Plan Review Details - Permit 15020671
Plan Review Stops For Permit 15020671
Review Stop E ELECTRICAL
Rev No 1 Status P Date 2015-02-24 Cont ID  
Sent By rlecky Date 2015-02-24 Time 13:47 Rev Time 0.00
Received By rlecky Date 2015-02-24 Time 13:30 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2015-03-18 Cont ID  
Sent By pleduc Date 2015-03-18 Time   Rev Time 0.00
Received By pleduc Date 2015-03-18 Time 13:46 Sent To P
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2015-03-05 Cont ID  
Sent By pleduc Date 2015-03-05 Time   Rev Time 0.00
Received By pleduc Date 2015-03-04 Time 15:23 Sent To  
Notes
2015-03-05 11:06:58THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 FIRE PREVENTION SHARES THE SAME COMMENTS AS PLUMBING.
  
 THE INSTALLATION SHALL COMPLY WITH THE REQUIREMENTS OF
 NFPA 54, NATIONAL FUEL CODE.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-03-21 Cont ID  
Sent By tklarge Date 2015-03-21 Time 06:20 Rev Time 0.00
Received By tklarge Date 2015-03-13 Time   Sent To  
Notes
2015-03-13 18:33:37B25

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-03-11 Cont ID  
Sent By hmoser Date 2015-03-11 Time 09:45 Rev Time 0.00
Received By hmoser Date 2015-02-19 Time 18:30 Sent To  
Notes
2015-02-19 18:31:31REVISION SENT TO B25 BIN FOR REVIEW. JG.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2015-03-11 Cont ID  
Sent By hmoser Date 2015-03-11 Time 09:45 Rev Time 0.00
Received By hmoser Date 2015-03-11 Time 09:20 Sent To  
Notes
2015-03-11 09:45:39 
  

Review Stop P PLUMBING
Rev No 3 Status P Date 2015-03-24 Cont ID  
Sent By tklarge Date 2015-03-24 Time 13:51 Rev Time 0.00
Received By tklarge Date 2015-03-24 Time 13:50 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2015-03-21 Cont ID  
Sent By tklarge Date 2015-03-21 Time 06:19 Rev Time 0.00
Received By tklarge Date 2015-03-21 Time 05:52 Sent To  
Notes
2015-03-21 06:19:451) INDICATE ON THE PLAN THE TYPE OF PIPE BEING
 INSTALLED FOR THE GAS SYSTEM. THE RESPONSE FROM THE
 ENGINEER REFERS TO PLUMBING SHT. P0.2 BUT THERE IS NO
 SUCH DRAWING IN THE SET OF SUBMITTED PLANS. CLARIFY.
 2) INDICATE THE DELIVERY PRESSURE OF THE GAS PER THE
 2010 FBC FUEL GAS CODE SEC.402.2. THE RESPONSE FROM THE
 ENGINEER REFERS TO PLUMBING SHT. P0.2 BUT THERE IS NO
 SUCH DRAWING IN THE SET OF SUBMITTED PLANS. CLARIFY.
 3) SUBMIT REFERENCED DRAWING P0.2 FOR REVIEW.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2015-02-24 Cont ID  
Sent By tklarge Date 2015-02-23 Time 12:18 Rev Time 0.00
Received By tklarge Date 2015-02-23 Time 12:18 Sent To  
Notes
2015-02-24 12:17:39FEB.23, 2015
 REVISION # 15020671 GAS REVISION
 MASTER PERMIT # 14070406
 1)SUBMIT MANUFACTURER?S SPECIFICATIONS /INSTALLATION
 MANUAL FOR ALL NEW AND/OR ADDITIONAL GAS EQUIPMENT
 BEING INSTALLED. WPB AMEND. TO 2010 FBC
 SEC.107.2.1.EQUIPMENT SHALL BE LISTED AND LABELED PER
 THE 2010 FBC FUEL GAS CODE SEC.301.3.
 2) INDICATE ON THE PLAN THE TYPE OF PIPE BEING
 INSTALLED. WPB AMEND. TO 2010 FBC SEC.107.2.1.
 3 ) INDICATE THE BTU LOAD OF EACH PIECE OF GAS
 EQUIPMENT AND THE TOTAL BTU LOAD ON THE SYSTEM.
 4) SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE 2010
 FBC FUEL GAS CODE SEC.304.
 5) INDICATE THE DELIVERY PRESSURE OF THE GAS PER THE
 2010 FUEL GAS CODE SEC.402.2.
 6) SUBMIT A DETAIL SHOWING THE TYPE, SIZE AND
 TERMINATION LOCATIONS OF ALL GAS VENTS PER THE 2010 FBC
 FUEL GAS CODE SECS.502 THROUGH 505.
  
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  
  