE ENGINEER IS TO SUBMIT SHOP DRAWINGS | | FOR APPROVAL TO THE ENGINEER OF RECORD FOR REVIEW AND | | APPROVAL BEFORE SUBMISSION TO THE BUILDING DEPARTMENT. | | FL 61G-15-30.006 (3) THE DELEGATED ENGINEER SHALL | | FORWARD THE DELEGATED ENGINEERING DOCUMENTS TO THE | | ENGINEER OF RECORD FOR REVIEW. | | | | 9. 107.3.4.2 DEFERRED SUBMITTALS. FOR THE PURPOSES OF | | THIS SECTION, DEFERRED SUBMITTALS ARE | | DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE NOT | | SUBMITTED AT THE TIME OF THE APPLICATION AND THAT ARE | | TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A | | SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL | | HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE | | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE | | SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION | | DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. | | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE | | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN | | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD | | THEM TO THE BUILDING OFFICIAL WITH A NOTATION | | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE | | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO | | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL | | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED | | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING | | OFFICIAL. | | 2010 FBC-B 1609.1.2 PROTECTION OF OPENINGS, 1609.6.4.41 | | COMPONENTS & CLADDING. FLORIDA DEPARTMENT OF COMMUNITY | | AFFAIRS RULE 9N-3 NOV. 01/ 2010 (31) SUB-CATEGORY OF | | PRODUCTS OR CONSTRUCTION SYSTEMS THAT WILL REQUIRE | | PRODUCT APPROVALS: | | (31)(A) EXTERIOR DOORS. | | (B) WINDOWS | | (C) PANEL WALLS: STOREFRONTS, CURTAIN WALLS, WALL | | LOUVERS, EFIS SYSTEMS, | | (D) ROOFING PRODUCTS AND ASSEMBLIES | | (F) SKYLIGHTS | | G) ROOF TOP CURBS/ PRE- MANUFACTURED A/C STANDS | | | | 10. 2010 FBC 107.3.4.1 PRODUCT APPROVALS. THOSE | | PRODUCTS WHICH ARE REGULATED BY THE DCA RULE 9N-03 | | SHALL BE REVIEWED AND APPROVED IN WRITING BY THE | | DESIGNER OF RECORD PRIOR TO SUBMITTAL FOR | | JURISDICTIONAL APPROVAL. FL 61G1-23.015 (2) THE | | ARCHITECT IS RESPONSIBLE FOR SUPERVISING AND REVIEWING | | ALL PROJECT DATA, REPORTS, SHOP DRAWINGS ETC.. | | | | 11. CONSTRUCTION WORK OR OTHER WORK RESULTING IN NOISE, | | VIBRATIONS OR DUST TENDING TO DISTURB THE PEOPLE OR THE | | PROPERTY WITHIN THE VICINITY THEREOF SHALL NOT BEGIN | | UNTIL THE HOUR OF 7:00 A.M. AND SHALL CEASE AT THE HOUR | | OF 7:00 P.M., MONDAY THROUGH FRIDAY, AND SHALL BE | | LIMITED TO BETWEEN THE HOURS OF 8:00 A.M. AND 8:00 | | P.M., SATURDAY AND SUNDAY. EXCEPTIONS SHALL BE | | REQUESTED IN ADVANCE, IN WRITING. | | | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2015-10-05 |
|
|
Cont ID |
|
Sent By |
JWitmer |
Date |
2015-10-05 |
Time |
16:04 |
Rev Time |
0.00 |
Received By |
jwitmer |
Date |
2015-10-05 |
Time |
08:09 |
Sent To |
|
|
Notes |
2015-10-05 16:03:59 | BUILDING PLAN REVIEW | | W. P. B. PERMIT: 15020937 | | ADD: 1901 S. FLAGLER DR. | | CONT: IBIS BUILDING CORP. | | TEL: (561)318-8408 | | E-MAIL: [email protected] | | | | 2010 FLORIDA BUILDING CODE W | | * 2010 WEST PALM BEACH AMENDMENTS TO THE FLORIDA | | BUILDING CODE, CHAPTER 1, ADMINISTRATION, 2010 EDITION | | 2012 FBC SUPPLEMENTS ADOPTED APRIL 25/2013. | | 2ND REVIEW | | DATE: MON. OCT. 05 / 2015 | | ACTION: DENIED | | | | 1) 2ND REQUEST. THIS PROJECT WILL REQUIRE A RESIDENT | | INSPECTOR. | | 2010 WEST PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING | | CODE, CHAPTER 1, ADMINISTRATION, 110.3.9 OTHER | | INSPECTIONS SERVICES. THE BUILDING OFFICIAL MAY MAKE, | | OR CAUSE TO BE MADE BY OTHERS, THE INSPECTIONS REQUIRED | | BY SECTION 109. HE/SHE MAY ACCEPT REPORTS OF INSPECTORS | | OF RECOGNIZED INSPECTION SERVICES, PROVIDED THAT AFTER | | INVESTIGATION HE/SHE IS SATISFIED AS TO THEIR | | QUALIFICATIONS AND RELIABILITY. A CERTIFICATE CALLED | | FOR BY ANY PROVISION OF THE TECHNICAL CODES SHALL NOT | | BE BASED ON SUCH REPORTS UNLESS THE SAME ARE IN WRITING | | AND CERTIFIED BY A RESPONSIBLE OFFICER OF SUCH SERVICE. | | THE BUILDING OFFICIAL MAY REQUIRE THE OWNER TO EMPLOY | | AN INSPECTION SERVICE IN THE FOLLOWING INSTANCES: | | | | 1. FOR BUILDINGS OR ADDITIONS OF TYPE I OR II | | CONSTRUCTION | | 2. FOR ALL MAJOR STRUCTURAL ALTERATIONS | | 3. WHERE THE CONCRETE DESIGN IS BASED ON COMPRESSIVE | | STRENGTH (F ?C) IN EXCESS OF 3000 | | POUNDS PER SQUARE INCH | | 4. FOR PILE DRIVING | | 5. FOR BUILDINGS WITH AREA GREATER THAN 20,000 SQUARE | | FOOT | | 6. FOR BUILDINGS MORE THAN 2 STORIES IN HEIGHT | | 7. FOR BUILDINGS AND STRUCTURES OF UNUSUAL DESIGN OR | | METHODS OF CONSTRUCTION | | | | 1A) FOR THE RESIDENT INSPECTOR PLEASE PROVIDE A RESUME' | | OF INSPECTION EXPERIENCE ON PREVIOUS PROJECT. THE | | RESUME' MUST BE ACCOMPANIED BY ALL CERTIFICATES AS | | SPECIFIED HEREIN. THE BUILDING OFFICIAL OR HIS DESIGNEE | | WILL REVIEW THE RESUME'. AFTER THE RESUME' IS REVIEWED, | | AN INTERVIEW WILL BE SCHEDULED. UNDER NO CIRCUMSTANCES | | WILL AN INSPECTOR BE INTERVIEWED FOR WORK WITHOUT FIRST | | MEETING THE ABOVE CRITERIA. | | CONTACT KEN CONRAD | | TEL: 561-805-6666 | | E-MAIL: [email protected] | | | | 1B) THE CONTRACTOR WILL PRODUCE A JOB SUMMARY OR | | HISTORY FOR THIS TYPE OF CONSTRUCTION. THIS MAY BE | | SUBMITTED TO KEN CONRAD BY E-MAIL. KEN CONRAD: | | [email protected] | | | | 1C) NOTE FOR PAPER PLANS 3 SETS OF DOCUMENTS ARE | | REQUIRED INCLUDING SOILS REPORTS, ENERGY CALCS AND | | PRODUCT APPROVALS. FOR DIGITAL PLANS, AFTER PERMIT | | ISSUANCE, THE PERMIT LIBRARIAN WILL E-MAIL YOU, THE | | APPROVED AND BATCH STAMPED PLANS SO YOU MAY PRINT YOUR | | PLANS, TWO SETS OF PLANS WILL NEED TO BE PRINTED IN | | COLOR, (1) FOR THE RESIDENT INSPECTOR, THE OTHER FOR | | THE MEP INSPECTORS. | | | | 1D) PLEASE CALL THE CITY OF WEST PALM BEACH?S AUTOMATED | | TELEPHONE INSPECTIONS LINE (561) 805-6700) FOR | | IN-PROGRESS INSPECTIONS FOR AUDITING OF JOBSITE | | INSPECTIONS. | | | | 2)PROVISO: NOTICE: ART IN PUBLIC PLACES | | | | THE CITY OF WEST PALM BEACH ART IN PUBLIC PLACES | | ORDINANCE REQUIREMENT THAT APPLIES TO ANY REMODEL OR | | NEW CONSTRUCTION PROJECT FOR WHICH THE PERMIT | | APPLICATION WAS SUBMITTED AFTER 7/1/14, AND THE TOTAL | | PROJECT CONSTRUCTION COSTS ARE EQUAL TO OR GREATER THAN | | $500,000. PER CITY OF WEST PALM BEACH ORDINANCE NO. | | 4504-14, AND CITY OF WEST PALM BEACH CODE OF | | ORDINANCES, ARTICLE V, ART IN PUBLIC PLACES, SECTION | | 78-123(A) AND SECTION 78-126(A), THE ART ASSESSMENT IS | | 1% OF THE TOTAL PROJECT CONSTRUCTION COST. | | | | PER CITY OF WEST PALM BEACH CODE OF ORDINANCES, ARTICLE | | V, ART IN PUBLIC PLACES, SECTION 78-122, RENOVATION AND | | NEW CONSTRUCTION PROJECTS ARE ASSESSED CUMULATIVELY, SO | | THE ART ASSESSMENT WILL BE APPLICABLE TO ALL FUTURE | | PROJECTS. | | | | 3)2ND REQUEST. FLOOD ZONE CERTIFICATES | | FBC BUILDING SECTION 1612 AND CITY OF WPB CODE OF | | ORDINANCES SECTION 94-546. STRUCTURE IS LOCATED IN AN | | "A5" FLOOD ZONE. A FLOOD ELEVATION CERTIFICATE WILL BE | | REQUIRED. PLEASE REVIEW CITY ORDINANCE FOR THE CITY | | REQUIREMENTS REQUIRE AN ADDITIONAL 6 INCHES OF | | ELEVATION MINIMUM. | | | | DURING THE PERMITTING OF THIS STRUCTURE THERE WILL BE | | REQUIRED (3) DIFFERENT FLOOD ZONE CERTIFICATES | | REQUIRED: | | (1) A FLOOD ZONE CERTIFICATE IS REQUIRED AS PART OF THE | | PLAN REVIEW DOCUMENTS WITH THE PROPOSED FINISH | | FLOOR HEIGHT. | | (2) ONCE THE FIRST FLOOR SLAB IS POURED THE 2ND | | ELEVATION CERTIFICATE IS REQUIRED | | (3) BEFORE THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY | | OR A CERTIFICATE OF COMPLETION THE 3RD FLOOD ZONE | | CERTIFICATE IS REQUIRED WITH THE HEIGHT OF ALL EXTERIOR | | ATTENDANTS A/C PADS OR OTHER SLABS FOR | | GENERATORS. | | FEMA FORM OMB NO. 1660-0008 EXPIRES: JULY 31/2015. | | FEMA'S NEW ELEVATION CERTIFICATE (EC) WAS APPROVED FOR | | USE, EFFECTIVE AUGUST 1/ 2013, THROUGH JULY 31/ 2015. | | FORM. ADDITIONAL INFORMATION ON THE DIFFERENCES, THE | | NEW FORM, AND INSTRUCTIONS ARE AVAILABLE AT: | | HTTP://WWW.FEMA.GOV/BUSINESS/NFIP/ELVINST.SHTM | | | | 4) 2ND REQUEST. MISSING SOILS REPORT, WILL REQUIRE 3 | | ORIGINALS FOR PAPER PLANS. FBC-B 1803.5.2 QUESTIONABLE | | SOIL. | | WHERE THE CLASSIFICATION, STRENGTH OR COMPRESSIBILITY | | OF THE SOIL IS IN DOUBT OR WHERE A LOAD-BEARING VALUE | | SUPERIOR TO THAT SPECIFIED IN THIS CODE IS CLAIMED, THE | | BUILDING OFFICIAL SHALL BE PERMITTED TO REQUIRE THAT A | | GEOTECHNICAL INVESTIGATION BE CONDUCTED.5) THE PERMIT | | APPLIED VALUE IS STATED AS $4,055,000 THE CALCULATED | | VALUE IS $4,131,694.00 IN VALUE. W P B ADMINISTRATIVE | | CODE 108.2 SCHEDULE OF PERMIT FEES. ON BUILDINGS, | | STRUCTURES, ELECTRICAL, GAS, MECHANICAL AND PLUMBING | | SYSTEMS OR ALTERATIONS REQUIRING A PERMIT, A FEE FOR | | EACH PERMIT SHALL BE PAID AS REQUIRED, IN ACCORDANCE | | WITH THE SCHEDULE ESTABLISHED BY THE APPLICABLE | | GOVERNING AUTHORITY. | | | | | | 5) COMPLIED> ADJUSTED VALUE TO CALCULATED VALUE. THE | | PERMIT APPLIED VALUE IS STATED AS $4,055,000 THE | | | | 6-7) COMPLIED | | 8) SEMI-COMPLIED. RESPONSE INDICATED ROOM 1-0004. SHEET | | LS 1.1 ROOMS 1-104 (COMPLIED 1-190) ARE MISSING THE | | EXIT SIGNS TO BE LOCATED AT THE EXIT DOORWAY OF THE | | ROOM, FBC-B 1006.3.8. | | | | 9-12) COMPLIED. | | | | 13) SEMI-COMPLIED. SHEET A8.4 COMPLIES, THE ISSUE IS | | WITH SHEET A5.2 DETAIL 01 HAS HORIZONTAL MULLIONS, THE | | HORIZONTAL MULLIONS DOESN?T WORK WITH WATER CURTAINS. | | SHEET LS 1.2 SHOWS AN 2 STORY ATRIUM ON THE SECOND | | FLOOR BUT THERE IS NO ENCLOSURE AROUND THE ATRIUM NOR | | COMPLIANCE WITH FBC-B 404.6 ENCLOSURES OF ATRIUMS OR | | EXCEPTIONS. | | | | 14) COMPLIED . VERTICAL ACCESSIBILITY. | | | | 15-223B) COMPLIED | | 23C) SEMI-COMPLIED. ROOF PRESSURES ARE GOOD. THE VULT | | NEGATIVE PRESSURES ARE LOW IN WALL ZONES 4 AND 5 | | NEGATIVE PRESSURES ARE TAKEN AT THE ROOF LEVEL. SINCE | | THE VULT ARE LOW ALL OF THE NEGATIVE VASD ARE LOW. | | SHEET S6.1 ELEVATIONS WITH ASSOCIATED PRESSURES WILL | | NEED TO BE WORKED TO REFLECT THE 180 VULT, EXPOSURE D | | AND MEAN ROOF HEIGHT OF 28.33 FT. PLEASE SHOW PRESSURES | | IN VASD SINCE THE PRODUCT APPROVALS ARE LISTED IN VASD. | | FBC-B 1609.1.5 TESTING TO ALLOWABLE OR NOMINAL LOADS. | | 23D-25) COMPLIED. | | | | 26) PROVISO: SHEET S 7-3. FOR PROPOSED ALUMINUM | | TRELLIS/ CANOPY SYSTEM THE DELEGATE ENGINEER IS TO | | SUBMIT SHOP DRAWINGS FOR APPROVAL TO THE ENGINEER OF | | RECORD FOR REVIEW AND APPROVAL BEFORE SUBMISSION TO THE | | BUILDING DEPARTMENT. FL 61G-15-30.006 (3) THE DELEGATED | | ENGINEER SHALL FORWARD THE DELEGATED ENGINEERING | | DOCUMENTS TO THE ENGINEER OF RECORD FOR REVIEW. | | | | | | 27) PROVISO: 107.3.4.2 DEFERRED SUBMITTALS. FOR THE | | PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS ARE | | DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE NOT | | SUBMITTED AT THE TIME OF THE APPLICATION AND THAT ARE | | TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A | | SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL | | HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE | | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE | | SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION | | DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. | | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE | | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN | | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD | | THEM TO THE BUILDING OFFICIAL WITH A NOTATION | | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE | | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO | | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL | | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED | | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING | | OFFICIAL. | | 2010 FBC-B 1609.1.2 PROTECTION OF OPENINGS, 1609.6.4.41 | | COMPONENTS & CLADDING. FLORIDA DEPARTMENT OF COMMUNITY | | AFFAIRS RULE 9N-3 NOV. 01/ 2010 (31) SUB-CATEGORY OF | | PRODUCTS OR CONSTRUCTION SYSTEMS THAT WILL REQUIRE | | PRODUCT APPROVALS: | | (31)(A) EXTERIOR DOORS. | | (B) WINDOWS | | (C) PANEL WALLS: STOREFRONTS, CURTAIN WALLS, WALL | | LOUVERS, EFIS SYSTEMS, | | (D) ROOFING PRODUCTS AND ASSEMBLIES | | (F) SKYLIGHTS | | G) ROOF TOP CURBS/ PRE- MANUFACTURED A/C STANDS | | 28) PROVISO: 2010 FBC 107.3.4.1 PRODUCT APPROVALS. | | THOSE PRODUCTS WHICH ARE REGULATED BY THE DCA RULE | | 9N-03 SHALL BE REVIEWED AND APPROVED IN WRITING BY THE | | DESIGNER OF RECORD PRIOR TO SUBMITTAL FOR | | JURISDICTIONAL APPROVAL. | | FL 61G1-23.015 (2) THE ARCHITECT IS RESPONSIBLE FOR | | SUPERVISING AND REVIEWING ALL PROJECT DATA, REPORTS, | | SHOP DRAWINGS ETC.. | | | | 29) IMPACT FEES. BEFORE A PERMIT TO CONSTRUCT, MAY BE | | ISSUED, IMPACT FEES MUST BE PAID TO PALM BEACH COUNTY. | | THE ACTUAL PERMIT SET OF PLANS MUST BE STAMPED BY THAT | | OFFICE, AND A COPY OF THE PAID RECEIPT ATTACHED TO THE | | PERMIT APPLICATION. PLEASE CALL (561)233-5025 FOR MORE | | INFORMATION. | | | | 30) WHEN RESUBMITTING PLANS PLEASE INDICATE THE | | REVISION & REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES | | AS NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL | | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE | | REVISION MADE, IDENTIFYING THE SHEET OR SPECIFICATION | | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO | | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED | | COOPERATION. | | JAMES A. WITMER CBO | | SENIOR COMMERCIAL COMBINATION PLANS EXAMINER | | TEL: 561-805-6715 | | FAX: 561-805-6676 | | E-MAIL: [email protected] | | | | | | | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2015-03-26 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2015-03-26 |
Time |
13:28 |
Rev Time |
|
Received By |
shill |
Date |
2015-03-23 |
Time |
|
Sent To |
|
|
Notes |
2015-03-26 13:28:42 | | | BUILDING PLAN REVIEW | | W. P. B. PERMIT: 15020937 | | ADD: 1901 S. FLAGLER DR. | | CONT: IBIS BUILDING CORP. | | TEL: (561)318-8408 | | E-MAIL: [email protected] | | | | 2010 FLORIDA BUILDING CODE W | | * 2010 WEST PALM BEACH AMENDMENTS TO THE FLORIDA | | BUILDING CODE, CHAPTER 1, ADMINISTRATION, 2010 EDITION | | 2012 FBC SUPPLEMENTS ADOPTED APRIL 25/2013. | | | | IMPORTANT NOTICE: EFFECTIVE MARCH 30, 2015 | | ALL PERMIT APPLICATION PLAN REVIEWS WILL BE PERFORMED | | ELECTRONICALLY | | UPON APPLICATION AND FEE PAYMENT DESIGN DOCUMENTS | | SUBMISSION OPTIONS ARE AS FOLLOWS: | | 1 UPLOAD VIA THE PROJECT DOX PORTAL WITH DIGITAL | | SIGNATURES OF DESIGN PROFESSIONALS AS APPLICABLE; USE | | THE REQUIRED NAMING CONVENTION FOR EACH DOCUMENT | | 2 INCLUDE ON A CD IF DESIGN PROFESSIONAL DIGITAL | | SIGNATURES ARE PROVIDED AS REQUIRED; USE THE REQUIRED | | NAMING CONVENTION FOR EACH DOCUMENT | | 3 INCLUDE ON A CD WITH ONE SET OF TRADITIONAL PAPER | | DESIGN DOCUMENTS SIGNED AND SEALED AS REQUIRED; USE THE | | REQUIRED NAMING CONVENTION FOR EACH DOCUMENT | | 4 ONE SET OF TRADITIONAL PAPER DESIGN DOCUMENTS SUBJECT | | TO ADMINISTRATIVE FEES TO DIGITIZE THE DOCUMENTS | | ADDITIONAL INFORMATION WILL BE PROVIDED WHEN IT BECOMES | | AVAILABLE | | | | 1ST REVIEW | | DATE: TUES. MARCH 24/ 2015 | | ACTION: DENIED | | | | 1)THIS PROJECT WILL REQUIRE A RESIDENT INSPECTOR. | | 2010 WEST PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING | | CODE, CHAPTER 1, ADMINISTRATION, 110.3.9 OTHER | | INSPECTIONS SERVICES. THE BUILDING OFFICIAL MAY MAKE, | | OR CAUSE TO BE MADE BY OTHERS, THE INSPECTIONS REQUIRED | | BY SECTION 109. HE/SHE MAY ACCEPT REPORTS OF INSPECTORS | | OF RECOGNIZED INSPECTION SERVICES, PROVIDED THAT AFTER | | INVESTIGATION HE/SHE IS SATISFIED AS TO THEIR | | QUALIFICATIONS AND RELIABILITY. A CERTIFICATE CALLED | | FOR BY ANY PROVISION OF THE TECHNICAL CODES SHALL NOT | | BE BASED ON SUCH REPORTS UNLESS THE SAME ARE IN WRITING | | AND CERTIFIED BY A RESPONSIBLE OFFICER OF SUCH SERVICE. | | THE BUILDING OFFICIAL MAY REQUIRE THE OWNER TO EMPLOY | | AN INSPECTION SERVICE IN THE FOLLOWING INSTANCES: | | | | 1. FOR BUILDINGS OR ADDITIONS OF TYPE I OR II | | CONSTRUCTION | | 2. FOR ALL MAJOR STRUCTURAL ALTERATIONS | | 3. WHERE THE CONCRETE DESIGN IS BASED ON COMPRESSIVE | | STRENGTH (F ?C) IN EXCESS OF 3000 | | POUNDS PER SQUARE INCH | | 4. FOR PILE DRIVING | | 5. FOR BUILDINGS WITH AREA GREATER THAN 20,000 SQUARE | | FOOT | | 6. FOR BUILDINGS MORE THAN 2 STORIES IN HEIGHT | | 7. FOR BUILDINGS AND