Plan Review Details - Permit 15020353
Plan Review Stops For Permit 15020353
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2015-08-02 Cont ID  
Sent By skennedy Date 2015-08-02 Time 10:11 Rev Time 0.00
Received By skennedy Date 2015-08-02 Time 10:11 Sent To NFIP
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status N Date 2015-02-26 Cont ID  
Sent By skennedy Date 2015-02-26 Time   Rev Time  
Received By jwitmer Date 2015-02-26 Time   Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2015-02-17 Cont ID  
Sent By skennedy Date 2015-02-17 Time 12:50 Rev Time 0.00
Received By rlecky Date 2015-02-17 Time 12:48 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status P Date 2015-07-29 Cont ID  
Sent By tklarge Date 2015-07-29 Time 12:30 Rev Time 0.00
Received By tklarge Date 2015-07-29 Time 10:19 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2015-02-28 Cont ID  
Sent By skennedy Date 2015-02-28 Time 09:13 Rev Time 0.00
Received By tklarge Date 2015-02-28 Time 08:42 Sent To  
Notes
2015-02-28 08:58:201) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS &
 INSTASLLATION MANUALS FOR ALL GAS EQUIPMENT. EQUIPMENT
 SHALL BE LISTED AND LABELED PER THE 2010 FUEL GAS CODE
 SEC. 301.3, 2010 FBCR SEC.G2404.3.
 2) SHT. P-2 SHOWS PE GAS PIPE INSTALLED WITHIN THE
 STRUCTURE. PLASTIC PIPE SHALL BE INSTALLED OUTDOORS
 UNDERGROUND ONLY.PLASTIC PIPE SHALL NOT BE USED WITHIN
 OR UNDER ANY BUILDING OR SLAB PER THE 2010 FGC
 SEC.404.15.1.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-08-05 Cont ID  
Sent By shill Date 2015-08-05 Time 11:16 Rev Time 0.00
Received By shill Date 2015-07-27 Time 14:04 Sent To  
Notes
2015-07-28 14:04:59TLARGE DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-02-28 Cont ID  
Sent By tklarge Date 2015-02-28 Time 09:13 Rev Time 0.00
Received By tklarge Date 2015-02-10 Time 09:54 Sent To  
Notes
2015-02-11 09:41:34B09

Review Stop NFIP NFIP REVIEW ACTIVITY
Rev No 2 Status P Date 2015-08-05 Cont ID  
Sent By shill Date 2015-08-05 Time 11:15 Rev Time 0.00
Received By shill Date 2015-08-05 Time 11:14 Sent To  
Notes
2015-08-05 11:16:14PROVISO - FINISHED CONSTRUCTION EC REQUIRED PRIOR TO
 FINAL INSPECTION
  
 ALL EQUIPMENT TO BE ABOVE 7'6"
  
  
  

Review Stop NFIP NFIP REVIEW ACTIVITY
Rev No 1 Status F Date 2015-03-31 Cont ID  
Sent By shill Date 2015-03-31 Time 12:50 Rev Time 0.00
Received By shill Date 2015-03-31 Time 12:50 Sent To  
Notes
2015-03-31 12:52:03SEE 15010559 NFIP REVIEW
  
 PROVIDE A CORRECTED "BUILDING UNDER CONSTRUCTION"
 ELEVATION CERTIFICATE

Review Stop P PLUMBING
Rev No 1 Status P Date 2015-02-28 Cont ID  
Sent By skennedy Date 2015-02-28 Time 08:42 Rev Time 0.00
Received By tklarge Date 2015-02-28 Time 07:56 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved