Plan Review Details - Permit 15020798
Plan Review Stops For Permit 15020798
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2015-05-13 Cont ID  
Sent By aclange Date 2015-05-13 Time 17:29 Rev Time 0.00
Received By aclange Date 2015-05-13 Time 17:29 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2015-03-14 Cont ID  
Sent By misc2 Date 2015-03-14 Time 15:05 Rev Time 0.00
Received By shill Date 2015-03-14 Time 15:05 Sent To FIRE
Notes
2015-03-14 15:27:32****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. THE APPLICATION IS FOR 3201 ELECTRONICS WAY, PLANS
 ARE FOR 109 RUSSELL DR. PLEASE CORRELATE, FBC 107.
  
 2. SHEET A1 IS NOT CLEAR AS TO LOCATION AND SCOPE OF
 WORK PROPOSED. IT APPEARS THAT ENGINEER USED A ROOF
 PLAN PREPARED BY OTHERS AND ADDED INFORMATION. ELMINATE
 INFORMATION WHICH IS NOT APPLICABLE TO THIS JOB, CREATE
 A LEGEND AND CLEARLY SHOW LOCATION OF PROPOSED LADDERS
 AND GUARDS, FBC 107. CLOUDED INFORMATION APPEARS TO BE
 UNRELATED TO THIS JOB.
  
 3. SPECIFY LOADS, FBC 1607.7, FBC TABLE 1607.1, FBC
 1509.6.
  
 4. SHOW COMPLIANCE WITH THE REQUIREMENTS OF FBC 1509.6.
 PROVIDE ADDITIONAL DETAILS AS NECESSARY.
  
 5. PROVIDE A STRUCTURAL DETAIL FOR CONSTRUCTION OF THE
 GUARDS, LADDERS, WALKWAY, FBC 107. FOR INSTANCE, NO
 INFORMATION PROVIDED REGARDING HOW THE RAILING IS
 CONTRUCTED, ONLY THE MATERIAL SPECIFIED. CONNECTORS?
 WELDS? "EASTERN METAL SUPPLY GANGWAY DECK" SPECIFIED,
 NO INFORMATION PROVIDED FOR THIS PRODUCT, OR FOR THE
 "EASTERN METAL LADDER RUNG". DO THESE ITEMS HAVE A
 PRODUCT APPROVAL? ENGINEERING?
  
 6. WHAT IS 3/8" W.A.B.? PROVIDE A LEGEND OR SPELL OUT
 STRUCTURAL ABBREVIATIONS (ELEVATION VIEW, OTHER PLACES,
 SHEET S1).
  
  
  
  
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2015-05-06 Cont ID  
Sent By pleduc Date 2015-05-06 Time   Rev Time 0.00
Received By pleduc Date 2015-05-06 Time 16:56 Sent To B
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By pleduc Date 2015-03-17 Time 12:14 Sent To PC
Notes
2015-03-17 13:06:15THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 A LIFE SAFETY PLAN WAS NOT SUBMITTED AND IS REQUIRED TO
 INCLUDE, PATH OF TRAVEL, EXIT SIGNAGE, LIGHTING, ETC
  
 THE CONSTRUCTION/INSTALLATION OF THE LADDERS AND BRIDGE
 SHALL COMPLY WITH THE REQUIREMENTS OF NFPA 101, CHAPTER
 7, 7.2.9.
  
 THERE IS NO INDICATION OF A STEP-DOWN (OR STEP-UP)
 DIMENSION AT THE BRIDGE CONNECTING TO THE BUILDING.
 BASED ON THE HEIGHT OF THE STEPS ADDITIONAL STEPS MAY
 BE NEEDED.
  
 THE ENDS OF THE HAND RAIL ON THE BRIDGE SHALL EXTEND
 PASSED THE END OF THE WALKWAY CONSISTANT WITH THE
 REQUIREMENTS OF 7.2.2.4 FOR ANY STEP DOWN (UP) OR
 APPROACH TO THE EDGE OF THE BUILDING.
  
 THERE IS NO DIMENSION INDICATED OF THE HEIGHT OF THE
 LAST LADDER RUNG TO THE GROUND.
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-05-14 Cont ID  
Sent By cpuell Date 2015-05-14 Time 13:14 Rev Time 0.00
Received By cpuell Date 2015-05-05 Time 09:25 Sent To  
Notes
2015-05-06 09:25:41RE-SUBMITTAL SENT TO FIRE SHELF FOR REVIEW. JG.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By dhayes Date 2015-02-25 Time 12:16 Sent To Z
Notes
2015-03-14 15:28:003/14 TO FIRE
  
  

Review Stop Z ZONING
Rev No 1 Status N Date   Cont ID  
Sent By misc2 Date   Time   Rev Time  
Received By   Date   Time   Sent To B
Notes
***NONE***