STRUCTURES OF UNUSUAL DESIGN OR | | METHODS OF CONSTRUCTION | | | | 1A) FOR THE RESIDENT INSPECTOR PLEASE PROVIDE A RESUME' | | OF INSPECTION EXPERIENCE ON PREVIOUS PROJECT. THE | | RESUME' MUST BE ACCOMPANIED BY ALL CERTIFICATES AS | | SPECIFIED HEREIN. THE BUILDING OFFICIAL OR HIS DESIGNEE | | WILL REVIEW THE RESUME'. AFTER THE RESUME' IS REVIEWED, | | AN INTERVIEW WILL BE SCHEDULED. UNDER NO CIRCUMSTANCES | | WILL AN INSPECTOR BE INTERVIEWED FOR WORK WITHOUT FIRST | | MEETING THE ABOVE CRITERIA. | | CONTACT KEN CONRAD | | TEL: 561-805-6666 | | E-MAIL: [email protected] | | | | 1B) THE CONTRACTOR WILL PRODUCE A JOB SUMMARY OR | | HISTORY FOR THIS TYPE OF CONSTRUCTION. THIS MAY BE | | SUBMITTED TO KEN CONRAD BY E-MAIL. KEN CONRAD: | | [email protected] | | | | 1C) NOTE FOR PAPER PLANS 3 SETS OF DOCUMENTS ARE | | REQUIRED INCLUDING SOILS REPORTS, ENERGY CALCS AND | | PRODUCT APPROVALS. FOR DIGITAL PLANS, AFTER PERMIT | | ISSUANCE, THE PERMIT LIBRARIAN WILL E-MAIL YOU, THE | | APPROVED AND BATCH STAMPED PLANS SO YOU MAY PRINT YOUR | | PLANS, TWO SETS OF PLANS WILL NEED TO BE PRINTED IN | | COLOR, (1) FOR THE RESIDENT INSPECTOR, THE OTHER FOR | | THE MEP INSPECTORS. | | | | 1D) PLEASE CALL THE CITY OF WEST PALM BEACH?S AUTOMATED | | TELEPHONE INSPECTIONS LINE (561) 805-6700) FOR | | IN-PROGRESS INSPECTIONS FOR AUDITING OF JOBSITE | | INSPECTIONS. | | | | 2) NOTICE: ART IN PUBLIC PLACES | | | | THE CITY OF WEST PALM BEACH ART IN PUBLIC PLACES | | ORDINANCE REQUIREMENT THAT APPLIES TO ANY REMODEL OR | | NEW CONSTRUCTION PROJECT FOR WHICH THE PERMIT | | APPLICATION WAS SUBMITTED AFTER 7/1/14, AND THE TOTAL | | PROJECT CONSTRUCTION COSTS ARE EQUAL TO OR GREATER THAN | | $500,000. PER CITY OF WEST PALM BEACH ORDINANCE NO. | | 4504-14, AND CITY OF WEST PALM BEACH CODE OF | | ORDINANCES, ARTICLE V, ART IN PUBLIC PLACES, SECTION | | 78-123(A) AND SECTION 78-126(A), THE ART ASSESSMENT IS | | 1% OF THE TOTAL PROJECT CONSTRUCTION COST. | | | | PER CITY OF WEST PALM BEACH CODE OF ORDINANCES, ARTICLE | | V, ART IN PUBLIC PLACES, SECTION 78-122, RENOVATION AND | | NEW CONSTRUCTION PROJECTS ARE ASSESSED CUMULATIVELY, SO | | THE ART ASSESSMENT WILL BE APPLICABLE TO ALL FUTURE | | PROJECTS. | | | | 3) FLOOD ZONE CERTIFICATES | | FBC BUILDING SECTION 1612 AND CITY OF WPB CODE OF | | ORDINANCES SECTION 94-546. STRUCTURE IS LOCATED IN AN | | "A5" FLOOD ZONE. A FLOOD ELEVATION CERTIFICATE WILL BE | | REQUIRED. PLEASE REVIEW CITY ORDINANCE FOR THE CITY | | REQUIREMENTS REQUIRE AN ADDITIONAL 6 INCHES OF | | ELEVATION MINIMUM. | | | | DURING THE PERMITTING OF THIS STRUCTURE THERE WILL BE | | REQUIRED (3) DIFFERENT FLOOD ZONE CERTIFICATES | | REQUIRED: | | (1) A FLOOD ZONE CERTIFICATE IS REQUIRED AS PART OF THE | | PLAN REVIEW DOCUMENTS WITH THE PROPOSED FINISH | | FLOOR HEIGHT. | | (2) ONCE THE FIRST FLOOR SLAB IS POURED THE 2ND | | ELEVATION CERTIFICATE IS REQUIRED | | (3) BEFORE THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY | | OR A CERTIFICATE OF COMPLETION THE 3RD FLOOD ZONE | | CERTIFICATE IS REQUIRED WITH THE HEIGHT OF ALL EXTERIOR | | ATTENDANTS A/C PADS OR OTHER SLABS FOR | | GENERATORS. | | FEMA FORM OMB NO. 1660-0008 EXPIRES: JULY 31/2015. | | FEMA'S NEW ELEVATION CERTIFICATE (EC) WAS APPROVED FOR | | USE, EFFECTIVE AUGUST 1/ 2013, THROUGH JULY 31/ 2015. | | FORM. ADDITIONAL INFORMATION ON THE DIFFERENCES, THE | | NEW FORM, AND INSTRUCTIONS ARE AVAILABLE AT: | | HTTP://WWW.FEMA.GOV/BUSINESS/NFIP/ELVINST.SHTM | | | | 4) MISSING SOILS REPORT, WILL REQUIRE 3 ORIGINALS FOR | | PAPER PLANS. FBC-B 1803.5.2 QUESTIONABLE SOIL. | | WHERE THE CLASSIFICATION, STRENGTH OR COMPRESSIBILITY | | OF THE SOIL IS IN DOUBT OR WHERE A LOAD-BEARING VALUE | | SUPERIOR TO THAT SPECIFIED IN THIS CODE IS CLAIMED, THE | | BUILDING OFFICIAL SHALL BE PERMITTED TO REQUIRE THAT A | | GEOTECHNICAL INVESTIGATION BE CONDUCTED.5) THE PERMIT | | APPLIED VALUE IS STATED AS $4,055,000 THE CALCULATED | | VALUE IS $4,131,694.00 IN VALUE. W P B ADMINISTRATIVE | | CODE 108.2 SCHEDULE OF PERMIT FEES. ON BUILDINGS, | | STRUCTURES, ELECTRICAL, GAS, MECHANICAL AND PLUMBING | | SYSTEMS OR ALTERATIONS REQUIRING A PERMIT, A FEE FOR | | EACH PERMIT SHALL BE PAID AS REQUIRED, IN ACCORDANCE | | WITH THE SCHEDULE ESTABLISHED BY THE APPLICABLE | | GOVERNING AUTHORITY. | | | | | | 5) THE PERMIT APPLIED VALUE IS STATED AS $4,055,000 THE | | CALCULATED VALUE IS $4,131,694.00 IN VALUE. | | THE PERMIT APPLIED VALUE IS STATED AS $4,055,000 THE | | CALCULATED VALUE IS $4,131,694.00 IN VALUE. W P B | | ADMINISTRATIVE CODE 108.2 SCHEDULE OF PERMIT FEES. ON | | BUILDINGS, STRUCTURES, ELECTRICAL, GAS, MECHANICAL AND | | PLUMBING SYSTEMS OR ALTERATIONS REQUIRING A PERMIT, A | | FEE FOR EACH PERMIT SHALL BE PAID AS REQUIRED, IN | | ACCORDANCE WITH THE SCHEDULE ESTABLISHED BY THE | | APPLICABLE GOVERNING AUTHORITY. | | | | 108.3* BUILDING PERMIT VALUATION. | | IF, IN THE OPINION OF THE BUILDING OFFICIAL, THE | | CLAIMED VALUATION OF BUILDING, ALTERATION, STRUCTURE, | | ELECTRICAL, GAS, MECHANICAL, OR PLUMBING SYSTEMS | | APPEARS TO BE UNDER ESTIMATED ON THE APPLICATION, THE | | PERMIT SHALL BE DENIED. FOR PERMITTING PURPOSES, | | VALUATION OF BUILDINGS AND SYSTEMS SHALL BE TOTAL | | REPLACEMENT PURPOSES, VALUATION OF BUILDINGS AND | | SYSTEMS SHALL BE THE TOTAL REPLACEMENT VALUE TO INCLUDE | | STRUCTURAL, ELECTRICAL, PLUMBING, MECHANICAL, INTERIOR | | FINISHES, NORMAL SITE WORK (EXCAVATION AND BACKFILL FOR | | BUILDINGS), ARCHITECTURAL AND DESIGN FEES, MARKETING | | COST, OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE. | | VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED | | DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES | | (MARSHALL-SWIFT, MEANS, ETC.) WITH REGIONAL ADJUSTMENTS | | FOR LOCATION AS PUBLISHED BY THE INTERNATIONAL CODE | | CONGRESS. | | | | 6) SHEETS LS1.1 & LS1.2 BOTH SHOW STUDENT ROOMS WITH A | | OCCUPANT LOAD OF 35 SQUARE FEET PER OCCUPANT, THIS MAY | | BE A STATE STANDARD, BUT THE 2010 FBC-B TABLE | | 1004.1.1FOR EDUCATIONAL CLASSROOMS USES 20 SQUARE FEET | | PER OCCUPANT. NOTE A MATRIX MAY BE REQUIRED SHOWING THE | | REQUIRED CLASSROOM LOADS FOR EACH CODE. THE OCCUPANT | | LOAD WILL INCREASE WITH THIS NEW LOADING, DOORWAYS, & | | STAIRS WILL NOT BE ABLE TO CALCULATE REQUIRED EGRESS | | WIDTHS. | | | | 7) SHEET LS1.1 & LS 1.2 THE TOTAL OCCUPANT LOAD OF 352 | | IS PROVIDED, THIS BUILDING NEEDS TO BE CLASSIFIED AS A | | RISK CATEGORY III BUILDING. SHEET S-5.1 SHOWS THE RISK | | CATEGORY AS A CATEGORY III BUT THE WIND DESIGN | | PARAMETER IS 170 VULT PLEASE REVIEW FIGURE 1609B IN THE | | 2010 FBC-B THIS SHOULD BE A 180 VULT WIND ZONE, 2010 | | FBC-B TABLE 1604.5 ELEMENTARY SCHOOLS WITH OCCUPANT | | LOADS GREATER THAN 250. | | | | 8) SHEET LS 1.1 ROOMS 1-104 & 1-190 ARE MISSING THE | | EXIT SIGNS TO BE LOCATED AT THE EXIT DOORWAY OF THE | | ROOM, FBC-B 1006.3.8. | | | | 9) SHEET LS 1.1 ROOM 1-104 THE WINDOWS NEXT TO THE | | SOUTHERN STAIRWELL ARE WITHIN 10 FEET OF THE STAIRWELL | | AND WILL NEED TO COMPLY WITH FBC-B 1022.6 AND THE 2007 | | FBC-B CODE COMMENTARY FIGURE 1020.1.4(1). | | 10) SHEET LS 1.1 THE NORTH STAIRWELL DOOR 1-004-2 SWING | | OUT PASSED ONE HALF OF THE REQUIRED EXIT (22 INCHES) IN | | THE TRAVEL TO REACH 180 DEGREES. 2010 FBC-B 1008.1.9.11 | | DURING ITS SWING, ANY DOOR IN A MEANS OF EGRESS SHALL | | LEAVE UNOBSTRUCTED AT LEAST ONE HALF OF THE REQUIRED | | WIDTH OF AN AISLE, CORRIDOR, PASSAGEWAY, OR LANDING, | | NOR PROJECT MORE THAN 7 INCHES (178 MM) INTO THE | | REQUIRED WIDTH OF AN AISLE, CORRIDOR, PASSAGEWAY OR | | LANDING, WHEN FULLY OPEN. | | | | 11) SHEET LS 1.1 ROOMS 1-111A STORAGE, 111-2 STORAGE, | | 1-180 CUSTODIAL & 1-190 MECH/ ELEC. ROOM WILL NEED TO | | COMPLY WITH 508.2.5.2 THIS SAME CONDITION WILL OCCUR ON | | THE SAME TYPE ROOMS OF THE 2ND FLOOR. | | | | FBC-B 508.2.5.2 NONFIRE-RESISTANCE-RATED SEPARATION AND | | PROTECTION. WHERE TABLE 508.2.5 PERMITS AN AUTOMATIC | | FIRE-EXTINGUISHING SYSTEM WITHOUT A FIRE BARRIER, THE | | INCIDENTAL ACCESSORY OCCUPANCIES SHALL BE SEPARATED | | FROM THE REMAINDER OF THE BUILDING BY CONSTRUCTION | | CAPABLE OF RESISTING THE PASSAGE OF SMOKE. THE WALLS | | SHALL EXTEND FROM THE TOP OF THE FOUNDATION OR FLOOR | | ASSEMBLY BELOW TO THE UNDERSIDE OF THE CEILING THAT IS | | A COMPONENT OF A FIRE-RESISTANCE-RATED FLOOR ASSEMBLY | | OR ROOF ASSEMBLY ABOVE OR TO THE UNDERSIDE OF THE FLOOR | | OR ROOF SHEATHING, DECK OR SLAB ABOVE. DOORS SHALL BE | | SELF- OR AUTOMATIC-CLOSING UPON DETECTION OF SMOKE IN | | ACCORDANCE WITH SECTION 715.4.8.3. DOORS SHALL NOT HAVE | | AIR TRANSFER OPENINGS AND SHALL NOT BE UNDERCUT IN | | EXCESS OF THE CLEARANCE PERMITTED IN ACCORDANCE WITH | | NFPA 80. WALLS SURROUNDING THE INCIDENTAL ACCESSORY | | OCCUPANCY SHALL NOT HAVE AIR TRANSFER OPENINGS UNLESS | | PROVIDED WITH SMOKE DAMPERS IN ACCORDANCE WITH SECTION | | 711.7. | | | | 12) SHEET LS 1.0 NOR LS 1.1 SHOW AN ASSUMED PROPERTY | | LINE BETWEEN THE NEW BUILDING AND THE EXISTING BUILDING | | TO THE WEST AND SOUTH OR IS THE DESIGNER OF RECORD | | GOING TO DECLARE COMPLIANCE WITH: | | 503.1.2 BUILDINGS ON SAME LOT. | | TABLE 602 FIRE-RESISTANCE RATING REQUIREMENTS FOR | | EXTERIOR WALLS BASED ON FIRE SEPARATION | | DISTANCE | | TABLE 705.8 | | MAXIMUM AREA OF EXTERIOR WALL OPENINGS BASED ON FIRE | | SEPARATION DISTANCE AND DEGREE OF OPENING PROTECTION | | | | 12) THE OTHER ISSUE IS THE PEDESTRIAN WALKWAYS BETWEEN | | BUILDINGS PLEASE SHOW COMPLIANCE WITH FBC-B 3104.5 FIRE | | BARRIERS BETWEEN PEDESTRIAN WALKWAYS AND BUILDINGS OR | | ONE OF THE EXCEPTIONS IT APPEARS THIS WALKWAY IS NOT | | FIRE SPRINKLERED SEE SHEETS FS2.1 & FS2.2. | | | | 13) SHEET LS 1.2 SHOWS AN 2 STORY ATRIUM ON THE SECOND | | FLOOR BUT THERE IS NO ENCLOSURE AROUND THE ATRIUM NOR | | COMPLIANCE WITH FBC-B 404.6 ENCLOSURES OF ATRIUMS OR | | EXCEPTIONS. | | | | 14) THE PLANS LS1.1 NOR LS 1.2 FAIL TO SHOW COMPLIANCE | | WITH VERTICAL ACCESSIBILITY. 201.1.1 VERTICAL | | ACCESSIBILITY. SECTIONS 553.501-553.513, F.S., AND THE | | ADA STANDARDS FOR ACCESSIBLE DESIGN DO NOT RELIEVE THE | | OWNER OF ANY BUILDING, STRUCTURE OR FACILITY GOVERNED | | BY THOSE SECTIONS FROM THE DUTY TO PROVIDE VERTICAL | | ACCESSIBILITY TO ALL LEVELS ABOVE AND BELOW THE | | OCCUPIABLE GRADE LEVEL REGARDLESS OF WHETHER THE | | STANDARDS REQUIRE AN ELEVATOR TO BE INSTALLED IN SUCH | | BUILDING, STRUCTURE OR FACILITY. | | | | 15) SHEET A6.2 DOOR DETAIL SHEET NOR THE T1 SHEET THE | | INDEX SHEET SHOW A DOOR SCHEDULE NOR DOOR HARDWARE | | SCHEDULE FOR THE 1ST & 2ND FLOOR DOORS. 107.3.5.1 | | MINIMUM PLAN REVIEW CRITERIA FOR COMMERCIAL | | BUILDINGS(7) DOORS AND HARDWARE. 2010 FBC-B TABLE 715.4 | | & 1008.1.10 PANIC AND FIRE EXIT HARDWARE. | | | | 16) THE LS1.1 LIST CHILDREN AS YOUNG AS 3 & 4 YEAR OLD | | IN SCHOOL. DOES THIS SCHOOL ALSO HAVE AFTER SCHOOL | | DAYCARE ? THIS WOULD THEN ALSO REQUIRE DOORS TO HAVE TO | | MEET THE REQUIREMENTS OF 436.2, 436.3 & 436.4. | | 17) OTHER ISSUES THAT DAYCARE WOULD HAVE TO INCORPORATE | | INTO THE PLANS ARE FBC-B 436.6.1 | | THE FOLLOWING ROOMS OR SPACES SHALL BE SEPARATED FROM | | THE REMAINDER OF THE BUILDING BY FIRE BARRIERS HAVING A | | FIRE RESISTANCE RATING OF NOT LESS THAN 1-HOUR OR SHALL | | BE PROTECTED BY AN APPROVED AUTOMATIC EXTINGUISHING | | SYSTEM. | | 2. ROOMS OR SPACES USED FOR THE STORAGE OF COMBUSTIBLE | | SUPPLIES IN QUANTITIES DEEMED HAZARDOUS BY THE BUILDING | | OFFICIAL. | | 3. ROOMS OR SPACES USED FOR THE STORAGE OF HAZARDOUS | | MATERIALS OR FLAMMABLE OR COMBUSTIBLE LIQUIDS IN | | QUANTITIES DEEMED HAZARDOUS BY RECOGNIZED STANDARDS. | | 4. JANITOR CLOSETS. | | EXCEPTION: DOORS TO JANITOR CLOSETS SHALL BE PERMITTED | | TO HAVE VENTILATING LOUVERS WHERE THE SPACE IS | | PROTECTED BY AUTOMATIC SPRINKLERS. | | NOTE AS IN 508.2.5.2 WITH A SPRINKLERED BUILDING THEY | | WOULD STILL NEED TO MEET THE REQUIREMENTS FOR RESISTING | | THE PASSAGE OF SMOKE. | | | | 18) RESTROOM DETAIL SHEET A8.3 WILL NEED TO INDICATE | | CODE COMPLIANCE WITH FBC-B 1210.2 1210.2 WALLS AND | | PARTITIONS. WALLS AND PARTITIONS WITHIN 2 FEET (610 MM) | | OF URINALS AND WATER CLOSETS SHALL HAVE A SMOOTH, HARD, | | NONABSORBENT SURFACE, TO A HEIGHT OF 4 FEET (1219 MM) | | ABOVE THE FLOOR, AND EXCEPT FOR STRUCTURAL ELEMENTS, | | THE MATERIALS USED IN SUCH WALLS SHALL BE OF A TYPE | | THAT IS NOT ADVERSELY AFFECTED BY MOISTURE. | | 2509.2 BASE FOR TILE. WATER-RESISTANT GYPSUM BACKING | | BOARD SHALL BE USED AS A BASE FOR TILE IN WATER CLOSET | | COMPARTMENT WALLS WHEN INSTALLED IN ACCORDANCE WITH | | GA-216 OR ASTM C 840 AND MANUFACTURER RECOMMENDATIONS. | | REGULAR GYPSUM WALLBOARD IS PERMITTED UNDER TILE OR | | WALL PANELS IN OTHER WALL AND CEILING AREAS WHEN | | INSTALLED IN ACCORDANCE WITH GA-216 OR ASTM C 840. | | | | 19) SHEET A10.2 THE OUTER HANDRAIL NOR SHEET A10.4 | | DEPICT HOW THIS HANDRAIL IS TO BE MOUNTED, THE PLANS | | INDICATE A DETAIL 01/A10.5 SHOW COMPLIANCE WITH FBC-B | | 1607.7.1. | | | | 20) SHEET A10.4 PLEASE CHECK THE STAIR RISERS FROM THE | | MID LANDING TO THE UPPER LANDING FOR THE RISER HEIGHT, | | IT APPEARS TO BE GREATER THAN 7 INCHES IN HEIGHT. FBC-B | | 1009.4.2. | | | | 21) SHEETS WALL SECTIONS A5.1-5.8, THE NOTES FOR TYPE | | OF CEILING REFER TO CEILING SCHEDULE, THE PLANS ARE | | MISSING THE CEILING PLANS, THEY ARE ALSO MISSING IN THE | | T1 SHEET THE INDEX SHEET. 107.2.1.3 ADDITIONAL | | INFORMATION IS REQUIRED. | | | | 22) SHEET A9.1 AND A9.2 SHOWS DROPPED CEILINGS WITH | | WHAT APPEARS TO BE CEILING TILE COMPLIANCE WITH FBC-B | | 2603.5.2 THERMAL BARRIERS CANNOT BE DETERMINED. | | | | 23) SHEET S-5.1 THE WIND DESIGN CRITERIA SHOW THE | | BUILDING BEING DESIGNED TO 170 VULT, EXPOSURE D AND A | | BUILDING RISK CATEGORY III. | | 23A) BUILDINGS CLASSIFIED AS A RISK CATEGORY III | | (ELEMENTARY SCHOOLS W/ AN OCCUPANT LOAD. 250 TABLE | | 1604.5) ARE TO BE DESIGNED TO A 180 VULT WIND ZONE SEE | | 2010 FBC-B FIGURE 1609B. | | | | 23B) SHEET S5.2 THE VULT AND VASD CHARTS ARE EXTREMELY | | LOW FOR 180 VULT, EXPOSURE D AND A MEAN ROOF HEIGHT OF | | 28 FT. 4 INCHES FOR EXAMPLE THE ZONE 3 @ 10 SQ. FT | | SHOULD BE AROUND 241.4 VULT. | | | | 23C) SHEET S6.1 ELEVATIONS WITH ASSOCIATED PRESSURES | | WILL NEED TO BE WORKED TO REFLECT THE 180 VULT, | | EXPOSURE D AND MEAN ROOF HEIGHT OF 28.33 FT. PLEASE | | SHOW PRESSURES IN VASD SINCE THE PRODUCT APPROVALS ARE | | LISTED IN VASD. FBC-B 1609.1.5 TESTING TO ALLOWABLE OR | | NOMINAL LOADS. | | 23D) SHEET S5.2 THE PRESSURE CHART FOR THE ROOFING | | ZONES TAKES CREDIT FOR A 3?-0? PARAPET IN ROOF ZONE 3 | | WITH THE SAME PRESSURES AS ROOF ZONE # 2. SHEET S3.1 | | LIST THE ROOF DECK HEIGHT AT 128 FT. 4 INCHES PLUS ROOF | | TOP INSULATION, WHILE THE PARAPET HEIGHT IS GIVEN AT | | 130FT. THE DIFFERENCE BETWEEN THE FINISH ROOF HEIGHT | | AND PARAPET IS LESS THAN 2?-0?. | | | | 23E) SHEET S-3.1 DOES NOT INDICATE WHAT TYPE OF | | MATERIAL IS GOING ON TOP OF THIS DECK? IF LIGHTWEIGHT | | CONCRETE, AND OR INSULATION? SHEET A4.1 INDICATES THE | | ROOF DECK TO BE R-30 TAPERED INSULATION OVER METAL | | DECK? THE ENERGY CALCULATIONS INDICATE FOR HORIZONTAL | | ROOF 5 IN. HEAVY WEIGHT CONCRETE AND 5 INCH GENERIC AS | | WELL AS R-19 GENERIC INSULATION. 107.2.1.3 ADDITIONAL | | INFORMATION IS REQUIRED. | | | | 24) SHEET A2.2 DETAIL 07 ROOF TOP ACCESS HATCH WILL | | NEED TO PROVIDE COMPLIANCE WITH FBC-B 1013.6. | | | | 25) SHEET A2.1 INDICATES THE USE OF ROOF DRAINS AND | | SECONDARY ROOF DRAINS. THE PLANS DO NOT PROVIDE | | CALCULATIONS FOR RAINFALL/ HR NOR SIZE OF DRAINS OR | | STORM WATER. | | | | 25A) FBC-B P] 1503.4 ROOF DRAINAGE. UNLESS ROOFS ARE | | SLOPED TO DRAIN OVER ROOF EDGES, DESIGN AND | | INSTALLATION OF ROOF DRAINAGE SYSTEMS SHALL COMPLY WITH | | SECTION 1503 AND THE FLORIDA BUILDING CODE, PLUMBING, | | CHAPTER 11. | | | | 25B) FBC-B 1503.4.1 SECONDARY DRAINAGE REQUIRED. | | SECONDARY (EMERGENCY) ROOF DRAINS OR SCUPPERS SHALL BE | | PROVIDED WHERE THE ROOF PERIMETER CONSTRUCTION EXTENDS | | ABOVE THE ROOF IN SUCH A MANNER THAT WATER WILL BE | | ENTRAPPED IF THE PRIMARY DRAINS ALLOW BUILDUP FOR ANY | | REASON. THIS IS A COMPLETE SECONDARY SYSTEM. | | | | 26) SHEET A5.9 CANOPY, THIS DETAIL IS CONCEPTUAL, THERE | | IS NO DESIGN CRITERIA FOR HIS ELEMENT. IS THIS CANOPY | | TO BE PERMIT UNDER THIS PERMIT? FBC-B 3102.3 TYPE OF | | CONSTRUCTION. NONCOMBUSTIBLE MEMBRANE STRUCTURES SHALL | | BE CLASSIFIED AS TYPE IIB CONSTRUCTION. NONCOMBUSTIBLE | | FRAME OR CABLE-SUPPORTED STRUCTURES COVERED BY AN | | APPROVED MEMBRANE IN ACCORDANCE WITH SECTION 3102.3.1 | | SHALL BE CLASSIFIED AS TYPE IIB CONSTRUCTION. HEAVY | | TIMBER FRAME-SUPPORTED STRUCTURES COVERED BY AN | | APPROVED MEMBRANE IN ACCORDANCE WITH SECTION 3102.3.1 | | SHALL BE CLASSIFIED AS TYPE IV CONSTRUCTION. OTHER | | MEMBRANE STRUCTURES SHALL BE CLASSIFIED AS TYPE V | | CONSTRUCTION. | | | | FBC-B3102.3.1 MEMBRANE AND INTERIOR LINER MATERIAL. | | MEMBRANES AND INTERIOR LINERS SHALL BE EITHER | | NONCOMBUSTIBLE AS SET FORTH IN SECTION 703.4 OR MEET | | THE FIRE PROPAGATION PERFORMANCE CRITERIA OF NFPA 701 | | AND THE MANUFACTURER?S TEST PROTOCOL. | | | | 27) THIS SUBMISSION NO PRODUCT APPROVALS WERE | | SUBMITTED. 2010 FBC-B 1609.1.2 PROTECTION OF OPENINGS, | | 1609.6.4.41 COMPONENTS & CLADDING. | | FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS RULE 9N-3 NOV. | | 01/ 2010 (31) SUB-CATEGORY OF PRODUCTS OR CONSTRUCTION | | SYSTEMS THAT WILL REQUIRE PRODUCT APPROVALS: | | (31)(A) EXTERIOR DOORS. | | (B) WINDOWS | | (C) PANEL WALLS: STOREFRONTS, CURTAIN WALLS, WALL | | LOUVERS, EFIS SYSTEMS, | | (D) ROOFING PRODUCTS AND ASSEMBLIES | | (E) SHUTTERS | | (F) SKYLIGHTS | | 28) 2010 FBC 107.3.4.1 PRODUCT APPROVALS. THOSE | | PRODUCTS WHICH ARE REGULATED BY THE DCA RULE 9N-03 | | SHALL BE REVIEWED AND APPROVED IN WRITING BY THE | | DESIGNER OF RECORD PRIOR TO SUBMITTAL FOR | | JURISDICTIONAL APPROVAL. | | FL 61G1-23.015 (2) THE ARCHITECT IS RESPONSIBLE FOR | | SUPERVISING AND REVIEWING ALL PROJECT DATA, REPORTS, | | SHOP DRAWINGS ETC.. | | | | 29) IMPACT FEES | | BEFORE A PERMIT TO CONSTRUCT, MAY BE ISSUED, IMPACT | | FEES MUST BE PAID TO PALM BEACH COUNTY. THE ACTUAL | | PERMIT SET OF PLANS MUST BE STAMPED BY THAT OFFICE, AND | | A COPY OF THE PAID RECEIPT ATTACHED TO THE PERMIT | | APPLICATION. PLEASE CALL (561)233-5025 FOR MORE | | INFORMATION. | | | | 30) WHEN RESUBMITTING PLANS PLEASE INDICATE THE | | REVISION & REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES | | AS NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL | | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE | | REVISION MADE, IDENTIFYING THE SHEET OR SPECIFICATION | | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO | | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED | | COOPERATION. | | | | A THOROUGH REVIEW CANNOT BE MADE AT THIS TIME, AS A | | RESULT OF THE ADDITIONAL INFORMATION REQUESTED | | ADDITIONAL COMMENTS MAY APPEAR THAT WERE NOT PART OF | | THIS REVIEW. | | | | JAMES A. WITMER CBO | | SENIOR COMMERCIAL COMBINATION PLANS EXAMINER | | TEL: 561-805-6715 | | FAX: 561-805-6676 | | E-MAIL: [email protected] | | | | DEVELOPMENT SERVICES HOME PAGE | | HTTP://WWW.CITYOFWPB.COM/CONSTRUCTION/INDEX.PHP | | | | | | | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
6 |
Status |
P |
Date |
2017-04-27 |
|
|
Cont ID |
|
Sent By |
rlecky |
Date |
2017-04-27 |
Time |
14:16 |
Rev Time |
0.00 |
Received By |
rlecky |
Date |
2017-04-25 |
Time |
12:57 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
5 |
Status |
P |
Date |
2017-03-21 |
|
|
Cont ID |
|
Sent By |
rlecky |
Date |
2017-03-21 |
Time |
10:58 |
Rev Time |
0.00 |
Received By |
rlecky |
Date |
2017-03-21 |
Time |
10:29 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
4 |
Status |
P |
Date |
2017-02-07 |
|
|
Cont ID |
|
Sent By |
rlecky |
Date |
2017-02-07 |
Time |
14:18 |
Rev Time |
0.00 |
Received By |
rlecky |
Date |
2017-02-07 |
Time |
13:49 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
P |
Date |
2016-11-17 |
|
|
Cont ID |
|
Sent By |
rlecky |
Date |
2016-11-17 |
Time |
14:47 |
Rev Time |
0.00 |
Received By |
rlecky |
Date |
2016-11-17 |
Time |
10:33 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2015-11-02 |
|
|
Cont ID |
|
Sent By |
albarran |
Date |
2015-11-02 |
Time |
14:26 |
Rev Time |
0.00 |
Received By |
albarran |
Date |
2015-11-02 |
Time |
13:52 |
Sent To |
I |
|
Notes |
2015-11-02 14:27:43 | THESE PLANS WERE INITIALLY REVIEWED BY ROBERT LECKY AND | | ACCORDING TO THE SUBMITTED NARRATIVE ALL OF HIS NOTED | | COMMENT HAVE BEEN SATISFACTORILY ADDRESSED. | 2015-10-29 11:07:53 | 10/29/15 IN RESPONSE TO AN EMAIL FROM ADAM HODES I | | ATTEMPTED TO CHECK THE RESUBMITTAL BUT WAS UNABLE TO | | FIND A NARRATIVE. I ADVICED ADAM TO PROVIDE ONE AND LET | | ME KNOW. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2015-04-14 |
|
|
Cont ID |
|
Sent By |
rlecky |
Date |
2015-04-14 |
Time |
12:45 |
Rev Time |
0.00 |
Received By |
rlecky |
Date |
2015-04-14 |
Time |
10:12 |
Sent To |
|
|
Notes |
2015-04-14 12:47:31 | 15020937 | | 1901 S. FLAGLER DRIVE | | NEW BUILDING FOR PALM BEACH DAY ACADEMY | | | | | | PLEASE REVISE THE PLANS IN RESPONSE TO THE FOLLOWING | | REVIEW COMMENTS. | | | | SHEET E4.2 | | ORANGE COLOR CODING OF CONDUCTORS IS RESERVED FOR HIGH | | LEG DELTASYSTEMS ONLY. NEC 110.15 | | | | SHEET E4.2 | | ON THE ELECTRICAL PLAN PROVIDE A SAFETY LABELING | | SCHEDULE FOR FLASH PROTECTION FOR THE SERVICE, PANEL | | BOARDS AND MAIN DISCONNECTING MEANS. NEC 110.22 | | | | INDICATE THE LOCATION OF THE UTILITY TRANSFORMER AND | | ELECTRICAL SERVICE CONDUCTORS ON THE ELECTRICAL SITE | | PLAN. NEC 215.5 | | | | NOTE: SEPARATE PERMITS AND PLANS ARE REQUIRED FOR ALARM | | SYSTEMS, SECURITY, SITE LIGHTING AND DATA SYSTEMS. | | | | | | ROBERT LECKY, CBO | | ELECTRICAL PLANS REVIEW | | 561-373-3701 | | [email protected] | | | | |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
6 |
Status |
P |
Date |
2017-06-21 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2017-06-21 |
Time |
09:19 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2017-06-21 |
Time |
08:40 |
Sent To |
|
|
Notes |
2017-06-21 09:20:09 | CONTACT ENGINEERING DEPARTMENT AND COMPLY WITH ALL | | ENGINEERING DEPARTMENT REQUIREMENTS | | | | CIVIL PAGES ARE INCLUDED IN THIS SUBMITTAL FOR | | INFORMATION. NO ENGINEERING REVIEW OF THESE PAGES HAS | | BEEN DONE. | | | | | | |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
5 |
Status |
P |
Date |
2017-05-11 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2017-05-11 |
Time |
06:14 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2017-05-11 |
Time |
06:14 |
Sent To |
|
|
Notes |
2017-05-11 06:15:28 | PER M.GONZALEZ, NEW SHEETS DO NOT NEED TO BE REVIEWED | | BY ENGINEERING AND THE "PASS" STATUS FOR ENGINEERING | | REVIEW IS STILL APPLICABLE | | | | ENGINEERING PERMIT FOR THIS SITE SUSPERSEDES THE | | BUILDING DEPARTMENT SUBMITTAL | | | | |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
4 |
Status |
P |
Date |
2017-02-23 |
|
|
Cont ID |
|
Sent By |
mgonzale |
Date |
2017-02-23 |
Time |
|
Rev Time |
0.50 |
Received By |
mgonzale |
Date |
2017-02-23 |
Time |
|
Sent To |
I |
|
Notes |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
3 |
Status |
F |
Date |
2017-01-11 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2017-01-11 |
Time |
06:44 |
Rev Time |
0.50 |
Received By |
mgonzale |
Date |
2017-01-11 |
Time |
06:44 |
Sent To |
|
|
Notes |
2017-01-11 08:59:50 | ADDRESS PLANNING'S COMMENTS. THANK YOU! | 2017-01-11 06:45:33 | APPLICANT TO CONTACT ENGINEERING AND APPLY FOR | | ENGINEERING PERMIT | | | | |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
2 |
Status |
P |
Date |
2015-09-21 |
|
|
Cont ID |
|
Sent By |
KCranfor |
Date |
2015-09-21 |
Time |
13:40 |
Rev Time |
0.00 |
Received By |
cranford |
Date |
2015-09-18 |
Time |
15:19 |
Sent To |
|
|
Notes |
2015-09-21 13:40:08 | 1. LAND STABILIZATION AND EROSION CONTROL BONDS MUST BE | | POSTED PRIOR TO START OF DEMOLITION. CONTACT | | ENGINEERING DIVISION FOR REQUIRED BOND AMOUNTS. | | | | 2. EROSION CONTROL MEASURES SPECIFIED IN STORMWATER | | POLLUTION PREVENTION PLAN MUST BE IN PLACE PRIOR TO | | START OF DEMOLITION. STORMWATER POLLUTION PREVENTION | | PLAN MUST BE APPROVED BY THE ENGINEERING DIVISION PRIOR | | TO IMPLEMENTATION. | | | | ALSO SEE ENGINEERING DEVELOPMENT APPLICATION E15050006 | | FOR REVIEW OF SITE WORK (STORMWATER, POTABLE WATER, AND | | SANITARY). | | | | KELLY CRANFORD, P.E. | | LAND DEVELOPMENT ENGINEER | | PUBLIC WORKS DEPARTMENT | | CITY OF WEST PALM BEACH | | [email protected] | | 561-494-1098 (OFFICE) | | | | |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
F |
Date |
2015-03-16 |
|
|
Cont ID |
|
Sent By |
cranford |
Date |
2015-03-16 |
Time |
15:49 |
Rev Time |
0.00 |
Received By |
cranford |
Date |
2015-03-16 |
Time |
15:49 |
Sent To |
|
|
Notes |
2015-03-16 15:51:58 | PUBLIC WORKS / ENGINEERING | | | | CIVIL DRAWINGS WERE NOT INCLUDED IN THE SUBMITTAL. | | | | ENGINEERING DEVELOPMENT APPROVAL WILL ALSO BE REQUIRED. | | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS | | CAN BE DOWNLOADED AT | | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ | | | | KELLY CRANFORD, PE | | CITY LAND DEVELOPMENT ENGINEER | | [email protected] | | 561-494-1098 (OFFICE) | | |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
7 |
Status |
P |
Date |
2017-04-18 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2017-04-18 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2017-04-17 |
Time |
14:12 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
6 |
Status |
P |
Date |
2017-03-22 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2017-03-22 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2017-03-22 |
Time |
09:37 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
5 |
Status |
P |
Date |
2017-02-02 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2017-02-02 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2017-02-02 |
Time |
11:24 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
4 |
Status |
F |
Date |
2016-11-21 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2016-11-21 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2016-11-18 |
Time |
15:15 |
Sent To |
|
|
Notes |
2016-11-21 15:48:06 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | | | 1) SHEET LS 1.1 & OTHER A SHEETS - EXIT STAIR 1-003 | | INDICATES AN EXITING DOOR ON THE GROUND LEVEL. THERE IS | | AN SLIDING GLASS DOOR ASSEMBLY LOCATED WITHIN 10FT THAT | | IS NOT INDICATED A FIRE RATED. | | | | PER NFPA 101, CHAPTER 7 | | | | 7.2.2.5 ENCLOSURE AND PROTECTION OF STAIRS. | | 7.2.2.5.1 ENCLOSURES. | | 7.2.2.5.1.1 ALL INSIDE STAIRS SERVING AS AN EXIT OR | | EXIT COMPONENT SHALL BE ENCLOSED IN ACCORDANCE WITH | | 7.1.3.2. | | | | 7.2.2.5.2* EXPOSURES. | | 7.2.2.5.2.1 WHERE NONRATED WALLS OR UNPROTECTED | | OPENINGS ENCLOSE THE EXTERIOR OF A STAIRWAY, OTHER THAN | | AN EXISTING STAIRWAY, AND THE WALLS OR OPENINGS ARE | | EXPOSED BY OTHER PARTS OF THE BUILDING AT AN ANGLE OF | | LESS THAN 180 DEGREES, THE BUILDING ENCLOSURE WALLS | | WITHIN 10 FT (3050 MM) HORIZONTALLY OF THE NONRATED | | WALL OR UNPROTECTED OPENING SHALL BE CONSTRUCTED AS | | REQUIRED FOR STAIRWAY ENCLOSURES, INCLUDING OPENING | | PROTECTIVES. | | 7.2.2.5.2.2 CONSTRUCTION SHALL EXTEND VERTICALLY FROM | | THE FINISHED GROUND LEVEL TO A POINT 10 FT (3050 MM) | | ABOVE THE TOPMOST LANDING OF THE STAIRS OR TO THE | | ROOFLINE, WHICHEVER IS LOWER. | | 7.2.2.5.2.3 THE FIRE RESISTANCE RATING OF THE | | SEPARATION EXTENDING 10 FT (3050 MM) FROM THE STAIRS | | SHALL NOT BE REQUIRED TO EXCEED 1 HOUR WHERE OPENINGS | | HAVE A MINIMUM ?-HOUR FIRE PROTECTION RATING. | | | | PLEASE PROVIDE FOR THE REQUIRED RATING. | | | | | | 2) SHEET LS 1.2 & OTHER A SHEETS - THERE ARE WINDOWS | | INDICATEDAS "J" WITHIN THE EXIT ENCLOSURES 1-003 & | | 1-006. THOSE WINDOWS CAN NOT BE FOUND ON THE SCHEDULE | | AS HAVING ANY KIND OF FIRE RATING THAT IS EQUAL TO THE | | WALL RATING. | | | | PER NFPA 101, CHAPTER 7 | | | | 7.2.2.5 ENCLOSURE AND PROTECTION OF STAIRS. | | 7.2.2.5.1 ENCLOSURES. | | 7.2.2.5.1.1 ALL INSIDE STAIRS SERVING AS AN EXIT OR | | EXIT COMPONENT SHALL BE ENCLOSED IN ACCORDANCE WITH | | 7.1.3.2. | | | | 7.1.3.2 EXITS. | | 7.1.3.2.1 WHERE THIS CODE REQUIRES AN EXIT TO BE | | SEPARATED FROM OTHER PARTS OF THE BUILDING, THE | | SEPARATING CONSTRUCTION SHALL MEET THE REQUIREMENTS OF | | SECTION 8.2 AND THE FOLLOWING: | | (1)* THE SEPARATION SHALL HAVE A MINIMUM 1-HOUR FIRE | | RESISTANCE RATING WHERE THE EXIT CONNECTS THREE OR | | FEWER STORIES. | | | | (9)* OPENINGS IN EXIT ENCLOSURES SHALL BE LIMITED TO | | DOOR ASSEMBLIES FROM NORMALLY OCCUPIED SPACES AND | | CORRIDORS AND DOOR ASSEMBLIES FOR EGRESS FROM THE | | ENCLOSURE, UNLESS ONE OF THE FOLLOWING CONDITIONS | | EXISTS: | | | | (10) PENETRATIONS INTO, AND OPENINGS THROUGH, AN EXIT | | ENCLOSURE | | ASSEMBLY SHALL BE LIMITED TO THE FOLLOWING: | | | | A WINDOW IS NOT LISTED UNDER ANY OF THE 9 ITEMS. | | | | THE WINDOW OPENING SHALL BE RATED OR REMOVED AS IT IS | | NOT ESSTENITIAL FOR THE FUNCTION OF THE STAIR. | | | | | | | | 3) LS 1.1 - THE WALLS SURROUNDING THE STORAGE ROOM | | 1-111 ARE NOT INDICATED AS BEING FIRE RATED EQUAL TO | | THE STAIR ENCLOSURE. | | | | 7.2.2.5.3* USABLE SPACE. ENCLOSED, USABLE SPACES WITHIN | | EXIT ENCLOSURES SHALL BE PROHIBITED, INCLUDING UNDER | | STAIRS, UNLESS OTHERWISE PERMITTED BY 7.2.2.5.3.2. | | 7.2.2.5.3.2 ENCLOSED, USABLE SPACE SHALL BE PERMITTED | | UNDER STAIRS, PROVIDED THAT BOTH ALL OF THE FOLLOWING | | CRITERIA ARE MET: | | (1) THE SPACE SHALL BE SEPARATED FROM THE STAIR | | ENCLOSURE BY THE SAME FIRE RESISTANCE AS THE EXIT | | ENCLOSURE. | | (2) ENTRANCE TO THE ENCLOSED, USABLE SPACE SHALL NOT BE | | FROM WITHIN THE STAIR ENCLOSURE. (SEE ALSO 7.1.3.2.3.) | | (3) THE SPACE IS NOT USED FOR THE STORAGE OF FLAMMABLE, | | OR OTHERWISE HAZARDOUS MATERIALS. | | | | PLEASE PROVIDE DETAIL FOR THIS REQUIREMENT | | | | | | | | 4) SHEET A 19.1 & A 14.1 - THE SHEETS WERE PLACED | | UPSIDE DOWN. | | | | PLEASE CORRECT TO PROPER PLACEMENT. | | | | | | | | 5) SHEET A 14.1 - THE DOOR SCHEDULE APPEARS TO ONLY | | INDICATED DOORS ON THE 2ND LEVEL, THERE APPEARS TO BE | | NO DOOR SCHEDULE FOR THE 1ST FLOOR. | | | | PLEASE REVIEW AND ENSURE THE IS A DOOR SCHEDULE FOR THE | | 1ST FLOOR AND ALL DOORS ARE ACCOUNTED FOR. | | | | | | | | 6) SHEET A 14.1 - DOORS , BUT NOT LIMITED TO, 203, 008, | | 200, 206A, 206(STAFF LOUNGE) 003, ALL APPEAR TO BE | | MISSING FROM THE SCHEDULE. | | | | PLEASE REVIEW ALL DOORS AND ENSURE THEY ARE CONTAINED | | WITHIN THE DOR SCHEDULE. | | | | | | | | | | 7) LS 1.2 - THERE ARE MULTIPLE CANOPY'S THAT COVER THE | | EXIT EGRESS TO A PUBLIC WAY. THESE CANOPY'S ARE | | INDICATED WITH ANY FIRE PROTECTION RATING OR FIRE | | SPRINKLER PROTECTION. | | | | PER NFPA 101 EXIT DISCHARGE SHALL BE PROVIDED TO A | | PUBLIC WAY. | | | | 3.3.83 EXIT DISCHARGE. THAT PORTION OF A MEANS OF | | EGRESS BETWEEN THE TERMINATION OF AN EXIT AND A PUBLIC | | WAY. | | | | 7.1.9 IMPEDIMENTS TO EGRESS. ANY DEVICE OR ALARM | | INSTALLED TO RESTRICT THE IMPROPER USE OF A MEANS OF | | EGRESS SHALL BE DESIGNED AND INSTALLED SO THAT IT | | CANNOT, EVEN IN CASE OF FAILURE, IMPEDE OR PREVENT | | EMERGENCY USE OF SUCH MEANS OF EGRESS, UNLESS OTHERWISE | | PROVIDED IN 7.2.1.6 AND CHAPTERS 18, 19, 22, AND 23. | | | | 7.1.10 MEANS OF EGRESS RELIABILITY. | | 7.1.10.1* GENERAL. MEANS OF EGRESS SHALL BE | | CONTINUOUSLY MAINTAINED FREE OF ALL OBSTRUCTIONS OR | | IMPEDIMENTS TO FULL INSTANT USE IN THE CASE OF FIRE OR | | OTHER EMERGENCY. | | | | 7.2.3.5 DISCHARGE. | | 7.2.3.5.1 EVERY SMOKEPROOF ENCLOSURE SHALL DISCHARGE | | INTO A PUBLIC WAY, INTO A YARD OR COURT HAVING DIRECT | | ACCESS TO A PUBLIC WAY, OR INTO AN EXIT PASSAGEWAY. | | SUCH EXIT PASSAGEWAYS SHALL BE WITHOUT OPENINGS, OTHER | | THAN THE ENTRANCE TO THE SMOKEPROOF ENCLOSURE AND THE | | DOOR OPENING TO THE OUTSIDE YARD, COURT, OR PUBLIC WAY. | | THE EXIT PASSAGEWAY SHALL BE SEPARATED FROM THE | | REMAINDER OF THE BUILDING BY A 2-HOUR FIRE RESISTANCE | | RATING. | | | | PROTECTION SHALL BE PROVIDED UNTIL A PERSON HAS ACCESS | | TO A PUBLIC WAY. THE CANOPY STRUCTURE CAN BE AFFECTED | | BY THE PRODUCTS OF COMBUSTION WHICH COULD LEAD TO | | FAILURE AND TRAP EXTING PERSONS. | | | | PLEASE PROVIDE FOR THE REQUIRED PROTECTION LEADING TO A | | PUBLIC WAY. | | | | | | | | 8) SHEET S 6.1 - THERE APPEARS TO BE LIGHT WEIGHT TRUSS | | CONSTRUCTION OF BOTH THE FLOOR AND ROOF OF THE PROPOSED | | BUILDING. | | | | PLEASE PROVIDE FOR THE APPLICABLE FLOOR & TRUSS SIGN | | REQUIRED BY FLORIDA STATUTUE. | | | | PER FLORIDA 69A-60.0081; NOTICE SIGNAGE IS REQUIRED FOR | | STRUCTURES WITH LIGHT-FRAME TRUSS-TYPE CONSTRUCTION. | | ANY COMMERCIAL, INDUSTRIAL, OR ANY MULTIUNIT | | RESIDENTIAL STRUCTURE OF THREE UNITS OR MORE WHICH USES | | HORIZONTAL OR VERTICAL LIGHT-FRAME TRUSS-TYPE | | CONSTRUCTION IN ANY PORTION SHALL BE MARKED WITH A | | MALTESE CROSS SIGN MEASURING 8 INCHES HORIZONTALLY AND | | 8 INCHES VERTICALLY, OF A BRIGHT RED REFLECTIVE COLOR. | | THE APPROVED SYMBOL SHALL BE PLACED WITHIN 24 INCHES TO | | THE LEFT OF THE MAIN ENTRY DOOR. | | 1. STRUCTURES WITH LIGHT-FRAME TRUSS ROOFS SHALL BE | | MARKED WITH THE LETTER "R". | | 2. STRUCTURES WITH LIGHT-FRAME TRUSS FLOOR SYSTEMS | | SHALL BE MARKED WITH THE LETTER "F". | | 3. STRUCTURES WITH LIGHT-FRAME TRUSS FLOOR AND ROOF | | SYSTEMS SHALL BE MARKED WITH THE LETTERS "R/F". | | | | | | | | 9) SHEETS LS 1.1 & LS 1.2 - A KITCHEN IS INDICATED | | WITHIN THE NOTES OF THE LIFE SAFETY PLAN. | | | | PER NFPA 101, CHAPTER 14, NEW EDUCATIONAL OCCUPANCIES | | | | 14.3.2.2 COOKING FACILITIES SHALL BE PROTECTED IN | | ACCORDANCE WITH 9.2.3. OPENINGS SHALL NOT BE REQUIRED | | TO BE PROTECTED BETWEEN FOOD PREPARATION AREAS AND | | DINING AREAS. | | | | 9.2.3 COMMERCIAL COOKING EQUIPMENT. COMMERCIAL COOKING | | EQUIPMENT SHALL BE IN ACCORDANCE WITH NFPA 96, STANDARD | | FOR VENTILATION CONTROL AND FIRE PROTECTION OF | | COMMERCIAL COOKING OPERATIONS, UNLESS SUCH | | INSTALLATIONS ARE APPROVED EXISTING INSTALLATIONS, | | WHICH SHALL BE PERMITTED TO BE CONTINUED IN SERVICE. | | | | PLEASE PROVIDE DETAILS AND THE LOCATION OF THE TYPE OF | | KITCHEN BEING PROPOSED. | | | | | | | | 10) SHEETS LS 1.1 & 1.2 - SCIENCE LAB IS INDICATED | | WITHIN THE NOTES OF THE LIFE SAFETY PLAN. | | | | 14.3.2.5 EDUCATIONAL OCCUPANCY LABORATORIES USING | | CHEMICALS SHALL BE IN ACCORDANCE WITH 8.7.4. | | | | 8.7.4 LABORATORIES. | | 8.7.4.1 LABORATORIES THAT USE CHEMICALS SHALL COMPLY | | WITH NFPA 45, STANDARD ON FIRE PROTECTION FOR | | LABORATORIES USING CHEMICALS, UNLESS OTHERWISE MODIFIED | | BY OTHER PROVISIONS OF THIS CODE. | | | | PLEASE PROVIDE DETAILS AND THE LOCATION OF THE SCIENCE | | LAB BEING PROPOSED. | | | | | | | | 11) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET | | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE | | ABOVE. | | | | | | | | 12) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE | | RE-SUBMITTAL OF THE ABOVE. | | | | | | | | PETER LEDUC | | FIRE MARSHAL | | 561-804-4709 | | [email protected] | | | | | | | | |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
3 |
Status |
P |
Date |
2015-12-21 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2015-12-21 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2015-12-21 |
Time |
15:11 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
P |
Date |
2015-09-07 |
|
|
Cont ID |
|
Sent By |
PLeduc |
Date |
2015-09-07 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2015-09-04 |
Time |
13:28 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
F |
Date |
2015-03-09 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2015-03-09 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2015-03-05 |
Time |
14:44 |
Sent To |
|
|
Notes |
2015-03-06 16:55:11 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | 1) SHEET LS 1.1 DOOR 1-004; DOOR 1-191; SHEET LS 1.2 | | DOOR1-209; EXIT DOOR LEAF ENCROACHMENT. | | NFPA 101 CHAPTER 7, MEANS OF EGRESS | | 7.2.1.4.3 DOOR LEAF ENCROACHMENT | | 7.2.1.4.3.1 DURING ITS SWING, ANY DOOR LEAF IN A MEANS | | OF EGRESS SHALL LEAVE NOT LESS THAN ONE-HALF OF THE | | REQUIRED WIDTH OF AN AISLE, A CORRIDOR, A PASSAGEWAY, | | OR A | | LANDING UNOBSTRUCTED AND SHALL NOT PROJECT NOT MORE | | THAN 7 IN. INTO THE REQUIRED WIDTH OF AN AISLE, A | | CORRIDOR, A PASSAGE WAY, OR A LANDING, WHEN FULLY OPEN, | | UNLESS BOTH OF THE FOLLOWING CONDITIONS ARE MET: | | (1) THE DOOR OPENING PROVIDES ACCESS TO A STAIR IN AN | | EXISTING BUILDING. | | (2) THE DOOR OPENING MEETS THE REQUIREMENTS THAT LIMITS | | PROJECTION TO NOT MORE THAN 7 IN. INTO THE REQUIRED | | WIDTH OF THE STAIR LANDING WHEN THE DOOR | | LEAF IS FULLY OPEN. | | 2) SHEET LS 1.1 THE WALLS OF ROOMS 1-112, 1-190 AND | | 1-290 ARE REQUIRED TO BE 1 HOUR FIRE RATED. | | | | 3) SHEET LS1.1 & 1.2 STAIRWELL 1-003 ENCLOSURE AND | | PROTECTION OF STAIRS. THE UNPROTECTED WINDOW OPENINGS | | OF THIS STAIRWELL AND/OR ASSOCIATED EXTERIOR WALLS | | WITHIN 10 FT SHALL BE PROTECTED WITH AN 1 HOUR FIRE | | RATING. | | 7.2.2.5.2 EXPOSURES. | | 7.2.2.5.2.1 WHERE NONRATED WALLS OR UNPROTECTED | | OPENEINGS ENCLOSE THE EXTERIOR OF A STAIRWAY, OTHER | | THAN AN EXISTING STAIRWAY, AND THE WALLS OR OPENINGS | | ARE EXPOSED BY | | OTHER PARTS OF THE BUILDING AS AN ANGLE OF LESS THAN | | 180 DEGREES, THE BUILDING ENCLOSURE WALLS WITHIN 10 FT | | HORIZONTALLY OF THE NONRATED WALL OR UNPROTECTED | | OPENING SHALL BE | | CONSTRUCTED AS REQUIRED FOR STAIRWAY ENCLUSRES, | | INCLUDING OPENING PROTECTIVES. | | | | 4) A DOOR SCHEDULE INDICATING ALL DOOR FIRE RATINGS, | | HARDWARE, FINISH, AND/OR LOCKING DEVICES IS NOT | | ATTACHED TO THIS SUBMITTED PLAN OR IS NOT READILY | | IDENTIFIABLE. THE FIRE RATING OF DOORS CAN NOT BE | | REVIEWED, CONFIRMED OR APPROVED. | | | | 5) THE CURVED STAIR SHALL BE PROTECTED WITH THE | | REQUIREMENTS OF NFPA 101 8.6 AND NFPA 13, 8.15 SPECIAL | | SITUATIONS INCLUDING, BUT NOT LIMITED TO, SPRINKLER | | PROTECTION UNDER THE STAIRS. | | | | 6) SHEET FS 2.1 & 2.2 , FIRE SPRINKLER PROTECTION WAS | | NOT INDICATED IN THE COMMON HALLWAYS, WITHIN THE | | STAIRWELLS AND THE OPEN ATIURM. A COMPLETE FIRE | | SPRINKLER IS REQUIRED IN THIS OCCUPANCY. | | | | 7) AN EXIT SIGN IS REQUIRED AT THE BOTTOM OF THE CURVED | | STAIR AT DOOR 1-005 LEADING TO THE EXIT CORRIDOR. | | | | 8) SOME OF THE CURRENT FIRE CODE LISTINGS INDICATED | | WITHIN THE SUBMITTED PLAN ARE INCORRECT AND NEED TO BE | | UPDATED WHERE APPLICABLE. THE PROPOSED PROJECT SHALL | | MEET THE REQUIREMENTS OF THE 5TH EDITION OF FLORIDA | | FIRE PREVENTION CODE INCLUDING THE 2012 EDITION OF NFPA | | 1 AND NFPA 101 AND ALL OTHER APPLICABLE CODES OR | | STANDARDS. | | FIRE SPRINKLER WORK SHALL COMPLY WITH THE REQUIREMENTS | | OF NFPA 13, 2010 EDITION. | | FIRE ALARM WORK SHALL COMPLY WITH THE REQUIREMENTS OF | | NFPA 72, 2010 EDITION. | | CONSTRUCTION WORK SHALL COMPLY WITH THE REQUIREMENTS OF | | NFPA 241, 2009 EDITION. | | FIRE EXTINGUISHERS SHALL COMPLY WITH THE REQUIREMENTS | | OF NFPA 10, 2010 EDITION. | | ELECTRIC WORK SHALL COMPLY WITH NFPA 70, 2011 EDITION. | | | | 9) ADDITIONAL COMMENTS MAY BE APPLIED IN THE FUTURE | | BASED ON THE RESUBMITTAL OF THE ABOVE. | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
7 |
Status |
N |
Date |
2017-06-21 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2017-06-21 |
Time |
09:45 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2017-06-19 |
Time |
13:42 |
Sent To |
|
|
Notes |
2017-06-20 13:42:31 | IMPACT FEES ROUTED TO SHILL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
6 |
Status |
N |
Date |
2017-06-13 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2017-06-13 |
Time |
14:46 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2017-06-01 |
Time |
08:31 |
Sent To |
|
|
Notes |
2017-06-02 08:32:09 | C35 & C36 |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
5 |
Status |
N |
Date |
2017-05-24 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2017-05-18 |
Time |
10:21 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2017-01-31 |
Time |
09:27 |
Sent To |
|
|
Notes |
2017-05-24 10:23:03 | 5/24 CLOSED I STOP | | REVIEW CYCLE #5 WAS NOT CLOSED OUT; REVIEW CYCLE 6 DONE | | WITHOUT A NEW I STOP. THE RESULT WAS THAT THE SUBMITTAL | | DATE FOR REVIEW CYCLE #5 (1/31/2017) WAS USED FOR | | REVIEW CYCLE #6 TO ATTEMPT TO EXPEDITE THE PLAN REVIEW. | | | | | 2017-02-01 09:28:09 | C35 & 36 |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2017-01-11 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2017-01-11 |
Time |
06:45 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2016-11-14 |
Time |
15:03 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2016-01-25 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2016-01-25 |
Time |
12:22 |
Rev Time |
0.00 |
Received By |
eschneid |
Date |
2015-12-18 |
Time |
14:55 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2015-11-02 |
|
|
Cont ID |
|
Sent By |
albarran |
Date |
2015-11-02 |
Time |
14:28 |
Rev Time |
0.00 |
Received By |
albarran |
Date |
2015-09-03 |
Time |
16:45 |
Sent To |
|
|
Notes |
2015-11-02 14:43:33 | 11/2/15 ALL PREVIOUSLY ADDRESSED COMMENTS HAVE BEEN | | SATISFACTORILY CORRECTED. PASSED ELECTRICAL REVIEW. | | CONTRACTOR NOTIFIED VIA EMAIL. PLANS ARE SO LARGE THAT | | I LEFT THEM IN BIN "C3". MA | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2015-04-21 |
|
|
Cont ID |
|
Sent By |
hmoser |
Date |
2015-04-21 |
Time |
10:26 |
Rev Time |
0.00 |
Received By |
hmoser |
Date |
2015-02-27 |
Time |
09:17 |
Sent To |
|
|
Notes |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
7 |
Status |
P |
Date |
2017-06-21 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2017-06-21 |
Time |
09:27 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2017-06-21 |
Time |
08:40 |
Sent To |
|
|
Notes |
2017-06-21 09:28:30 | MU-2017-016677-0000 | | $20,153.56 | | PLANS STAMPED (FILE SET) | | | | | | |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
6 |
Status |
F |
Date |
2017-06-13 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2017-06-13 |
Time |
14:45 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2017-06-13 |
Time |
14:45 |
Sent To |
|
|
Notes |
2017-06-13 14:45:53 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | IMPACT FEE ASSESSMENT BY PALM BEACH COUNTY REQUIRED. | | |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
5 |
Status |
F |
Date |
2017-03-22 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2017-03-22 |
Time |
18:28 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2017-03-22 |
Time |
18:28 |
Sent To |
|
|
Notes |
2017-03-22 18:28:32 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | IMPACT FEE ASSESSMENT BY PALM BEACH COUNTY REQUIRED. | | | | PLEASE SEE BUILDING PROVISO REGARDING SQUARE FOOT AREA | | DISCREPANCY. IF IMPACT FEES ARE NOT PAID ON THE LARGER | | AREA (23,576), AN EXPLANATION OF THE DISCREPANCY IS | | REQUIRED PRIOR TO PERMIT ISSUANCE. | | | | |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
4 |
Status |
F |
Date |
2016-12-03 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2016-12-03 |
Time |
11:49 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2016-12-03 |
Time |
11:49 |
Sent To |
|
|
Notes |
2016-12-03 11:49:34 | | | IMPACT FEES | | BEFORE A PERMIT TO CONSTRUCT, MAY BE ISSUED, IMPACT | | FEES MUST BE PAID TO PALM BEACH COUNTY. THE ACTUAL | | PERMIT SET OF PLANS MUST BE STAMPED BY THAT OFFICE, AND | | A COPY OF THE PAID RECEIPT ATTACHED TO THE PERMIT | | APPLICATION. PLEASE CALL (561)233-5025 FOR MORE | | INFORMATION. | | |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
3 |
Status |
F |
Date |
2016-01-21 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2016-01-21 |
Time |
09:01 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2016-01-21 |
Time |
09:01 |
Sent To |
|
|
Notes |
2016-01-21 09:03:16 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | IMPACT FEE ASSESSMENT BY PALM BEACH COUNTY REQUIRED. | | | | PLEASE SEE BUILDING PROVISO REGARDING SQUARE FOOT AREA | | DISCREPANCY. IF IMPACT FEES ARE NOT PAID ON THE LARGER | | AREA (23,576), AN EXPLANATION OF THE DISCREPANCY IS | | REQUIRED PRIOR TO PERMIT ISSUANCE. | | | | |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
2 |
Status |
F |
Date |
2015-10-05 |
|
|
Cont ID |
|
Sent By |
jwitmer |
Date |
2015-10-05 |
Time |
16:04 |
Rev Time |
0.00 |
Received By |
jwitmer |
Date |
2015-10-05 |
Time |
16:04 |
Sent To |
|
|
Notes |
2015-10-05 16:04:36 | | | IMPACT FEES | | BEFORE A PERMIT TO CONSTRUCT, MAY BE ISSUED, IMPACT | | FEES MUST BE PAID TO PALM BEACH COUNTY. THE ACTUAL | | PERMIT SET OF PLANS MUST BE STAMPED BY THAT OFFICE, AND | | A COPY OF THE PAID RECEIPT ATTACHED TO THE PERMIT | | APPLICATION. PLEASE CALL (561)233-5025 FOR MORE | | INFORMATION. | | JAMES A. WITMER CBO | | SENIOR COMMERCIAL COMBINATION PLANS EXAMINER | | TEL: 561-805-6715 | | FAX: 561-805-6676 | | E-MAIL: [email protected] | | | | |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
1 |
Status |
F |
Date |
2015-03-26 |
|
|
Cont ID |
|
Sent By |
jwitmer |
Date |
2015-03-26 |
Time |
13:29 |
Rev Time |
|
Received By |
jwitmer |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2015-03-26 13:29:32 | IMPACT FEES | | BEFORE A PERMIT TO CONSTRUCT, MAY BE ISSUED, IMPACT | | FEES MUST BE PAID TO PALM BEACH COUNTY. THE ACTUAL | | PERMIT SET OF PLANS MUST BE STAMPED BY THAT OFFICE, AND | | A COPY OF THE PAID RECEIPT ATTACHED TO THE PERMIT | | APPLICATION. PLEASE CALL (561)233-5025 FOR MORE | | INFORMATION | | |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
6 |
Status |
P |
Date |
2017-05-18 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2017-05-18 |
Time |
08:45 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2017-05-18 |
Time |
07:07 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
5 |
Status |
P |
Date |
2017-02-17 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2017-02-17 |
Time |
15:01 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2017-02-17 |
Time |
14:27 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
4 |
Status |
F |
Date |
2016-12-15 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2016-12-15 |
Time |
09:43 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2016-12-15 |
Time |
07:09 |
Sent To |
|
|
Notes |
2016-12-15 11:44:45 | 1ST REVIEW FBC-2014 MECHANICAL | | PERMIT #15020937 | | 12/15/16 | | | | 1) PLEASE CLARIFY OR CORRECT THE FOLLOWING CONFLICTS | | CONCERNING THE HEATING CAPACITIES FOR THE AHU'S: | | | | A) THE ENERGYGAUGE COMPLIANCE DATA FORM INDICATES | | 136520 BTUH ELECTRIC FURNACE CAPACITIES FOR AHU 1-1 AND | | 1-2 , HOWEVER NO ELECTRIC DATA IS LISTED IN THE | | SCHEDULES FOR THE UNITS ON M4.2, AND DUCT HEATERS AT 40 | | KW EACH ARE SPECIFIED FOR BOTH SYSTEMS. | | | | B) THE AC LOAD CALCULATIONS INDICATE 87,461 BTUH | | (25.6KW) HEATING REQUIRED FOR AHU 1-1, AND 24,624 BTUH | | (7.2KW) FOR AHU 1-2 WHICH INDICATES THE DUCT HEATERS | | HAVE BEEN OVERSIZED. | | | | C) THE HEATING CAPACITIES FOR AHU'S 1-4 & 2-1 ARE | | OVERSIZED BASED ON THE CALCULATED LOADS. | | | | 2) PROVIDE COMPLIANCE DATA FOR THE CHILLER IN THE | | ENERGYGAUGE SUBMITTAL- SEE TABLE C403.2.3(7) FBC-14 | | ENERGY CONSERVATION. | | | | 3) M5.2: PROVIDE THE WIND LOAD DESIGN CRITERIA FOR | | ATTACHMENT OF THE CHILLER- SEE SECTION 301.15. | | | | 4) PROVIDE WIND LOAD ENGINEERING AND DESIGN CRITERIA | | FOR ATTACHMENT OF THE ROOFTOP FGI GRAVITY INTAKE HOOD. | | | | 5) SHOW THE REQUIRED CLEARANCES FOR THE GRAVITY INTAKE | | ON THE ROOF PER SECTION 401.4, AND INDICATE HOW THE | | OPENING WILL BE PROTECTED PER SECTION 401.5. | | | | 6) INDICATE THE REQUIRED CLEARANCE DISTANCE | | MEASUREMENTS FOR THE EXHAUST OUTLETS PER SECTION | | 501.3.1 AND SUBMIT A FL. PRODUCT APPROVAL OR MIAMI-DADE | | NOA FOR THE LOUVER- RULE 9N-3 DEPT. OF COMMUNITY | | AFFAIRS. | | | | 7) PROVIDE SUBMITTALS FOR THE FIRE DAMPERS AND O/A | | MOTORIZED DAMPERS, AND PROVIDE INSTALLATION DETAILS ON | | THE PLANS. | | | | CHRISTOPHER L. COLE | | MECHANICAL PLANS EXAMINER | | 561-805-6719 | | [email protected] | | |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
3 |
Status |
P |
Date |
2015-12-22 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2015-12-22 |
Time |
11:17 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2015-12-22 |
Time |
11:17 |
Sent To |
|
|
Notes |
2015-12-22 11:21:03 | MECHANICAL PROVISO: | | | | 1) PRIOR TO1ST INSPECTION, THE CONTRACTOR MUST SUBMIT | | FL. PRODUCT APPROVALS AND/OR MIAMI-DADE NOA'S FOR THE | | ROOF STANDS AND THE LOUVERS. | | | | CHRISTOPHER L. COLE | | MECHANICAL PLANS EXAMINER | | 561-805-6719 | | [email protected] | | | | | | | | |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
F |
Date |
2015-09-09 |
|
|
Cont ID |
|
Sent By |
HMoser |
Date |
2015-09-09 |
Time |
14:42 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2015-09-09 |
Time |
14:42 |
Sent To |
|
|
Notes |
2015-09-09 15:45:42 | 2ND REVIEW: FBC 2010 MECHANICAL | | PERMIT #15020937 | | 9/9/2015 | | | | 1) PROVIDE AC COOLING AND HEATING LOAD CALCULATIONS FOR | | THE CHILLER, AHU'S, FCU'S, & AHU/CU 1 & 2. REFER TO | | SECTION 503.2.1 FBC-10 ENERGY CONSERVATION: CALCULATION | | OF HEATING AND COOLING LOADS. | | DESIGN LOADS SHALL BE DETERMINED IN ACCORDANCE WITH THE | | PROCEDURES DESCRIBED IN THE ASHRAE/ACCA STANDARD 183 OR | | ACCA MANUAL N AND SHALL BE ATTACHED TO THE CODE | | COMPLIANCE FORM SUBMITTED TO THE BUILDING DEPARTMENT | | WHEN THE BUILDING IS PERMITTED OR, IN THE EVENT THE | | MECHANICAL PERMIT IS OBTAINED AT A LATER TIME, THE | | SIZING CALCULATION SHALL BE SUBMITTED WITH THE | | APPLICATION FOR THE MECHANICAL PERMIT. HEATING AND | | COOLING LOADS SHALL BE ADJUSTED TO ACCOUNT FOR LOAD | | REDUCTIONS THAT ARE ACHIEVED WHEN ENERGY RECOVERY | | SYSTEMS ARE UTILIZED IN THE HVAC SYSTEM IN ACCORDANCE | | WITH THE ASHRAE HVAC SYSTEMS AND EQUIPMENT HANDBOOK. | | ALTERNATIVELY, DESIGN LOADS SHALL BE DETERMINED BY AN | | APPROVED EQUIVALENT COMPUTATION PROCEDURE, USING THE | | DESIGN PARAMETERS SPECIFIED IN CHAPTER 3. | | 2) PROVIDE ENERGY CALCULATIONS IN COMPLIANCE WITH | | SECTION 501.2 FBC-10 ENERGY CONSERVATION. SUBMIT TWO | | COPIES OF FORM 502 FOR PRESCRIPTIVE COMPLIANCE, OR FORM | | 506 FOR PERFORMANCE BASED COMPLIANCE USING COMMISION | | APPROVED SOFTWARE PRINTOUT. | | 4) SHEET M0.1: APPLICABLE BUILDING CODES SHALL ALSO | | INCLUDE THE FBC-10 ENERGY CONSERVATION CODE. PLEASE | | REVIEW AND REVISE. | | 5) SHEET M0.1: THE VENTILATION CALCULATION TABLE IS NOT | | INDICATING ANY O/A CFM'S FOR THE CORRIDOR. PER TABLE | | 403.3, VENTILATION SHALL BE PROVIDED AT .06 CFM'S PER | | SQ. FT. PLEASE REVISE THE TABLE ACCORDINGLY. | | 6) M2.1: DAMPERS MISSING AT THESE LOCATIONS- A) 18"X14" | | DUCT PENETRATING RATED WALL BETWEEN CORRIDOR 1-002 AND | | ROOM 1-111. B) 8" ROUND DUCT PENETRATING RATED WALL | | BETWEEN CORRIDOR 1-002 AND ROOM 1-111A. C) 12"X12" DUCT | | PENETRATING RATED WALL BETWEEN CORRIDOR 1-009 & ROOM | | 1-201. | | 7) M2.2: DAMPERS MISSING AT THESE LOCATIONS- A) 14"X14" | | DUCT PENETRATING THE RATED WALL BETWEEN CORRIDOR 1-006 | | AND ROOM 1-202. B) 8" ROUND DUCT PENETRATING THE RATED | | WALL BETWEEN ROOM 1-202 AND CORRIDOR 1-009. | | 8) M2.1 & M2.2: PLEASE CLARIFY WHY ALL OF THE AC DUCTS | | PENETRATING THE SMOKE PARTITIONS ON THE PLANS HAVE | | SMOKE DAMPERS BUT NONE OF THE EXHAUST DUCTS PENETRATING | | THOSE WALLS HAVE DAMPERS. | | 9) M2.3: THE CHILLER DETAIL IS REFERENCING THE | | STRUCTURAL PLANS FOR ANCHORING THE UNIT, HOWEVER THE | | DETAIL ON SHEET S-4.3 DOES NOT INDICATE HOW THE CHILLER | | IS TO BE TIED DOWN TO THE CURB. PLEASE REVISE THE | | DETAIL. | | 10) M2.3: PROVIDE WINDLOAD TIE DOWN ENGINEERING FOR | | ANCHORING THE DUCT STANDS- SECTION 301.12 FBC-10 | | MECHANICAL. | | 11) M6.1: PROVIDE A NARRATIVE TO CLARIFY HOW THE | | DIGITAL CONTROL SYSTEM WILL FUNCTION WITH THE HVAC | | SYSTEM- REFER TO SECTION 503.2.4 FBC-10 ENERGY | | CONSERVATION. | | | | CHRISTOPHER L. COLE | | MECHANICAL PLANS EXAMINER | | 561-805-6719 | | [email protected] | | | | |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2015-04-21 |
|
|
Cont ID |
|
Sent By |
hmoser |
Date |
2015-04-21 |
Time |
10:25 |
Rev Time |
0.00 |
Received By |
hmoser |
Date |
2015-04-20 |
Time |
14:51 |
Sent To |
|
|
Notes |
2015-04-21 10:25:45 | PLAN DENIED | | 1) REFER TO SECTION 1022.4 PENETRATIONS 2010 FBC | | ( MINI SPLITS IN STAIRWELL ) | | 2) PROVIDE A DETAIL SHOWING THE CONDENSER STAND | | TIEDOWN TO ROOF AND CONDENSER TIE DOWN TO STAND | | PER SECTION 301.12 WIND RESISTANCE 2010 FBC (M) | | | | PLAN REVIEW BY HAROLD MOSER | | [email protected] | | OFFICE 561-805-6732 | | FAX 561-805-6676 | | | | |
|
|
Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
Rev No |
2 |
Status |
P |
Date |
2016-12-03 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2016-12-03 |
Time |
11:49 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2016-12-03 |
Time |
11:49 |
Sent To |
|
|
Notes |
2016-12-03 11:51:05 | DFE PER PLAN = 8.96' NGVD29 | | | | BUILDING UNDER CONSTRUCTION ELEVATION CERTIFICATE OR | | FORM BOARD SURVEY SHOWING PROPOSED ELEVATIONS IS | | REQUIRED PRIOR TO CONCRETE POUR | | FINISHED CONSTRUCTION ELEVATION CERTIFICATE IS REQUIRED | | PRIOR TO FINAL INSPECTION. | | | | PROPOSED STRUCTURE IS LOCATED IN SFHA A5. THE FIRST | | FLOOR PROPOSED FFE IS 8.46 | | | | ELEVATION CERTIFICATE / FORM BOARD SURVEY REQUIRED | | PRIOR TO CONCRETE POUR | | FINISHED CONSTRUCTION ELEVATION CERTIFICATE REQUIRED | | PRIOR TO FINAL INSPECTION | | | | | | |
|
|
Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
Rev No |
1 |
Status |
P |
Date |
2016-01-20 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2016-01-20 |
Time |
16:17 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2016-01-20 |
Time |
16:17 |
Sent To |
|
|
Notes |
2016-01-20 16:20:29 | PROPOSED STRUCTURE IS LOCATED IN SFHA A5. THE FIRST | | FLOOR PROPOSED FFE IS 8.46 | | | | ELEVATION CERTIFICATE / FORM BOARD SURVEY REQUIRED | | PRIOR TO CONCRETE POUR | | FINISHED CONSTRUCTION ELEVATION CERTIFICATE REQUIRED | | PRIOR TO FINAL INSPECTION | | | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
7 |
Status |
P |
Date |
2017-05-02 |
|
|
Cont ID |
|
Sent By |
gjohnson |
Date |
2017-05-02 |
Time |
11:04 |
Rev Time |
0.00 |
Received By |
gjohnson |
Date |
2017-05-02 |
Time |
10:04 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
6 |
Status |
P |
Date |
2017-03-28 |
|
|
Cont ID |
|
Sent By |
gjohnson |
Date |
2017-03-28 |
Time |
13:41 |
Rev Time |
0.00 |
Received By |
gjohnson |
Date |
2017-03-28 |
Time |
13:41 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
5 |
Status |
P |
Date |
2017-02-15 |
|
|
Cont ID |
|
Sent By |
gjohnson |
Date |
2017-02-15 |
Time |
09:28 |
Rev Time |
0.00 |
Received By |
gjohnson |
Date |
2017-02-15 |
Time |
09:28 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
4 |
Status |
F |
Date |
2016-12-03 |
|
|
Cont ID |
|
Sent By |
gjohnson |
Date |
2016-12-02 |
Time |
16:57 |
Rev Time |
0.00 |
Received By |
gjohnson |
Date |
2016-12-01 |
Time |
08:48 |
Sent To |
|
|
Notes |
2016-12-02 17:41:34 | 1ST REVIEW | | | | GEORGE JOHNSON | | PLUMBING PLANS EXAMINER LL | | CITY OF WEST PALM BEACH | | DEVELOPMENT SERVICES | | BUILDING DIVISION | | 561-805-6711 | | [email protected] | | | | PLUMBING COMMENTS: | | | | 1. THE BATHROOMS IN THE CLASS ROOMS ON FIRST FLOOR | | SHOULD COMPLY WITH THE REQUIREMENTS FOR THE YOUNGER | | CHILDREN IN THE ADVISORY CHART FBC ACC 604.9 | | | | 2. THE RIM OF LAVATORY'S IN ALL THE CHILDREN'S | | BATHROOMS SHOULD BE SET AT 31" ABOVE FINISHED FLOOR. | | PER FBC ACC 606.2 | | | | 3. SEPARATE FACILITIES FOR EACH SEX ARE REQUIRED FOR | | THE STAFF BATHROOMS. PER FBC PL 403.2 | | | | 4. SHT. A4.2 DETAIL 03 PLEASE PROVIDE THE DIMENSION | | FROM THE SIDE WALL OF TOILET TO THE PARTITION NEXT TO | | LAV IT SHALL BE A MIN OF 84" 85 " TO ALLOW FOR | | CONSTRUCTION TOLERANCES. PER FBC PL 604.3.1 | | | | 5. SHT. A4.2 DETAIL 01 THE WIDTH OF 6' 8" DOES NOT | | ALLOW FOR COMPLIANCE WITH FBC PL 604.3.1 IT SHALL BE | | 84" 85 " TO ALLOW FOR CONSTRUCTION TOLERANCES. | | | | 6.SHT A4.2 DETAIL 04 PROVIDE DIMENSION FROM SIDEWALL OF | | TOILET TO THE PARTITION TO COMPLY WITH FBC PL604.3.1 | | | | 7. SHT. 3.1 SANITARY RISER | | A) FIRST FLOOR RM 180 THE FLOOR DRAIN SHALL BE | | INDIVIDUALLY VENTED. PER FBC PL 901.2 AND 901.2.1 | | B)FIST FLOOR RM 181 THE FLOOR DRAIN SHALL CONNECT WITH | | FIXTURE BRANCH OF SERVICE SINK NO BUILDING DRAIN. PER | | FBC PL 901.2 AND 901.2.1 | | C)SECONDD FLOOR IN ROOM 280 THE FLOOR DRAIN SHALL BE | | INDIVIDUALLY VENTED. PER FBC PL 901.2 AND 901.2.1 | | D) SECON FLOOR THE EWC SHALL CONNECT DOWN STREAM OF THE | | BATHROOM GROUPS.FBC PL 909.1 | | | | 8 SHT. P8.1 DETAIL 7 THE HOT WATER RECIRCULATION RETURN | | LINE SHALL CONNECT TO COLD WATER INLET OF WATER HEATER | | AND THE TEMPERING VALVE. PER FBC PL 607.2.3 | | | | 9. SHT.P5.1 ROOF AREAS G,F,I,J HAVE A NOTE ON THEM THAT | | STATES HORIZONTAL STORM DRAIN SIZE = 3" 657 SF MAX THIS | | IS UNDER THE SF OF THESE AREAS PLEASE CLARIFY. PER WPB | | AMEND TO FBC 107.2.1 | | | | 10. SHT. P5.1 THE OVERFLOW DRAIN SHALL BE SIZED THE | | SAME AS THE PRIMARY DRAIN. PER FBC PL 1107.3 | | | | 11. PLEASE PROVIDE SF AND SLOPE ON THE STORM RISER | | DIAGRAM. PER WPB AMEND TO FBC 107.2.1 | | | | 12. SHT. P6.1 DETAIL 1 THE NOTE ON 1" CD DN TO FIRST | | FLOOR SHOULD READ DN FROM 2ND FLOOR PLEASE CLARIFY. PER | | WPB AMEND TO FBC 107.2.1 | | | | 13. ARE ANY OF THE CLASSROOMS BEING USED AS A SCIENCE | | LAB THAT WILL USW CHEMICALS IF SO PLEASE PROVIDE TYPE | | OF CHEMICAL MSDS SHEETS THE AMOUNTS AND HOW THERE BEING | | STORED. PER WPB AMEND TO FBC 107.2.1 | | | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
P |
Date |
2015-12-23 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2015-12-23 |
Time |
06:50 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2015-12-23 |
Time |
04:44 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
F |
Date |
2015-09-30 |
|
|
Cont ID |
|
Sent By |
TLarge |
Date |
2015-09-26 |
Time |
13:34 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2015-09-26 |
Time |
08:25 |
Sent To |
|
|
Notes |
2015-09-26 10:20:30 | SUBMIT CIVIL DRAWINGS FOR REVIEW.THE DESIGN | | PROFESSIONAL'S RESPONSE OF " CIVIL DRAWINGS WERE | | SUBMITTED BY THE CIVIL ENGINEER FOR REVIEW ON APRIL 21, | | 2015 " DOES NOT HELP ME IN APPROVING THIS PROJECT. I | | HAVE NOT REVIEWED ANY CIVIL DRAWINGS FOR THIS PROJECT | | AND I NEED TO REVIEW SPECIFIC SHEETS THAT SHOW THE | | CONTINUATION OF THE WATER AND SANITARY LINES FROM THE | | BUILDING. THE CIVIL DRAWINGS WERE PROBABLY SUBMITTED TO | | THE CWPB ENGINEERING DEPT. 2ND REQUEST. | | | | PLUMBING PLAN REVIEW | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | 561-805-6692 | | [email protected] | | | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2015-04-01 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2015-04-01 |
Time |
14:46 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2015-03-30 |
Time |
12:58 |
Sent To |
|
|
Notes |
2015-04-01 12:29:31 | 1) LIFE SAFETY SHEETS - THE BUILDING INFORMATION BOX | | SHOWS THE OCCUPANCY REQUIREMENTS FOR EDUCATION AT 20 | | SQUARE FEET PER PERSON YET LIFE SAFETY PLAN LS1.1 SHOWS | | THE OCCUPANT LOAD AS 35 SQUARE FEET PER PERSON. CLARIFY | | AND ENSURE THAT THE OCCUPANT LOADS OF THE AREAS ARE | | BASED ON TABLE 1004.1.1 OF THE 2010 FBC. | | 2) SHT. T1 & PLUMBING SHEETS OF THE PLANS I REVIEWED | | REFER TO CIVIL DRAWINGS. THERE WERE NO CIVIL DRAWINGS | | IN THE SET OF PLANS I REVIEWED. CLARIFY. | | 3) SHT.LS 1.2 IS MISSING FORM THE SET OF PLANS I | | REVIEWED. SUBMIT SHEET FOR REVIEW. | | 4) SHT. A8.2 - ENLARGED RESTROOM PLANS 02 03, 04, DO | | NOT COMPLY WITH THE 2010 FL. ACCESSIBILITY CODE SEC. | | 604.3, 606. THE MINIMUM REQUIRED WIDTH IS 85" IF BUILT | | PERFECT. 86 INCHES ALLOWS FOR CONSTRUCTION TOLERANCES. | | 5) SHT. A8.2 - DETAIL # 06 - IT APPEARS THAT THE DOOR | | MAY SWING INTO THE CLEAR FLOOR SPACE FOR THE LAVATORY | | IN ACCESSIBLE STALL IN THE MALE AND FEMALE RESTROOM. | | FAC SEC.604.8.1.2. | | 6) CLEARLY SHOW THE DIMENSIONS OF THE LENGTH AND WIDTH | | OF THE CLEAR FLOOR SPACES FOR THE LAVATORIES AND THE | | WATER CLOSETS IN THE ACCESSIBLE TOILET COMPARTMENTS AND | | TOILET ROOMS. FAC SECS.604.3 & 606.2. | | 7) VERTICAL ACCESSIBILITY IS REQUIRED TO THE SECOND | | FLOOR PER THE 2010 FAC SEC.201.1.1. | | 8) FLOOR DRAINS AND HOSE BIBBS ARE REQUIRED IN THE | | GROUP TOILET ROOMS PER THE 2010 FBC SEC.443.3.5.6. | | 9) SHT. P4.1 - CLINIC RESTROOM - THERE IS AN ARROW THAT | | POINTS TO "2 " SANITARY UP" BUT NOTHING IS SHOWN. | | CLRIFY. | | 10) SHT.P4.1 - ADULT RESTROOM # 1-103 - THE LAYOUT ON | | THE RISER DOESN'T CORRELATE WITH THE FLOOR PLAN. | | CLARIFY. | | 11) SHT. P4.1 - THE 2" LINE ON RISER BY EWC SAYS 2" | | SANITARY UP BUT IS NOT CONNECTED TO THE BUILDING DRAIN | | & TERMINATES NOWHERE. CLARIFY. | | 12) SHT. P4.1 - A WATER CLOSET IS MISSING FROM THE | | RISER FOR TOILET ROOMS 1-106 & 1-107A. | | 13) THE SANITARY RISER APPEARS TO MISSING PIPING FROM | | RESTROOMS 106-A & 107-A. | | 14) SHT. P4.1 - SINK SK-1 IN THE ART LAB IS NOT | | CONNECTED TO THE SANITARY SYSTEM. | | 15) SUBMIT SPECIFICATIONS ON THE SOLIDS INTERCEPTOR | | ZURN ZA - 1184. WPB AMEND. TO 2010 FBC SEC. 107.2.1. | | 16) SHT. P4.1 - SIZE THE VENT FOR SINK SK-1 IN THE ART | | LAB. | | 17) SHT.P4.1 - THE ARE NUMEROUS SECTIONS OF THE | | SANITARY RISER WHERE PIPNG HAS NO CONNECTION POINTS AND | | TERMINATES NOWHERE. SUBMIT A SANITARY RISER DIAGRAM | | THAT CLEARLY REFLECTS ALL AREAS OF THE INSTALLATION. | | EXPAND THE CONDENSED AREAS OF THE RISER DIAGRAM SO IT | | IS CLEAR AND LEGIBLE. WPB AMEND. TO 2010 FBC SEC. | | 107.3.5.1.3. | | 18) SHT. P4.1 - PLUMBING FIXTURE SCHEDULE - THE MINIMUM | | TRAP SIZE FOR SINKS SHALL BE 1 1/2" NOT 1 1/4" AS SHOWN | | PER FPC TABLE 709.1. | | 19) SHT. P4.2 - SIZE ALL SECTIONS OF THE WATER RISER. | | WPB AMEND. TO 2010 FBC SEC. 107.3.5.1.3. | | 20) SHT. P4.2 HAS NOTATION "WC-1" BUT NOTHING IS SHOWN. | | REFER TO SHT. P3.1 FOR LOCATION. SEE AREA BY GRID LINE | | H11. | | 21) SIZE THE WATER RISERS TO THE 2ND FLOOR. | | 22) SHT. P5.3 - A COMPLETE AND THOROUGH REVIEW CANNOT | | BE ACCOMPLISHED ON THE STORMWATER RISER BECAUSE IT IS | | INCOMPLETE; LINES TERMINATE NOWHERE, LINES ARE MISSING, | | ETC. SUBMIT A COMPLETE, CLEAR AND LEGIBLE STORMWATER | | RISER DIAGRAM FOR REVIEW. WPB AMEND. TO 2010 FBC SEC. | | 107.3.5.1.3. | | 23) SHT. P5.2 - THE DESIGN OF THE STORMWATER SYSTEM | | SHALL INCLUDE 1/2 THE AREA OF ANY VERTICAL WALL THAT | | DIVERTS WATER TO THE ROOF. SHOW THAT THE AREA OF THE | | PARAPET WALL HAS BEEN ADDED INTO THE STORMWATER DESIGN | | PER THE 2010 FPC SEC.1106.4. | | 24) SHT. P7.1 - THE PLAN SHOWS THE WATER HEATER BEING | | BOTTOM FED BY THE RECIRCULATING LINE. A VACUUM RELIEF | | VALVE IS REQUIRED ON THIS LINE PER SEC. 504.2 OF 2010 | | FPC. | | 25) SHT. P7.2 - THE DOMESTIC WATER DEMAND TABLE REFERS | | TO TABLE E103.2(2). THERE IS NO SUCH TABLE . CLARIFY. | | 26.) DOES THIS SCHOOL ALSO HAVE DAYCARE OR WILL IT BE | | USED AS A DAYCARE FACILITY AT ANY TIME? DAYCARE | | FACILITIES SHALL COMPLY W/ 2010 FBC SEC. 436. | | | | | | PLUMBING PLAN REVIEW | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | 561-805-6692 | | [email protected] | | | | | | | | | | | | | | |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
3 |
Status |
N |
Date |
2017-04-25 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2017-02-14 |
Time |
12:51 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2017-02-14 |
Time |
12:51 |
Sent To |
|
|
Notes |
2017-02-14 12:54:19 | PRODUCT APPROVALS TO BE SUBMITTED, REVIEWED BY DESIGNER | | OF RECORD, PRIOR TO INSTALLATION | | | | SEPARATE ROOF PERMIT APPLICATION, PRODUCT APPROVALS, | | ENGINEERING (IF APPLICABLE) REQUIRED | | | | COMPLY WITH DESIGN PRESSURES ON PAGE S1.3 | | | | ZONE 2: +47 / -193 | | ZONE 3: +47 / -290 | | | | | | |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
2 |
Status |
F |
Date |
2016-12-03 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2016-12-03 |
Time |
11:54 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2016-12-03 |
Time |
11:54 |
Sent To |
|
|
Notes |
2016-12-03 11:56:30 | SEE BUILDING REVIEW FOR COMMENTS REGARDING WIND DESIGN | | CRITERIA | | | | A SEPARATE ROOF PERMIT IS REQUIRED. IF ROOFING | | INFORMATION IS NOT PROVIDED AND REVIEWED PRIOR TO | | PERMIT ISSUANCE (PRODUCT APPROVAL REVIEWED BY DOR, | | SELECTED ASSEMBLY, ENGINEERING IF APPLICABLE), THE | | INFORMATION WILL BE REQUIRED TO BE SUBMITTED AS A | | REVISION PRIOR TO INSTALLATION. | | | | |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
1 |
Status |
N |
Date |
2016-01-20 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2016-01-20 |
Time |
14:01 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2016-01-20 |
Time |
14:01 |
Sent To |
|
|
Notes |
2016-01-20 14:03:07 | ROOF SUB PERMIT REQUIRED | | | | PRODUCT APPROVALS FOR ROOF SYSTEM (METAL DECK, R19 | | TAPERED INSULATION AND CONCRETE DECK, R19 TAPERED | | INSULATION, PREFAB SKYLIGHT SYSTEM) REVIEWED BY DOR IS | | REQUIRED TO BE SUBMITTED FOR PERMIT PRIOR TO | | INSTALLATION. | | | | ROOF COMPONENTS & CLADDING TO COMPLY WITH DESIGN | | PRESSURES SPECIFIED ON SHEET S6.1: | | | | VULT (MULTIPLY BY .6) | | | | ZONE 1, -95.6 | | ZONE 2, -160.30 | | ZONE 3, -241.3 | | | | | | |
|
|
Review Stop |
THRESHOLD |
THRESHOLD INSPECTOR DOCUMENTS |
Rev No |
4 |
Status |
P |
Date |
2017-04-25 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2017-04-25 |
Time |
07:58 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2017-04-25 |
Time |
07:58 |
Sent To |
|
|
Notes |
2017-04-25 08:01:30 | RESIDENT INSPECTOR APPROVED PER KEN CONRAD UNDER | | FOUNDATION PERMIT 17040644 | | KRES MIHELICH, AR0010560 | | TOMMY TAVARES, PE (INSPECTOR, ADDED 6/3/17) | | | | |
|
|
Review Stop |
THRESHOLD |
THRESHOLD INSPECTOR DOCUMENTS |
Rev No |
3 |
Status |
F |
Date |
2017-03-22 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2017-03-22 |
Time |
18:29 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2017-03-22 |
Time |
18:29 |
Sent To |
|
|
Notes |
2017-03-22 18:29:16 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | SEE NOTES FROM PREVIOUS REVIEW (ALSO BELOW). DUE TO THE | | REDESIGN, IT IS NOT CLEAR IF IT IS REQUIRED, BUT MAY BE | | BENEFICIAL TO THE CONTRACTOR'S SCHEDULE. | | | | PLEASE CONTACT ME PRIOR TO RESUBMITTAL OR, WHEN | | RESUBMITTING, PROVIDE THREE COMPLETE SETS OF PERMIT | | DOCUMENTS. | | | | PREVIOUS REVIEW: | | | | RESIDENT INSPECTOR REQUIRED | | SOILS/SITEWORK MONITORING BY A GEOTECHNICAL ENGINEER | | REQUIRED | | | | W. P. B. PERMIT: 15020937 | | ADD: 1901 S. FLAGLER DR. | | CONT: IBIS BUILDING CORP. | | TEL: (561)318-8408 | | E-MAIL: [email protected] | | | | 2010 FLORIDA BUILDING CODE W | | * 2010 WEST PALM BEACH AMENDMENTS TO THE FLORIDA | | BUILDING CODE, CHAPTER 1, ADMINISTRATION, 2010 EDITION | | 2012 FBC SUPPLEMENTS ADOPTED APRIL 25/2013. | | 3RD REVIEW | | DATE: JAN 20, 2016 | | ACTION: DENIED | | | | 1) 3RD REQUEST. THIS PROJECT WILL REQUIRE A RESIDENT | | INSPECTOR. | | 2010 WEST PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING | | CODE, CHAPTER 1, ADMINISTRATION, 110.3.9 OTHER | | INSPECTIONS SERVICES. THE BUILDING OFFICIAL MAY MAKE, | | OR CAUSE TO BE MADE BY OTHERS, THE INSPECTIONS REQUIRED | | BY SECTION 109. HE/SHE MAY ACCEPT REPORTS OF INSPECTORS | | OF RECOGNIZED INSPECTION SERVICES, PROVIDED THAT AFTER | | INVESTIGATION HE/SHE IS SATISFIED AS TO THEIR | | QUALIFICATIONS AND RELIABILITY. A CERTIFICATE CALLED | | FOR BY ANY PROVISION OF THE TECHNICAL CODES SHALL NOT | | BE BASED ON SUCH REPORTS UNLESS THE SAME ARE IN WRITING | | AND CERTIFIED BY A RESPONSIBLE OFFICER OF SUCH SERVICE. | | THE BUILDING OFFICIAL MAY REQUIRE THE OWNER TO EMPLOY | | AN INSPECTION SERVICE IN THE FOLLOWING INSTANCES: | | | | 1. FOR BUILDINGS OR ADDITIONS OF TYPE I OR II | | CONSTRUCTION | | 2. FOR ALL MAJOR STRUCTURAL ALTERATIONS | | 3. WHERE THE CONCRETE DESIGN IS BASED ON COMPRESSIVE | | STRENGTH (F ?C) IN EXCESS OF 3000 | | POUNDS PER SQUARE INCH | | 4. FOR PILE DRIVING | | 5. FOR BUILDINGS WITH AREA GREATER THAN 20,000 SQUARE | | FOOT | | 6. FOR BUILDINGS MORE THAN 2 STORIES IN HEIGHT | | 7. FOR BUILDINGS AND STRUCTURES OF UNUSUAL DESIGN OR | | METHODS OF CONSTRUCTION | | | | 1A) FOR THE RESIDENT INSPECTOR PLEASE PROVIDE A RESUME' | | OF INSPECTION EXPERIENCE ON PREVIOUS PROJECT. THE | | RESUME' MUST BE ACCOMPANIED BY ALL CERTIFICATES AS | | SPECIFIED HEREIN. THE BUILDING OFFICIAL OR HIS DESIGNEE | | WILL REVIEW THE RESUME'. AFTER THE RESUME' IS REVIEWED, | | AN INTERVIEW WILL BE SCHEDULED. UNDER NO CIRCUMSTANCES | | WILL AN INSPECTOR BE INTERVIEWED FOR WORK WITHOUT FIRST | | MEETING THE ABOVE CRITERIA. | | CONTACT KEN CONRAD | | TEL: 561-805-6666 | | E-MAIL: [email protected] | | | | 1B) THE CONTRACTOR WILL PRODUCE A JOB SUMMARY OR | | HISTORY FOR THIS TYPE OF CONSTRUCTION. THIS MAY BE | | SUBMITTED TO KEN CONRAD BY E-MAIL. KEN CONRAD: | | [email protected] | | | | 1C) NOTE FOR PAPER PLANS 3 SETS OF DOCUMENTS ARE | | REQUIRED INCLUDING SOILS REPORTS, ENERGY CALCS AND | | PRODUCT APPROVALS. FOR DIGITAL PLANS, AFTER PERMIT | | ISSUANCE, THE PERMIT LIBRARIAN WILL E-MAIL YOU, THE | | APPROVED AND BATCH STAMPED PLANS SO YOU MAY PRINT YOUR | | PLANS, TWO SETS OF PLANS WILL NEED TO BE PRINTED IN | | COLOR, (1) FOR THE RESIDENT INSPECTOR, THE OTHER FOR | | THE MEP INSPECTORS. | | | | 2. PURSUANT TO THE RECOMMENDATION OF ARDAMAN & | | ASSOCIATES LETTER DATED 3/31/2015, A GEOTECHNICAL | | ENGINEER SHALL MONITOR THE SITEWORK (EXCAVATION OF | | MUCK, COMPACTION AND FILL). IF ARDAMAN & ASSOCIATES IS | | NOT RETAINED TO PERFORM THE MONITORING, PROVIDE | | INFORMATION REGARDING THE COMPANY WHO WILL PROVIDE THIS | | SERVICE. | | | | | | | | | | |
|
|
Review Stop |
THRESHOLD |
THRESHOLD INSPECTOR DOCUMENTS |
Rev No |
2 |
Status |
F |
Date |
2016-12-03 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2016-12-03 |
Time |
11:57 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2016-12-03 |
Time |
11:57 |
Sent To |
|
|
Notes |
2016-12-03 11:57:41 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | SEE NOTES FROM PREVIOUS REVIEW (ALSO BELOW). DUE TO THE | | REDESIGN, IT IS NOT CLEAR IF IT IS REQUIRED, BUT MAY BE | | BENEFICIAL TO THE CONTRACTOR'S SCHEDULE. | | | | PLEASE CONTACT ME PRIOR TO RESUBMITTAL OR, WHEN | | RESUBMITTING, PROVIDE THREE COMPLETE SETS OF PERMIT | | DOCUMENTS. | | | | PREVIOUS REVIEW: | | | | RESIDENT INSPECTOR REQUIRED | | SOILS/SITEWORK MONITORING BY A GEOTECHNICAL ENGINEER | | REQUIRED | | | | W. P. B. PERMIT: 15020937 | | ADD: 1901 S. FLAGLER DR. | | CONT: IBIS BUILDING CORP. | | TEL: (561)318-8408 | | E-MAIL: [email protected] | | | | 2010 FLORIDA BUILDING CODE W | | * 2010 WEST PALM BEACH AMENDMENTS TO THE FLORIDA | | BUILDING CODE, CHAPTER 1, ADMINISTRATION, 2010 EDITION | | 2012 FBC SUPPLEMENTS ADOPTED APRIL 25/2013. | | 3RD REVIEW | | DATE: JAN 20, 2016 | | ACTION: DENIED | | | | 1) 3RD REQUEST. THIS PROJECT WILL REQUIRE A RESIDENT | | INSPECTOR. | | 2010 WEST PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING | | CODE, CHAPTER 1, ADMINISTRATION, 110.3.9 OTHER | | INSPECTIONS SERVICES. THE BUILDING OFFICIAL MAY MAKE, | | OR CAUSE TO BE MADE BY OTHERS, THE INSPECTIONS REQUIRED | | BY SECTION 109. HE/SHE MAY ACCEPT REPORTS OF INSPECTORS | | OF RECOGNIZED INSPECTION SERVICES, PROVIDED THAT AFTER | | INVESTIGATION HE/SHE IS SATISFIED AS TO THEIR | | QUALIFICATIONS AND RELIABILITY. A CERTIFICATE CALLED | | FOR BY ANY PROVISION OF THE TECHNICAL CODES SHALL NOT | | BE BASED ON SUCH REPORTS UNLESS THE SAME ARE IN WRITING | | AND CERTIFIED BY A RESPONSIBLE OFFICER OF SUCH SERVICE. | | THE BUILDING OFFICIAL MAY REQUIRE THE OWNER TO EMPLOY | | AN INSPECTION SERVICE IN THE FOLLOWING INSTANCES: | | | | 1. FOR BUILDINGS OR ADDITIONS OF TYPE I OR II | | CONSTRUCTION | | 2. FOR ALL MAJOR STRUCTURAL ALTERATIONS | | 3. WHERE THE CONCRETE DESIGN IS BASED ON COMPRESSIVE | | STRENGTH (F ?C) IN EXCESS OF 3000 | | POUNDS PER SQUARE INCH | | 4. FOR PILE DRIVING | | 5. FOR BUILDINGS WITH AREA GREATER THAN 20,000 SQUARE | | FOOT | | 6. FOR BUILDINGS MORE THAN 2 STORIES IN HEIGHT | | 7. FOR BUILDINGS AND STRUCTURES OF UNUSUAL DESIGN OR | | METHODS OF CONSTRUCTION | | | | 1A) FOR THE RESIDENT INSPECTOR PLEASE PROVIDE A RESUME' | | OF INSPECTION EXPERIENCE ON PREVIOUS PROJECT. THE | | RESUME' MUST BE ACCOMPANIED BY ALL CERTIFICATES AS | | SPECIFIED HEREIN. THE BUILDING OFFICIAL OR HIS DESIGNEE | | WILL REVIEW THE RESUME'. AFTER THE RESUME' IS REVIEWED, | | AN INTERVIEW WILL BE SCHEDULED. UNDER NO CIRCUMSTANCES | | WILL AN INSPECTOR BE INTERVIEWED FOR WORK WITHOUT FIRST | | MEETING THE ABOVE CRITERIA. | | CONTACT KEN CONRAD | | TEL: 561-805-6666 | | E-MAIL: [email protected] | | | | 1B) THE CONTRACTOR WILL PRODUCE A JOB SUMMARY OR | | HISTORY FOR THIS TYPE OF CONSTRUCTION. THIS MAY BE | | SUBMITTED TO KEN CONRAD BY E-MAIL. KEN CONRAD: | | [email protected] | | | | 1C) NOTE FOR PAPER PLANS 3 SETS OF DOCUMENTS ARE | | REQUIRED INCLUDING SOILS REPORTS, ENERGY CALCS AND | | PRODUCT APPROVALS. FOR DIGITAL PLANS, AFTER PERMIT | | ISSUANCE, THE PERMIT LIBRARIAN WILL E-MAIL YOU, THE | | APPROVED AND BATCH STAMPED PLANS SO YOU MAY PRINT YOUR | | PLANS, TWO SETS OF PLANS WILL NEED TO BE PRINTED IN | | COLOR, (1) FOR THE RESIDENT INSPECTOR, THE OTHER FOR | | THE MEP INSPECTORS. | | | | 2. PURSUANT TO THE RECOMMENDATION OF ARDAMAN & | | ASSOCIATES LETTER DATED 3/31/2015, A GEOTECHNICAL | | ENGINEER SHALL MONITOR THE SITEWORK (EXCAVATION OF | | MUCK, COMPACTION AND FILL). IF ARDAMAN & ASSOCIATES IS | | NOT RETAINED TO PERFORM THE MONITORING, PROVIDE | | INFORMATION REGARDING THE COMPANY WHO WILL PROVIDE THIS | | SERVICE. | | | | | | | | | | |
|
|
Review Stop |
THRESHOLD |
THRESHOLD INSPECTOR DOCUMENTS |
Rev No |
1 |
Status |
F |
Date |
2016-01-20 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2016-01-20 |
Time |
10:59 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2016-01-20 |
Time |
10:59 |
Sent To |
|
|
Notes |
2016-01-20 11:06:12 | RESIDENT INSPECTOR REQUIRED | | SOILS/SITEWORK MONITORING BY A GEOTECHNICAL ENGINEER | | REQUIRED | | | | W. P. B. PERMIT: 15020937 | | ADD: 1901 S. FLAGLER DR. | | CONT: IBIS BUILDING CORP. | | TEL: (561)318-8408 | | E-MAIL: [email protected] | | | | 2010 FLORIDA BUILDING CODE W | | * 2010 WEST PALM BEACH AMENDMENTS TO THE FLORIDA | | BUILDING CODE, CHAPTER 1, ADMINISTRATION, 2010 EDITION | | 2012 FBC SUPPLEMENTS ADOPTED APRIL 25/2013. | | 3RD REVIEW | | DATE: JAN 20, 2016 | | ACTION: DENIED | | | | 1) 3RD REQUEST. THIS PROJECT WILL REQUIRE A RESIDENT | | INSPECTOR. | | 2010 WEST PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING | | CODE, CHAPTER 1, ADMINISTRATION, 110.3.9 OTHER | | INSPECTIONS SERVICES. THE BUILDING OFFICIAL MAY MAKE, | | OR CAUSE TO BE MADE BY OTHERS, THE INSPECTIONS REQUIRED | | BY SECTION 109. HE/SHE MAY ACCEPT REPORTS OF INSPECTORS | | OF RECOGNIZED INSPECTION SERVICES, PROVIDED THAT AFTER | | INVESTIGATION HE/SHE IS SATISFIED AS TO THEIR | | QUALIFICATIONS AND RELIABILITY. A CERTIFICATE CALLED | | FOR BY ANY PROVISION OF THE TECHNICAL CODES SHALL NOT | | BE BASED ON SUCH REPORTS UNLESS THE SAME ARE IN WRITING | | AND CERTIFIED BY A RESPONSIBLE OFFICER OF SUCH SERVICE. | | THE BUILDING OFFICIAL MAY REQUIRE THE OWNER TO EMPLOY | | AN INSPECTION SERVICE IN THE FOLLOWING INSTANCES: | | | | 1. FOR BUILDINGS OR ADDITIONS OF TYPE I OR II | | CONSTRUCTION | | 2. FOR ALL MAJOR STRUCTURAL ALTERATIONS | | 3. WHERE THE CONCRETE DESIGN IS BASED ON COMPRESSIVE | | STRENGTH (F ?C) IN EXCESS OF 3000 | | POUNDS PER SQUARE INCH | | 4. FOR PILE DRIVING | | 5. FOR BUILDINGS WITH AREA GREATER THAN 20,000 SQUARE | | FOOT | | 6. FOR BUILDINGS MORE THAN 2 STORIES IN HEIGHT | | 7. FOR BUILDINGS AND STRUCTURES OF UNUSUAL DESIGN OR | | METHODS OF CONSTRUCTION | | | | 1A) FOR THE RESIDENT INSPECTOR PLEASE PROVIDE A RESUME' | | OF INSPECTION EXPERIENCE ON PREVIOUS PROJECT. THE | | RESUME' MUST BE ACCOMPANIED BY ALL CERTIFICATES AS | | SPECIFIED HEREIN. THE BUILDING OFFICIAL OR HIS DESIGNEE | | WILL REVIEW THE RESUME'. AFTER THE RESUME' IS REVIEWED, | | AN INTERVIEW WILL BE SCHEDULED. UNDER NO CIRCUMSTANCES | | WILL AN INSPECTOR BE INTERVIEWED FOR WORK WITHOUT FIRST | | MEETING THE ABOVE CRITERIA. | | CONTACT KEN CONRAD | | TEL: 561-805-6666 | | E-MAIL: [email protected] | | | | 1B) THE CONTRACTOR WILL PRODUCE A JOB SUMMARY OR | | HISTORY FOR THIS TYPE OF CONSTRUCTION. THIS MAY BE | | SUBMITTED TO KEN CONRAD BY E-MAIL. KEN CONRAD: | | [email protected] | | | | 1C) NOTE FOR PAPER PLANS 3 SETS OF DOCUMENTS ARE | | REQUIRED INCLUDING SOILS REPORTS, ENERGY CALCS AND | | PRODUCT APPROVALS. FOR DIGITAL PLANS, AFTER PERMIT | | ISSUANCE, THE PERMIT LIBRARIAN WILL E-MAIL YOU, THE | | APPROVED AND BATCH STAMPED PLANS SO YOU MAY PRINT YOUR | | PLANS, TWO SETS OF PLANS WILL NEED TO BE PRINTED IN | | COLOR, (1) FOR THE RESIDENT INSPECTOR, THE OTHER FOR | | THE MEP INSPECTORS. | | | | 2. PURSUANT TO THE RECOMMENDATION OF ARDAMAN & | | ASSOCIATES LETTER DATED 3/31/2015, A GEOTECHNICAL | | ENGINEER SHALL MONITOR THE SITEWORK (EXCAVATION OF | | MUCK, COMPACTION AND FILL). IF ARDAMAN & ASSOCIATES IS | | NOT RETAINED TO PERFORM THE MONITORING, PROVIDE | | INFORMATION REGARDING THE COMPANY WHO WILL PROVIDE THIS | | SERVICE. | | | | | | | | |
|
|
Review Stop |
X |
PERMIT EXTENSION |
Rev No |
1 |
Status |
N |
Date |
2016-11-09 |
|
|
Cont ID |
|
Sent By |
rbrown |
Date |
2016-07-25 |
Time |
14:25 |
Rev Time |
0.00 |
Received By |
rbrown |
Date |
2016-07-25 |
Time |
14:18 |
Sent To |
|
|
Notes |
2016-11-09 14:26:55 | LETTER REQUEST FROM HARVARD JOLLY ARCHITECTURE. PERMIT | | APPLICATION EXTENDED TO 1/25/17. |
|
|
Review Stop |
Z |
ZONING |
Rev No |
8 |
Status |
P |
Date |
2017-06-12 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2017-06-12 |
Time |
14:36 |
Rev Time |
2.00 |
Received By |
eschneid |
Date |
2017-06-08 |
Time |
10:45 |
Sent To |
|
|
Notes |
2017-06-12 14:37:17 | PASSED W/PROVISOS | | | | 1) PRIOR TO THE C.O. OF THE BUILDING, A MINOR AMENDMENT | | IS REQUIRED TO BE SUBMITTED TO THE PLANNING DIVISION TO | | REFLECT THE CHANGES BASED ON THE NEW BUILDING SQUARE | | FOOTAGE AND THE RAMP. | | | | 2) SEPARATE PERMITS, WITH PLANS, ARE REQUIRED FOR: | | A. LANDSCAPE | | B. BICYCLE RACK | | C. NEW FENCES AND GATES. | | D. EXTERIOR SIGNAGE | | E. FLAG POLE ? NOTE: THE MAXIMUM FLAG POLE HEIGHT IS 80 | | FEET. | | F. SITE LIGHTING | | G. ARBOR STRUCTURE | | H. SECURITY KIOSK | | I. FABRIC CANOPIES | | J. HARDSCAPE | | K. PLAYGROUND EQUIPMENT | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | [email protected] | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
7 |
Status |
F |
Date |
2017-05-17 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2017-05-17 |
Time |
10:33 |
Rev Time |
2.00 |
Received By |
eschneid |
Date |
2017-05-16 |
Time |
16:01 |
Sent To |
|
|
Notes |
2017-05-17 10:40:14 | FAILED | | | | PLEASE PROVIDE WRITTEN RESPONSES. | | | | 1) THE SITE DATE TABLE ON SHEET SP-3 SHOWS AN INCREASE | | IN THE SQUARE FOOTAGE OF THE ACADEMIC BUILDING TO | | 16,030 SF, YET THIS IS NOT REFLECTED ON THE BUILDING | | SHOWN ON THE PLAN - STILL SHOWS THE BUILDING AS HAVING | | 15,996 SF. THE BUILDING ON SHEET C.1 ALSO SHOWS AS | | 15,966. PLANS MUST BE INTERNALLY CONSISTENT. | | | | 2) THE SETBACKS LISTED ON THE SITE DATA TABLE FOR THE | | EXISTING PBDA CONTINUE TO SHOW THE INCORRECT FRONT | | (SOUTH) AND REAR (NORTH) SETBACK. NOTE: THIS WAS | | CORRECTED ON THE PLANS APPROVED AS PART OF THE MINOR | | PLANNED DEVELOPMENT AMENDMENT DATED APRIL 21, 2017. | | | | 3) THE NEW RAMP BETWEEN THE EXISTING AND THE PROPOSED | | BUILDING IS NOT SHOWN ON SP-3. ALL PLANS SHALL SHOW THE | | SAME CONDITIONS. | | | | 4) THE LOCATION OF THE NEW RAMP COMBINED WITH THE FENCE | | TO THE WEST OF THE BICYCLE RACKS, RESULT IN THE RACKS | | BEING BLOCKED AND NON-FUNCTIONAL. RELOCATE THE FENCE, | | THE BICYCLE RACKS OR THE RAMP SO THAT STUDENTS OR | | FACULTY WHO RIDE THEIR BICYCLES TO THE CAMPUS CAN | | ACCESS THE BICYCLE RACKS TO SECURE THEIR BICYCLES. | | | | 5) SHEET AS3.2 SHOWS A NEW CANOPY PLAN DETAIL WHICH | | INCLUDES THE PROPOSED RAMP. THIS FAILS TO SHOW THE | | BICYCLE RACK AND FENCE MENTIONED IN COMMENT NO. 4. IT | | NEEDS TO SHOW ALL FEATURES IN THE AREA. | | | | 6) SHEETS A1.01 AND A1.1 NEED TO SHOW THE BICYCLE RACK | | IF IT WILL REMAIN IN PLACE (THIS REQUIRES THE | | RELOCATION OF THE FENCE). | | | | 7) THE OIL AND GAS INTERCEPTOR SHOWN ON SHEET C.1 MUST | | BE RELOCATED SO THAT IT DOES NOT INTERFERE WITH THE | | TREES APPROVED ON THE LANDSCAPE PLAN IN THE SAME | | LOCATION. PLEASE NOTE THAT THE CURRENTLY SHOWN | | IMPERVIOUS AREAS INCLUDE THE REQUIRED LANDSCAPE, SO | | STAFF RECOMMENDS THAT THE OGI BE LOCATED UNDERNEATH A | | SIDEWALK OR OTHER PAVED AREA. | | | | 8) THE ROOF PLAN AND ELEVATIONS DO NOT SHOW ANY | | MECHANICAL EQUIPMENT FOR THE ELEVATOR EXTENDING ABOVE | | THE ROOF. PLEASE VERIFY THIS IS CORRECT. STAFF IS USED | | TO SEEING ELEVATORS HAVE EQUIPMENT EXTEND ABOVE THE | | ROOFLINE. | | | | 9) A NEW MINOR AMENDMENT IS REQUIRED TO REFLECT THE | | CHANGES BASED ON THE NEW BUILDING SQUARE FOOTAGE AND | | THE RAMP. | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446. | | [email protected] |
|
|
Review Stop |
Z |
ZONING |
Rev No |
6 |
Status |
P |
Date |
2017-04-04 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2017-04-04 |
Time |
08:52 |
Rev Time |
2.00 |
Received By |
eschneid |
Date |
2017-04-04 |
Time |
08:52 |
Sent To |
|
|
Notes |
2017-04-04 11:45:21 | PASSED W/PROVISO | | | | PROVISO - THE WALKWAY CANOPY SUPPORT POSTS NEED TO BE | | LOCATED OUTSIDE OF THE SIDEWALK ADJACENT TO COCOANUT | | LANE. | | | | SEPARATE PERMITS, WITH PLANS, ARE REQUIRED FOR: | | | | A. LANDSCAPE | | B. BICYCLE RACK | | C. NEW FENCES AND GATES. | | D. EXTERIOR SIGNAGE | | E. FLAG POLE | | F. SITE LIGHTING | | G. ARBOR STRUCTURE | | H. SECURITY KIOSK | | I. FABRIC CANOPIES | | J. HARDSCAPE | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | [email protected] |
|
|
Review Stop |
Z |
ZONING |
Rev No |
5 |
Status |
F |
Date |
2017-02-22 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2017-02-22 |
Time |
15:16 |
Rev Time |
2.00 |
Received By |
eschneid |
Date |
2017-02-17 |
Time |
13:49 |
Sent To |
|
|
Notes |
2017-02-22 15:19:43 | FAILED | | | | 1) THE COTLEUR HEARING SITE PLAN DOES NOT PROVIDE THE | | CORRECT DATA TABLES. THIS PLAN INCLUDES NEITHER THE | | TABLES ON THE CURRENTLY APPROVED PLANS NOR THE TABLES | | TO REFLECT THE PLANS UNDER REVIEW AS THE MINOR | | AMENDMENT. PROVIDE SHEET SP-3 AS UPDATED BY THE MINOR | | AMENDMENT COMMENTS ISSUED ON FEBRUARY 22, 2017. | | | | 2) REPEAT COMMENT: PROVIDE TWO COPIES OF AN UPDATED | | SURVEY SHOWING THE RELOCATED EASEMENTS AND ALL FEATURES | | IN THE AREA OF WORK. THE SURVEY NEEDS TO BE BASED ON | | THE RECENTLY RECORDED PLAT SO THAT IT IS AN ACCURATE | | DEPICTION OF THE SITE CONDITIONS SO THAT STAFF CAN | | VERIFY THAT THE BUILDING PLACEMENT COMPLIES WITH | | SETBACKS AND DOES NOT ENCROACH ON ANY EASEMENTS. | | | | 3) THE SITE PLAN PREPARED BY COTLEUR AND HEARING, DATED | | JANUARY 3, 2017, AND PROVIDED TO THE CITY AS PART OF | | THE MINOR AMENDMENT RESUBMITTAL SHOWS A SETBACK OF 24.1 | | FEET TO THE NORTHERN PROPERTY LINE (CLOSEST POINT | | NORTHERN STAIRWAY) WHILE THE ARCHITECTURAL SITE PLAN | | PREPARED BY HARVARD JOLLY AND SUBMITTED WITH THE PERMIT | | SHOWS A SETBACK OF 22 FEET 1 INCHES. ALL PLANS SHALL | | SHOW THE SAME, ACCURATE SETBACK DIMENSIONS. PLEASE NOTE | | THAT THE CIVIL PLAN DOES NOT CONTAIN ANY SETBACK | | INFORMATION WHICH STAFF COULD HAVE USED TO DETERMINE | | WHICH SET OF PLANS IS ACCURATE. | | | | 4) REPEAT COMMENT: IT APPEARS THAT THE WALKWAY CANOPY | | OVERHANGS THE NEW COCOANUT LANE RIGHT-OF-WAY, WHICH IS | | NOT PERMITTED. THIS WILL BE VERIFIED ONCE THE SURVEY IS | | REVISED BASED ON THE RECORDED PLAT. NOTE: THE CIVIL | | PLAN APPEARS TO SHOW A DIFFERENT CANOPY THAN THE SITE | | AND ARCHITECTURAL PLANS (NO SIDEWALK OVERHANG OF | | SIDEWALK ALONG RELOCATED COCOANUT LANE). | | | | 5) SEPARATE PERMITS, WITH PLANS, ARE REQUIRED FOR: | | | | A. LANDSCAPE | | B. BICYCLE RACK | | C. NEW FENCES AND GATES. | | D. EXTERIOR SIGNAGE | | E. FLAG POLE | | F. SITE LIGHTING | | G. ARBOR STRUCTURE | | H. SECURITY KIOSK | | I. FABRIC CANOPIES | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | [email protected] |
|
|
Review Stop |
Z |
ZONING |
Rev No |
4 |
Status |
F |
Date |
2016-12-06 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2016-12-06 |
Time |
09:40 |
Rev Time |
4.00 |
Received By |
eschneid |
Date |
2016-12-06 |
Time |
09:40 |
Sent To |
|
|
Notes |
2016-12-06 09:40:50 | FAILED | | | | 1) ZONING WILL NOT APPROVE THIS PERMIT UNTIL THE PLAT | | FOR THE REALIGNMENT OF COCOANUT AND TUXEDO LANES IS | | RECORDED. THIS PERMIT SHOWS BUILDING CONSTRUCTION | | WITHIN WHAT IS CURRENTLY CITY RIGHT-OF-WAY. | | | | 2) THE SURVEY PROVIDED WITH THE PERMIT IS NO LONGER | | ACCURATE BASED ON THE RECENT ROADWAY REALIGNMENT, THE | | BUILDING DEMOLITION, AND THE INSTALLATION OF THE | | PARKING LOT AND FLAGLER DRIVE WALL. PROVIDE TWO COPIES | | OF AN UPDATED SURVEY SHOWING THE RELOCATED EASEMENTS | | AND ALL FEATURES IN THE AREA OF WORK. THE SURVEY NEEDS | | TO BE REVISED AFTER THE PLAT IS RECORDED SO THAT IT IS | | AN ACCURATE DEPICTION OF THE SITE CONDITIONS. | | | | 3) REMOVE BUILDING #3 FROM THE CIVIL PLAN AS IT IS NOT | | BEING CONSTRUCTED AS PART OF THIS PERMIT APPLICATION. | | | | 4) PROVIDE THE SETBACK DIMENSIONS FOR THE PROPOSED | | BUILDING, KIOSK, STAIRWAY AND CANOPY STRUCTURES ON THE | | PLANS TO THE PROPERTY LINES. THE PROPERTY LINES SHALL | | MATCH THE PROPERTY LINES AFTER THE PLAT IS RECORDED. | | THE SETBACKS SHALL BE MEASURED FROM THE CLOSEST PORTION | | OF THE BUILDING TO THE PROPERTY LINES AND SHALL COMPLY | | WITH THE PREVIOUSLY APPROVED SITE PLANS. PLEASE NOTE | | THAT THE CURRENT MINOR AMENDMENT DOES NOT CORRECTLY | | SHOW THE SETBACK TABLE ON THE COTLEUR HEARING MASTER | | PLAN. | | | | 5) IT APPEARS THAT THE WALKWAY CANOPY OVERHANGS THE NEW | | COCOANUT LANE RIGHT-OF-WAY, WHICH IS NOT PERMITTED. | | THIS WILL BE VERIFIED ONCE THE SURVEY IS REVISED BASED | | ON THE RECORDATION OF THE PLAT WHICH INCLUDES THE | | REALIGNMENT OF COCOANUT AND TUXEDO LANES. | | | | 6) PLEASE EXPLAIN WHY ALL OF THE WINDOWS DO NOT HAVE | | THE HORIZONTAL SUN CONTROL (ALL ELEVATIONS). THE NEW | | BUILDING WAS TO MIMIC THE EXISTING BUILDING IN THIS | | REGARD. | | | | 7) REMOVE PLANS FOR THE GYMNASIUM BUILDING FROM THIS | | SUBMITTAL AS THEY ARE NOT PART OF THIS PERMIT | | APPLICATION. | | | | 8) PROVIDE DETAILS TO VERIFY THAT THE NEW ROOFTOP | | CHILLER IS SCREENED FROM VIEW FROM THE SOUTH AND WEST. | | THE SECTION SHEETS DO NOT SEEM TO SHOW THE WALL HIGH | | ENOUGH, ESPECIALLY FROM THE WEST WHERE THERE IS A GRADE | | DIFFERENTIAL TOWARD SOUTH OLIVE AVENUE. | | | | 9) SEPARATE PERMITS, WITH PLANS, ARE REQUIRED FOR: | | | | A. LANDSCAPE | | B. BICYCLE RACK | | C. NEW FENCES AND GATES. | | D. SIGNAGE | | E. FLAG POLE | | F. SITE LIGHTING | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446. | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
3 |
Status |
F |
Date |
2016-01-25 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2016-01-25 |
Time |
08:57 |
Rev Time |
4.00 |
Received By |
eschneid |
Date |
2016-01-25 |
Time |
08:57 |
Sent To |
|
|
Notes |
2016-01-25 10:49:06 | FAILED | | | | PROVIDE WRITTEN RESPONSE. | | | | 1) REPEAT COMMENT: PROVIDE VERIFICATION THAT THE | | DEVELOPMENT CONDITIONS FROM RESOLUTION NO. 144-11 | | LISTED BELOW HAVE BEEN SATISFIED: | | | | A. GRANT TO THE CITY A TEMPORARY ACCESS EASEMENT FOR | | USE OF TUXEDO AND COCONUT LANES UNTIL THE ROADS ARE | | RELOCATED; EXISTING UTILITIES UNTIL RELOCATED; AND | | EXISTING DRAINAGE UNTIL RELOCATED, IN FORM ACCEPTABLE | | TO THE CITY. THIS HAS NOT BEEN COMPLETED. | | | | B. GRANT TO THE CITY A DRAINAGE AND FLOWAGE EASEMENT | | FOR ALL ON-SITE DRAINAGE AND FLOWAGE THROUGH THE | | BIOSWALE [OR CURRENT ITERATION]. PBDA SHALL BE | | RESPONSIBLE FOR MAINTENANCE OF ALL ON-SITE DRAINAGE. | | THIS HAS NOT BEEN COMPLETED. | | | | E. RECORD A PLAT FOR THE ENTIRE PBDA CAMPUS. PRIOR TO | | RECORDATION, THE PLAT SHALL BE SUBMITTED FOR REVIEW | | THROUGH THE MINOR SUBDIVISION PROCESS TO INCLUDE ALL | | REQUIRED EASEMENTS. THE RELOCATION AND/OR ABANDONMENT | | OF EASEMENTS WILL REQUIRE APPLICATIONS TO BE FILED WITH | | THE ENGINEERING SERVICES DIVISION. THIS HAS NOT BEEN | | COMPLETED. | | | | H. THE PBDA SHALL PROVIDE A TEMPORARY ACCESS, UTILITY | | AND DRAINAGE EASEMENT, APPROVED BY THE ENGINEERING | | SERVICES DEPARTMENT, IN FAVOR OF THE CITY AT THE TIME | | OF THE RECORDATION OF THE PBDA PLAT. THIS HAS NOT BEEN | | COMPLETED. | | | | 2) REPEAT COMMENT: PROVIDE VERIFICATION THAT THE | | FOLLOWING CONDITIONS OUTLINED IN RESOLUTION NO. 341-10 | | HAVE BEEN MET: | | | | A. PALM BEACH DAY ACADEMY SHALL RECORD A PLAT FOR THE | | ENTIRE CAMPUS. PRIOR TO RECORDATION, THE PALM BEACH DAY | | ACADEMY SHALL MAKE APPLICATION TO THE PLANNING AND | | ZONING DEPARTMENT FOR THE REVIEW OF THE PLAT THROUGH | | THE MINOR SUBDIVISION PROCESS WITH FINAL PLAT APPROVAL | | THROUGH AN APPLICATION SUBMITTED TO THE CITY'S | | ENGINEERING SERVICES DEPARTMENT. ALL REQUIRED EASEMENTS | | SHALL BE PROVIDED EITHER BY PLAT OR SEPARATE | | INSTRUMENT, IN A FORM ACCEPTABLE TO THE CITY. THIS HAS | | NOT BEEN COMPLETED. | | | | B. IN THE EVENT THE UTILITIES ARE RELOCATED TO ANOTHER | | AREA OF THE PALM BEACH DAY ACADEMY CAMPUS, THE PALM | | BEACH DAY ACADEMY SHALL GRANT TO THE CITY A UTILITY | | EASEMENT OVER, UNDER AND THROUGH SUCH AREA OF THE | | CAMPUS. THIS HAS NOT BEEN COMPLETED. | | | | C. PALM BEACH DAY ACADEMY SHALL SUBMIT AN APPLICATION | | TO THE ENGINEERING SERVICES DEPARTMENT FOR THE | | REALIGNMENT OF THE TUXEDO AND COCOANUT LANES AND THE | | RELOCATION OF ANY CITY UTILITIES. AFTER THE ENGINEERING | | SERVICES DEPARTMENT APPROVAL, THE PALM BEACH DAY | | ACADEMY SHALL, AT ITS OWN COST AND EXPENSE, REALIGN THE | | INTERSECTION OF TUXEDO AND COCOANUT LANES AND RELOCATE | | ANY AND ALL UTILITY LINES LOCATED WITHIN THE ABANDONED | | RIGHT-OF-WAY. THE PALM BEACH DAY ACADEMY SHALL POST A | | BOND TO THE CITY IN THE AGREED AMOUNT OF THE ESTIMATED | | COSTS ASSOCIATED WITH THE RELOCATION OF THE ROADWAY AND | | THE UTILITY LINES PRIOR TO THE RECORDATION OF THE PALM | | BEACH DAY ACADEMY PLAT. THIS HAS NOT BEEN COMPLETED. | | | | D. PALM BEACH DAY ACADEMY SHALL PROVIDE TO THE CITY A | | TEMPORARY ACCESS EASEMENT, AND TEMPORARY UTILITIES AND | | DRAINAGE EASEMENTS OVER AND ACROSS THE ABANDONED | | RIGHT-OF-WAY, IN FORM APPROVED BY THE OFFICE OF THE | | CITY ATTORNEY, AT THE TIME OF THE RECORDATION OF THE | | PALM BEACH DAY ACADEMY PLAT. THIS HAS NOT BEEN | | COMPLETED. | | | | E. PALM BEACH DAY ACADEMY SHALL TENDER AND DELIVER | | $11,000 TO THE CITY AS COMPENSATION FOR THE VALUE OF | | THE RIGHT-OF-WAY AND ASSOCIATED DEVELOPMENT RIGHTS. | | THIS HAS NOT BEEN COMPLETED. | | | | 3) REPEAT COMMENT: PROVIDE VERIFICATION THAT THE | | FOLLOWING CONDITIONS OUTLINED IN RESOLUTION NO. 342-10 | | HAVE BEEN MET: | | | | A. PALM BEACH DAY ACADEMY SHALL RECORD A PLAT FOR THE | | ENTIRE CAMPUS. PRIOR TO RECORDATION, THE PALM BEACH DAY | | ACADEMY SHALL MAKE APPLICATION TO THE PLANNING AND | | ZONING DEPARTMENT FOR THE REVIEW OF THE PLAT THROUGH | | THE MINOR SUBDIVISION PROCESS WITH FINAL PLAT APPROVAL | | THROUGH AN APPLICATION SUBMITTED TO THE CITY'S | | ENGINEERING SERVICES DEPARTMENT. ALL REQUIRED EASEMENTS | | SHALL BE PROVIDED EITHER BY PLAT OR SEPARATE | | INSTRUMENT, IN A FORM ACCEPTABLE TO THE CITY. THIS HAS | | NOT BEEN COMPLETED. | | | | B. PALM BEACH DAY ACADEMY SHALL SUBMIT AN APPLICATION | | TO THE ENGINEERING SERVICES DEPARTMENT FOR THE | | REALIGNMENT OF THE TUXEDO AND COCOANUT LANES AND THE | | RELOCATION OF ANY CITY UTILITIES. AFTER THE ENGINEERING | | SERVICES DEPARTMENT APPROVAL, THE PALM BEACH DAY | | ACADEMY SHALL, AT ITS OWN COST AND EXPENSE, REALIGN THE | | INTERSECTION OF TUXEDO AND COCOANUT LANES AND RELOCATE | | ANY AND ALL UTILITY LINES LOCATED WITHIN THE ABANDONED | | RIGHT-OF-WAY. THE PALM BEACH DAY ACADEMY SHALL POST A | | BOND TO THE CITY IN THE AGREED AMOUNT OF THE ESTIMATED | | COSTS ASSOCIATED WITH THE RELOCATION OF THE ROADWAY AND | | THE UTILITY LINES PRIOR TO THE RECORDATION OF THE PALM | | BEACH DAY ACADEMY PLAT. THIS HAS NOT BEEN COMPLETED. | | | | C. IN THE EVENT THE UTILITIES ARE RELOCATED TO ANOTHER | | AREA OF THE PALM BEACH DAY ACADEMY CAMPUS, THE PALM | | BEACH DAY ACADEMY SHALL GRANT TO THE CITY A UTILITY | | EASEMENT OVER, UNDER AND THROUGH SUCH AREA OF THE | | CAMPUS. THIS HAS NOT BEEN COMPLETED. | | | | D. PALM BEACH DAY ACADEMY SHALL PROVIDE TO THE CITY | | TEMPORARY UTILITIES AND DRAINAGE EASEMENTS OVER AND | | ACROSS THE ABANDONED RIGHT-OF-WAY, IN FORM APPROVED BY | | THE CITY ATTORNEY'S OFFICE, AT THE TIME OF THE | | RECORDATION OF THE PALM BEACH DAY ACADEMY PLAT. THIS | | HAS NOT BEEN COMPLETED. | | | | E. PALM BEACH DAY ACADEMY SHALL TENDER AND DELIVER | | $24,000 TO THE CITY AS COMPENSATION FOR THE VALUE OF | | THE RIGHT-OF-WAY AND ASSOCIATED DEVELOPMENT RIGHTS. | | THIS HAS NOT BEEN COMPLETED. | | | | 4) REPEAT COMMENT: THE SURVEY INCLUDED WITH THE PERMIT | | APPLICATION IS FROM 2010 AND DOES NOT REFLECT THE | | CURRENT CONDITIONS, ESPECIALLY ON THE WESTERN HALF OF | | THE SITE. AN ACCURATE RECENT SURVEY IS REQUIRED. | | | | 5) REPEAT COMMENT: THE INTERIM SITE LAYOUT REQUIRES A | | MINIMUM OF 61 PARKING SPACES. THE CURRENTLY SUBMITTED | | INTERIM PLAN ONLY SHOWS 59 SPACES. THE TWO SPACES ON | | THE SOUTH SIDE OF THE BUILDING ARE BUS PARKING SPACES, | | NOT REGULAR PARKING SPACES. | | | | 6) REPEAT COMMENT: SHEET G1.1 DOES NOT MATCH THE CIVIL | | PLANS SUBMITTED AS PART OF THE PERMIT APPLICATION OR | | THE PLANS SUBMITTED AS PART OF THE MINOR PLANNED | | DEVELOPMENT AMENDMENT. ALL PLANS SHALL SHOW CONSISTENT | | CONDITIONS AND BE APPROVED THROUGH THE MINOR PLANNED | | DEVELOPMENT AMENDMENT PROCESS. | | | | 7) REPEAT COMMENT: ON SHEET A4.1, THE MECHANICAL SCREEN | | WALL ELEVATION IS SHOWN AT 130 FEET, YET THE TOP OF THE | | WALL IS ALSO 130 FEET. PLEASE CORRECT THE ELEVATION. | | | | 8) A RIGHT-OF-WAY PERMIT IS REQUIRED FOR THE WORK | | WITHIN FLAGLER DRIVE, TUXEDO LANE AND COCOANUT LANE. | | | | 9) SEPARATE PERMITS, WITH PLANS, WILL BE REQUIRED FOR: | | | | A. LANDSCAPE | | B. AWNINGS AND CANOPIES | | C. SIGNS | | D. PARKING AND SIDEWALKS | | E. BICYCLE RACKS, BENCHES, FLAGPOLE, TRASH CANS AND | | OTHER SITE AMENITIES | | F. FENCES, WALLS AND GATES (TO INCLUDE THE SITE WALLS | | AND RETAINING WALLS) - PLEASE NOTE THAT STAFF IS | | UNCLEAR WHERE THE SPECIFIC WALLS AND FENCES WILL BE | | LOCATED BASED ON LACK OF DETAIL ON THE SITE PLANS. THE | | PLANS SHALL CLEARLY SHOW THE SETBACKS OF THE | | WALLS/FENCES TO VERIFY THAT THEY DO NOT EXCEED THE | | MAXIMUM HEIGHT. | | G. SITE LIGHTING | | H. THE PUBLIC ARE FIGURES ON TOP OF THE CANOPY. | | | | 10) PLEASE REMEMBER THAT DURING CONSTRUCTION THE | | FOLLOWING SITE SECURITY ITEMS SHALL BE IMPLEMENTED: | | | | I. THE APPLICANT, AFTER SITE CLEARING AND PLACEMENT OF | | CONSTRUCTION TRAILERS, SHALL INSTITUTE SECURITY | | MEASURES TO REDUCE OR ELIMINATE OPPORTUNITIES FOR | | THEFT. THE MANAGEMENT PLAN SHALL INCLUDE, BUT NOT BE | | LIMITED TO, TEMPORARY LIGHTING, SECURITY PERSONNEL, | | VEHICLE BARRIERS, CONSTRUCTION/VISITOR PASS, | | REDUCE/MINIMIZE ENTRY/EXIT POINTS, ENCOURAGE | | SUBCONTRACTORS TO SECURE MACHINERY AND TOOLS AT END OF | | WORK DAY, FENCING WITH SCREENING, AND/OR ANY OTHER | | MEASURE DEEMED APPROPRIATE TO PROVIDE A SAFE AND SECURE | | WORKING ENVIRONMENT. | | | | II. THE SECURITY MANAGEMENT PLAN SHALL BE MAINTAINED | | THROUGHOUT THE CONSTRUCTION PHASE OF THE PROJECT. | | NON-COMPLIANCE WITH THE APPROVED PLAN SHALL RESULT IN A | | STOP-WORK ORDER FOR THE ENTIRE PLANNED DEVELOPMENT. | | | | III. "NO TRESPASSING" SIGNS SHALL BE POSTED EVERY 500 | | FEET AROUND THE PERIMETER OF THE CONSTRUCTION SITE. | | | | 11) PRIOR TO C.O. FOR THE ACADEMIC BUILDING, ANY | | OFF-SITE SIGNAGE OR TRAFFIC CONTROL AIDES SHALL BE | | INSTALLED BY THE PBDA. | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446. | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
F |
Date |
2015-10-27 |
|
|
Cont ID |
|
Sent By |
ESchneid |
Date |
2015-10-27 |
Time |
14:54 |
Rev Time |
4.00 |
Received By |
eschneid |
Date |
2015-10-23 |
Time |
13:52 |
Sent To |
|
|
Notes |
2015-10-27 14:56:22 | FAILED | | | | 1) REPEAT COMMENT: PROVIDE VERIFICATION THAT THE | | DEVELOPMENT CONDITIONS FROM RESOLUTION NO. 144-11 | | LISTED BELOW HAVE BEEN SATISFIED: | | | | A. GRANT TO THE CITY A TEMPORARY ACCESS EASEMENT FOR | | USE OF TUXEDO AND COCONUT LANES UNTIL THE ROADS ARE | | RELOCATED; EXISTING UTILITIES UNTIL RELOCATED; AND | | EXISTING DRAINAGE UNTIL RELOCATED, IN FORM ACCEPTABLE | | TO THE CITY. THIS HAS NOT BEEN COMPLETED. | | | | B. GRANT TO THE CITY A DRAINAGE AND FLOWAGE EASEMENT | | FOR ALL ON-SITE DRAINAGE AND FLOWAGE THROUGH THE | | BIOSWALE [OR CURRENT ITERATION]. PBDA SHALL BE | | RESPONSIBLE FOR MAINTENANCE OF ALL ON-SITE DRAINAGE. | | THIS HAS NOT BEEN COMPLETED. | | | | E. RECORD A PLAT FOR THE ENTIRE PBDA CAMPUS. PRIOR TO | | RECORDATION, THE PLAT SHALL BE SUBMITTED FOR REVIEW | | THROUGH THE MINOR SUBDIVISION PROCESS TO INCLUDE ALL | | REQUIRED EASEMENTS. THE RELOCATION AND/OR ABANDONMENT | | OF EASEMENTS WILL REQUIRE APPLICATIONS TO BE FILED WITH | | THE ENGINEERING SERVICES DIVISION. THIS HAS NOT BEEN | | COMPLETED. | | | | H. THE PBDA SHALL PROVIDE A TEMPORARY ACCESS, UTILITY | | AND DRAINAGE EASEMENT, APPROVED BY THE ENGINEERING | | SERVICES DEPARTMENT, IN FAVOR OF THE CITY AT THE TIME | | OF THE RECORDATION OF THE PBDA PLAT. THIS HAS NOT BEEN | | COMPLETED. | | | | 2) REPEAT COMMENT: PROVIDE VERIFICATION THAT THE | | FOLLOWING CONDITIONS OUTLINED IN RESOLUTION NO. 341-10 | | HAVE BEEN MET: | | | | A. PALM BEACH DAY ACADEMY SHALL RECORD A PLAT FOR THE | | ENTIRE CAMPUS. PRIOR TO RECORDATION, THE PALM BEACH DAY | | ACADEMY SHALL MAKE APPLICATION TO THE PLANNING AND | | ZONING DEPARTMENT FOR THE REVIEW OF THE PLAT THROUGH | | THE MINOR SUBDIVISION PROCESS WITH FINAL PLAT APPROVAL | | THROUGH AN APPLICATION SUBMITTED TO THE CITY'S | | ENGINEERING SERVICES DEPARTMENT. ALL REQUIRED EASEMENTS | | SHALL BE PROVIDED EITHER BY PLAT OR SEPARATE | | INSTRUMENT, IN A FORM ACCEPTABLE TO THE CITY. THIS HAS | | NOT BEEN COMPLETED. | | | | B. IN THE EVENT THE UTILITIES ARE RELOCATED TO ANOTHER | | AREA OF THE PALM BEACH DAY ACADEMY CAMPUS, THE PALM | | BEACH DAY ACADEMY SHALL GRANT TO THE CITY A UTILITY | | EASEMENT OVER, UNDER AND THROUGH SUCH AREA OF THE | | CAMPUS. THIS HAS NOT BEEN COMPLETED. | | | | C. PALM BEACH DAY ACADEMY SHALL SUBMIT AN APPLICATION | | TO THE ENGINEERING SERVICES DEPARTMENT FOR THE | | REALIGNMENT OF THE TUXEDO AND COCOANUT LANES AND THE | | RELOCATION OF ANY CITY UTILITIES. AFTER THE ENGINEERING | | SERVICES DEPARTMENT APPROVAL, THE PALM BEACH DAY | | ACADEMY SHALL, AT ITS OWN COST AND EXPENSE, REALIGN THE | | INTERSECTION OF TUXEDO AND COCOANUT LANES AND RELOCATE | | ANY AND ALL UTILITY LINES LOCATED WITHIN THE ABANDONED | | RIGHT-OF-WAY. THE PALM BEACH DAY ACADEMY SHALL POST A | | BOND TO THE CITY IN THE AGREED AMOUNT OF THE ESTIMATED | | COSTS ASSOCIATED WITH THE RELOCATION OF THE ROADWAY AND | | THE UTILITY LINES PRIOR TO THE RECORDATION OF THE PALM | | BEACH DAY ACADEMY PLAT. THIS HAS NOT BEEN COMPLETED. | | | | D. PALM BEACH DAY ACADEMY SHALL PROVIDE TO THE CITY A | | TEMPORARY ACCESS EASEMENT, AND TEMPORARY UTILITIES AND | | DRAINAGE EASEMENTS OVER AND ACROSS THE ABANDONED | | RIGHT-OF-WAY, IN FORM APPROVED BY THE OFFICE OF THE | | CITY ATTORNEY, AT THE TIME OF THE RECORDATION OF THE | | PALM BEACH DAY ACADEMY PLAT. THIS HAS NOT BEEN | | COMPLETED. | | | | E. PALM BEACH DAY ACADEMY SHALL TENDER AND DELIVER | | $11,000 TO THE CITY AS COMPENSATION FOR THE VALUE OF | | THE RIGHT-OF-WAY AND ASSOCIATED DEVELOPMENT RIGHTS. | | THIS HAS NOT BEEN COMPLETED. | | | | 3) REPEAT COMMENT: PROVIDE VERIFICATION THAT THE | | FOLLOWING CONDITIONS OUTLINED IN RESOLUTION NO. 342-10 | | HAVE BEEN MET: | | | | A. PALM BEACH DAY ACADEMY SHALL RECORD A PLAT FOR THE | | ENTIRE CAMPUS. PRIOR TO RECORDATION, THE PALM BEACH DAY | | ACADEMY SHALL MAKE APPLICATION TO THE PLANNING AND | | ZONING DEPARTMENT FOR THE REVIEW OF THE PLAT THROUGH | | THE MINOR SUBDIVISION PROCESS WITH FINAL PLAT APPROVAL | | THROUGH AN APPLICATION SUBMITTED TO THE CITY'S | | ENGINEERING SERVICES DEPARTMENT. ALL REQUIRED EASEMENTS | | SHALL BE PROVIDED EITHER BY PLAT OR SEPARATE | | INSTRUMENT, IN A FORM ACCEPTABLE TO THE CITY. THIS HAS | | NOT BEEN COMPLETED. | | | | B. PALM BEACH DAY ACADEMY SHALL SUBMIT AN APPLICATION | | TO THE ENGINEERING SERVICES DEPARTMENT FOR THE | | REALIGNMENT OF THE TUXEDO AND COCOANUT LANES AND THE | | RELOCATION OF ANY CITY UTILITIES. AFTER THE ENGINEERING | | SERVICES DEPARTMENT APPROVAL, THE PALM BEACH DAY | | ACADEMY SHALL, AT ITS OWN COST AND EXPENSE, REALIGN THE | | INTERSECTION OF TUXEDO AND COCOANUT LANES AND RELOCATE | | ANY AND ALL UTILITY LINES LOCATED WITHIN THE ABANDONED | | RIGHT-OF-WAY. THE PALM BEACH DAY ACADEMY SHALL POST A | | BOND TO THE CITY IN THE AGREED AMOUNT OF THE ESTIMATED | | COSTS ASSOCIATED WITH THE RELOCATION OF THE ROADWAY AND | | THE UTILITY LINES PRIOR TO THE RECORDATION OF THE PALM | | BEACH DAY ACADEMY PLAT. THIS HAS NOT BEEN COMPLETED. | | | | C. IN THE EVENT THE UTILITIES ARE RELOCATED TO ANOTHER | | AREA OF THE PALM BEACH DAY ACADEMY CAMPUS, THE PALM | | BEACH DAY ACADEMY SHALL GRANT TO THE CITY A UTILITY | | EASEMENT OVER, UNDER AND THROUGH SUCH AREA OF THE | | CAMPUS. THIS HAS NOT BEEN COMPLETED. | | | | D. PALM BEACH DAY ACADEMY SHALL PROVIDE TO THE CITY | | TEMPORARY UTILITIES AND DRAINAGE EASEMENTS OVER AND | | ACROSS THE ABANDONED RIGHT-OF-WAY, IN FORM APPROVED BY | | THE CITY ATTORNEY'S OFFICE, AT THE TIME OF THE | | RECORDATION OF THE PALM BEACH DAY ACADEMY PLAT. THIS | | HAS NOT BEEN COMPLETED. | | | | E. PALM BEACH DAY ACADEMY SHALL TENDER AND DELIVER | | $24,000 TO THE CITY AS COMPENSATION FOR THE VALUE OF | | THE RIGHT-OF-WAY AND ASSOCIATED DEVELOPMENT RIGHTS. | | THIS HAS NOT BEEN COMPLETED. | | | | 4) NEW COMMENT: THE SURVEY INCLUDED WITH THE PERMIT | | APPLICATION IS FROM 2010 AND DOES NOT REFLECT THE | | CURRENT CONDITIONS, ESPECIALLY ON THE WESTERN HALF OF | | THE SITE. AN ACCURATE RECENT SURVEY IS REQUIRED. | | | | 5) NEW COMMENT: PLEASE REMEMBER THAT THE SITE REQUIRES | | A MINIMUM OF 61 PARKING SPACES BOTH IN THE INTERIM AND | | FINAL LAYOUT. | | | | 6) NEW COMMENT: THE BASE SITE DRAWINGS FOR THE SITE DO | | NOT MATCH THE PLANS SUBMITTED AS PART OF THE MINOR SITE | | PLAN AMENDMENT. THE ZONING STAFF WILL NOT APPROVE THIS | | PERMIT UNTIL THE SITE AND LANDSCAPE PLANS ARE APPROVED. | | THE PERMIT DRAWINGS SHALL REFLECT THE APPROVED | | CONDITIONS. | | | | 7) NEW COMMENT: ON SHEET A3.1, THE FINISHED FLOOR | | ELEVATION TAG FOR THE ACADEMIC BUILDING'S SOUTH | | ELEVATION IS SHOWN ALMOST THREE (3) FEET ABOVE THE | | GRADE. | | | | 8) NEW COMMENT: ON SHEETS A3.1 AND SHEET A4.1, THE | | MECHANICAL SCREEN WALL ELEVATION IS SHOWN AT 130 FEET, | | YET THE TOP OF THE WALL IS ALSO 130 FEET. PLEASE | | CORRECT THE ELEVATIONS. | | | | 9) NEW COMMENT: THE ORIGINAL, COMMUNITY ENDORSED | | ELEVATIONS INCLUDED A TILE VENEER AND HORIZONTAL SUN | | CONTROL AND LOUVER ELEMENTS ON THE WINDOWS. THE LOUVERS | | MIMICKED THOSE ON THE EXISTING ACADEMIC BUILDING, TYING | | THEM TOGETHER AS WELL AS PROVIDING SOME RELATIONSHIP TO | | THE ROOFTOP MECHANICAL SCREEN WALL. THESE ELEMENTS NEED | | TO BE REPLACED, OR THE PROJECT NEEDS TO BE RE-PRESENTED | | TO THE NEIGHBORHOOD IN ACCORDANCE WITH RES. NO. 144-11. | | | | 10) A RIGHT-OF-WAY PERMIT IS REQUIRED FOR THE WORK | | WITHIN FLAGLER DRIVE, TUXEDO LANE AND COCOANUT LANE. | | | | 11) SEPARATE PERMITS, WITH PLANS, WILL BE REQUIRED FOR: | | | | A. LANDSCAPE | | B. AWNINGS AND CANOPIES | | C. SIGNS | | D. PARKING AND SIDEWALKS | | E. BICYCLE RACKS, BENCHES, FLAGPOLE, TRASH CANS AND | | OTHER SITE AMENITIES | | F. FENCES, WALLS AND GATES ? PLEASE NOTE THAT STAFF IS | | UNCLEAR WHERE THE SPECIFIC WALLS AND FENCES WILL BE | | LOCATED BASED ON LACK OF DETAIL ON THE SITE PLANS. THE | | PLANS SHALL CLEARLY SHOW THE SETBACKS OF THE | | WALLS/FENCES TO VERIFY THAT THEY DO NOT EXCEED THE | | MAXIMUM HEIGHT. | | G. SITE LIGHTING | | | | 12) PLEASE REMEMBER THAT DURING CONSTRUCTION THE | | FOLLOWING SITE SECURITY ITEMS SHALL BE IMPLEMENTED: | | | | I. THE APPLICANT, AFTER SITE CLEARING AND PLACEMENT OF | | CONSTRUCTION TRAILERS, SHALL INSTITUTE SECURITY | | MEASURES TO REDUCE OR ELIMINATE OPPORTUNITIES FOR | | THEFT. THE MANAGEMENT PLAN SHALL INCLUDE, BUT NOT BE | | LIMITED TO, TEMPORARY LIGHTING, SECURITY PERSONNEL, | | VEHICLE BARRIERS, CONSTRUCTION/VISITOR PASS, | | REDUCE/MINIMIZE ENTRY/EXIT POINTS, ENCOURAGE | | SUBCONTRACTORS TO SECURE MACHINERY AND TOOLS AT END OF | | WORK DAY, FENCING WITH SCREENING, AND/OR ANY OTHER | | MEASURE DEEMED APPROPRIATE TO PROVIDE A SAFE AND SECURE | | WORKING ENVIRONMENT. | | | | II. THE SECURITY MANAGEMENT PLAN SHALL BE MAINTAINED | | THROUGHOUT THE CONSTRUCTION PHASE OF THE PROJECT. | | NON-COMPLIANCE WITH THE APPROVED PLAN SHALL RESULT IN A | | STOP-WORK ORDER FOR THE ENTIRE PLANNED DEVELOPMENT. | | | | III. "NO TRESPASSING" SIGNS SHALL BE POSTED EVERY 500 | | FEET AROUND THE PERIMETER OF THE CONSTRUCTION SITE. | | | | 13) PRIOR TO C.O. FOR THE ACADEMIC BUILDING, ANY | | OFF-SITE SIGNAGE OR TRAFFIC CONTROL AIDES SHALL BE | | INSTALLED BY THE PBDA. | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446. | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2015-04-06 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2015-04-06 |
Time |
17:01 |
Rev Time |
4.00 |
Received By |
eschneid |
Date |
2015-04-03 |
Time |
11:20 |
Sent To |
|
|
Notes |
2015-04-06 17:05:58 | FAILED | | | | 1) THE PALM BEACH DAY ACADEMY COMMUNITY SERVICE PLANNED | | DEVELOPMENT IS GOVERNED BY DEVELOPMENT REGULATIONS | | STATED IN RESOLUTION NO. 144-11. THE ABANDONMENT AND | | REDEDICATION OF THE INTERSECTION OF TUXEDO AND COCOANUT | | LANES AND THE ABANDONMENT OF A PORTION OF ORANGE COURT | | ARE GOVERNED BY RESOLUTION NOS. 341-10 AND 342-10, | | RESPECTIVELY. | | | | 2) PROVIDE VERIFICATION THAT THE DEVELOPMENT CONDITIONS | | FROM RESOLUTION NO. 144-11 LISTED BELOW HAVE BEEN | | SATISFIED: | | | | A. GRANT TO THE CITY A TEMPORARY ACCESS EASEMENT FOR | | USE OF TUXEDO AND COCONUT LANES UNTIL THE ROADS ARE | | RELOCATED; EXISTING UTILITIES UNTIL RELOCATED; AND | | EXISTING DRAINAGE UNTIL RELOCATED, IN FORM ACCEPTABLE | | TO THE CITY. | | | | B. GRANT TO THE CITY A DRAINAGE AND FLOWAGE EASEMENT | | FOR ALL ON-SITE DRAINAGE AND FLOWAGE THROUGH THE | | BIOSWALE [OR CURRENT ITERATION]. PBDA SHALL BE | | RESPONSIBLE FOR MAINTENANCE OF ALL ON-SITE DRAINAGE. | | | | C. PROVIDE THE PLANNING DIVISION WITH A TRAFFIC CONTROL | | PLAN, APPROVED BY THE CITY'S TRAFFIC ENGINEER, WHICH | | INCLUDES THE LOCATIONS OF THE TRAFFIC DIRECTING | | PERSONNEL AND A WRITTEN NARRATIVE HOW THE TRAFFIC | | CONTROL OPERATIONS WILL FUNCTION FOR THE PICK-UP AND | | DROP-OFF TIMES. THE COST TO CONSTRUCT, INSTALL AND | | MAINTAIN ANY OFF-SITE SIGNAGE OR TRAFFIC CONTROL AIDES | | SHALL BE BORNE BY THE PBDA. | | | | D. PREPARE A CONSTRUCTION SITE SECURITY AND MANAGEMENT | | PLAN FOR APPROVAL BY THE CITY'S POLICE DEPARTMENT CRIME | | PREVENTION THROUGH ENVIRONMENTAL DESIGN (CPTED) | | OFFICIAL. | | | | I. THE APPLICANT, AFTER SITE CLEARING AND PLACEMENT OF | | CONSTRUCTION TRAILERS, SHALL INSTITUTE SECURITY | | MEASURES TO REDUCE OR ELIMINATE OPPORTUNITIES FOR | | THEFT. THE MANAGEMENT PLAN SHALL INCLUDE, BUT NOT BE | | LIMITED TO, TEMPORARY LIGHTING, SECURITY PERSONNEL, | | VEHICLE BARRIERS, CONSTRUCTION/VISITOR PASS, | | REDUCE/MINIMIZE ENTRY/EXIT POINTS, ENCOURAGE | | SUBCONTRACTORS TO SECURE MACHINERY AND TOOLS AT END OF | | WORK DAY, FENCING WITH SCREENING, AND/OR ANY OTHER | | MEASURE DEEMED APPROPRIATE TO PROVIDE A SAFE AND SECURE | | WORKING ENVIRONMENT. | | | | II. THE SECURITY MANAGEMENT PLAN SHALL BE MAINTAINED | | THROUGHOUT THE CONSTRUCTION PHASE OF THE PROJECT. | | NON-COMPLIANCE WITH THE APPROVED PLAN SHALL RESULT IN A | | STOP-WORK ORDER FOR THE ENTIRE PLANNED DEVELOPMENT. | | | | III. "NO TRESPASSING" SIGNS SHALL BE POSTED EVERY 500 | | FEET AROUND THE PERIMETER OF THE CONSTRUCTION SITE. | | | | E. RECORD A PLAT FOR THE ENTIRE PBDA CAMPUS. PRIOR TO | | RECORDATION, THE PLAT SHALL BE SUBMITTED FOR REVIEW | | THROUGH THE MINOR SUBDIVISION PROCESS TO INCLUDE ALL | | REQUIRED EASEMENTS. THE RELOCATION AND/OR ABANDONMENT | | OF EASEMENTS WILL REQUIRE APPLICATIONS TO BE FILED WITH | | THE ENGINEERING SERVICES DIVISION. | | | | F. SUBMIT COMPREHENSIVE EMERGENCY PLANS TO THE FIRE | | DEPARTMENT FOR THEIR APPROVAL. | | | | G. SUBMIT TO THE ENGINEERING SERVICES DIVISION SIGNED | | AND SEALED ENGINEERING CALCULATIONS TO DEMONSTRATE THAT | | WATER QUALITY IS BEING MAINTAINED FOR THE SITE AND THAT | | POST DEVELOPMENT OFF-SITE DISCHARGE DOES NOT EXCEED THE | | PREDEVELOPMENT OFF-SITE DISCHARGE. | | | | H. THE PBDA SHALL PROVIDE A TEMPORARY ACCESS, UTILITY | | AND DRAINAGE EASEMENT, APPROVED BY THE ENGINEERING | | SERVICES DEPARTMENT, IN FAVOR OF THE CITY AT THE TIME | | OF THE RECORDATION OF THE PBDA PLAT. | | | | 3) IN ACCORDANCE WITH THE TPS APPROVAL LETTER FOR THE | | PALM BEACH DAY ACADEMY CSPD, NO BUILDING PERMIT FOR NEW | | DEVELOPMENT WITHIN THE PALM BEACH DAY ACADEMY CSPD WILL | | BE ISSUED AFTER THE BUILD-OUT DATE OF DECEMBER 31, | | 2014, UNLESS THE PALM BEACH COUNTY TRAFFIC DIVISION | | ISSUES AN AMENDED TRAFFIC CONCURRENCY LETTER WITH A NEW | | BUILD-OUT DATE. IN THE EVENT THAT THE PALM BEACH COUNTY | | TRAFFIC DIVISION ISSUES A REVISED TRAFFIC CONCURRENCY | | LETTER, THEN THE BUILD-OUT DATE IN THIS CONDITION SHALL | | BE AMENDED THROUGH THE MINOR AMENDMENT PROCESS. | | | | 4) PROVIDE VERIFICATION THAT THE FOLLOWING CONDITIONS | | OUTLINED IN RESOLUTION NO. 341-10 HAVE BEEN MET: | | | | A. PALM BEACH DAY ACADEMY SHALL RECORD A PLAT FOR THE | | ENTIRE CAMPUS. PRIOR TO RECORDATION, THE PALM BEACH DAY | | ACADEMY SHALL MAKE APPLICATION TO THE PLANNING AND | | ZONING DEPARTMENT FOR THE REVIEW OF THE PLAT THROUGH | | THE MINOR SUBDIVISION PROCESS WITH FINAL PLAT APPROVAL | | THROUGH AN APPLICATION SUBMITTED TO THE CITY'S | | ENGINEERING SERVICES DEPARTMENT. ALL REQUIRED EASEMENTS | | SHALL BE PROVIDED EITHER BY PLAT OR SEPARATE | | INSTRUMENT, IN A FORM ACCEPTABLE TO THE CITY. | | | | B. IN THE EVENT THE UTILITIES ARE RELOCATED TO ANOTHER | | AREA OF THE PALM BEACH DAY ACADEMY CAMPUS, THE PALM | | BEACH DAY ACADEMY SHALL GRANT TO THE CITY A UTILITY | | EASEMENT OVER, UNDER AND THROUGH SUCH AREA OF THE | | CAMPUS. | | | | C. PALM BEACH DAY ACADEMY SHALL SUBMIT AN APPLICATION | | TO THE ENGINEERING SERVICES DEPARTMENT FOR THE | | REALIGNMENT OF THE TUXEDO AND COCOANUT LANES AND THE | | RELOCATION OF ANY CITY UTILITIES. AFTER THE ENGINEERING | | SERVICES DEPARTMENT APPROVAL, THE PALM BEACH DAY | | ACADEMY SHALL, AT ITS OWN COST AND EXPENSE, REALIGN THE | | INTERSECTION OF TUXEDO AND COCOANUT LANES AND RELOCATE | | ANY AND ALL UTILITY LINES LOCATED WITHIN THE ABANDONED | | RIGHT-OF-WAY. THE PALM BEACH DAY ACADEMY SHALL POST A | | BOND TO THE CITY IN THE AGREED AMOUNT OF THE ESTIMATED | | COSTS ASSOCIATED WITH THE RELOCATION OF THE ROADWAY AND | | THE UTILITY LINES PRIOR TO THE RECORDATION OF THE PALM | | BEACH DAY ACADEMY PLAT. | | | | D. PALM BEACH DAY ACADEMY SHALL PROVIDE TO THE CITY A | | TEMPORARY ACCESS EASEMENT, AND TEMPORARY UTILITIES AND | | DRAINAGE EASEMENTS OVER AND ACROSS THE ABANDONED | | RIGHT-OF-WAY, IN FORM APPROVED BY THE OFFICE OF THE | | CITY ATTORNEY, AT THE TIME OF THE RECORDATION OF THE | | PALM BEACH DAY ACADEMY PLAT. | | | | E. PALM BEACH DAY ACADEMY SHALL TENDER AND DELIVER | | $11,000 TO THE CITY AS COMPENSATION FOR THE VALUE OF | | THE RIGHT-OF-WAY AND ASSOCIATED DEVELOPMENT RIGHTS. | | | | 5) PROVIDE VERIFICATION THAT THE FOLLOWING CONDITIONS | | OUTLINED IN RESOLUTION NO. 342-10 HAVE BEEN MET: | | | | A. PALM BEACH DAY ACADEMY SHALL RECORD A PLAT FOR THE | | ENTIRE CAMPUS. PRIOR TO RECORDATION, THE PALM BEACH DAY | | ACADEMY SHALL MAKE APPLICATION TO THE PLANNING AND | | ZONING DEPARTMENT FOR THE REVIEW OF THE PLAT THROUGH | | THE MINOR SUBDIVISION PROCESS WITH FINAL PLAT APPROVAL | | THROUGH AN APPLICATION SUBMITTED TO THE CITY'S | | ENGINEERING SERVICES DEPARTMENT. ALL REQUIRED EASEMENTS | | SHALL BE PROVIDED EITHER BY PLAT OR SEPARATE | | INSTRUMENT, IN A FORM ACCEPTABLE TO THE CITY. | | | | B. PALM BEACH DAY ACADEMY SHALL SUBMIT AN APPLICATION | | TO THE ENGINEERING SERVICES DEPARTMENT FOR THE | | REALIGNMENT OF THE TUXEDO AND COCOANUT LANES AND THE | | RELOCATION OF ANY CITY UTILITIES. AFTER THE ENGINEERING | | SERVICES DEPARTMENT APPROVAL, THE PALM BEACH DAY | | ACADEMY SHALL, AT ITS OWN COST AND EXPENSE, REALIGN THE | | INTERSECTION OF TUXEDO AND COCOANUT LANES AND RELOCATE | | ANY AND ALL UTILITY LINES LOCATED WITHIN THE ABANDONED | | RIGHT-OF-WAY. THE PALM BEACH DAY ACADEMY SHALL POST A | | BOND TO THE CITY IN THE AGREED AMOUNT OF THE ESTIMATED | | COSTS ASSOCIATED WITH THE RELOCATION OF THE ROADWAY AND | | THE UTILITY LINES PRIOR TO THE RECORDATION OF THE PALM | | BEACH DAY ACADEMY PLAT. | | | | C. IN THE EVENT THE UTILITIES ARE RELOCATED TO ANOTHER | | AREA OF THE PALM BEACH DAY ACADEMY CAMPUS, THE PALM | | BEACH DAY ACADEMY SHALL GRANT TO THE CITY A UTILITY | | EASEMENT OVER, UNDER AND THROUGH SUCH AREA OF THE | | CAMPUS. | | | | D. PALM BEACH DAY ACADEMY SHALL PROVIDE TO THE CITY | | TEMPORARY UTILITIES AND DRAINAGE EASEMENTS OVER AND | | ACROSS THE ABANDONED RIGHT-OF-WAY, IN FORM APPROVED BY | | THE CITY ATTORNEY'S OFFICE, AT THE TIME OF THE | | RECORDATION OF THE PALM BEACH DAY ACADEMY PLAT. | | | | E. PALM BEACH DAY ACADEMY SHALL TENDER AND DELIVER | | $24,000 TO THE CITY AS COMPENSATION FOR THE VALUE OF | | THE RIGHT-OF-WAY AND ASSOCIATED DEVELOPMENT RIGHTS. | | | | 6) ZONING STAFF UNDERSTANDS THAT THERE WILL BE CHANGES | | TO THE BUILDING AND SITE SUBMITTED IN THE NEAR FUTURE. | | IN LIGHT OF THE CONDITIONS LISTED ABOVE THAT HAVE NOT | | BEEN ADDRESSED, ZONING STAFF WILL NOT REVIEW THE | | SUBMITTED BUILDING PLANS UNTIL THE AMENDMENT HAS BEEN | | REVIEWED AND APPROVED. | | | | 7) A RIGHT-OF-WAY PERMIT IS REQUIRED FOR THE WORK | | WITHIN FLAGLER DRIVE, TUXEDO LANE AND COCOANUT LANE. | | | | 8) SEPARATE PERMITS, WITH PLANS, WILL BE REQUIRED FOR: | | | | A. LANDSCAPE | | B. AWNINGS AND CANOPIES | | C. SIGNS | | D. PARKING AND SIDEWALKS | | E. BICYCLE RACKS, BENCHES, TRASH CANS AND OTHER SITE | | AMENITIES | | F. FENCES, WALLS AND GATES | | G. SITE LIGHTING | | | | 9) THIS BUILDING IS SUBJECT TO THE ARTS IN PUBLIC | | PLACES REQUIREMENTS. | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446. | | | 2015-03-10 13:48:38 | 3/10/15 |
|
|
|