Plan Review Details - Permit 15010590
Plan Review Stops For Permit 15010590
Review Stop E ELECTRICAL
Rev No 1 Status P Date 2015-01-20 Cont ID  
Sent By tklarge Date 2015-01-29 Time 09:45 Rev Time 0.00
Received By dhayes Date 2015-01-20 Time 14:53 Sent To P
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2015-02-03 Cont ID  
Sent By tklarge Date 2015-02-03 Time 05:40 Rev Time 0.00
Received By tklarge Date 2015-02-03 Time 05:20 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-01-29 Cont ID  
Sent By tlarge Date 2015-01-29 Time 09:45 Rev Time 0.00
Received By tklarge Date 2015-01-27 Time 11:59 Sent To P
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-01-29 Cont ID  
Sent By dhayes Date 2015-01-24 Time 09:42 Rev Time 0.00
Received By tklarge Date 2015-01-20 Time 14:52 Sent To E
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status P Date 2015-02-03 Cont ID  
Sent By tklarge Date 2015-02-03 Time 05:40 Rev Time 0.00
Received By tklarge Date 2015-02-03 Time 05:19 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2015-01-29 Cont ID  
Sent By tklarge Date 2015-01-29 Time 09:45 Rev Time 0.00
Received By tklarge Date 2015-01-29 Time 05:11 Sent To  
Notes
2015-01-29 09:46:10THE SUMP DISCHARGE LINE SHALL CONNECT TO THE BUILDING
 SEWER OR TO A WYE FITTING IN THE BUILDING DRAIN AND A
 MINIMUM 10 FEET FROM A STACK PER 2010 FPC 712.3.5. 2ND
 REQUEST.

Review Stop P PLUMBING
Rev No 1 Status F Date 2015-01-24 Cont ID  
Sent By tklarge Date 2015-01-24 Time 03:39 Rev Time 0.00
Received By tklarge Date 2015-01-24 Time 02:58 Sent To  
Notes
2015-01-24 03:39:041) SUBMIT 2 COPIES OF THE MANUFACTURER'S SPECIFICATIONS
 FOR THE PUMP TO BE USED IN THE SUMP. WPB AMEND. TO 2010
 FBC SEC.107.2.1.
 2) IF THE SUMP BASIN IS A PRE-MANUFACTURED UNIT, SUBMIT
 2 COPIES OF THE MANUFACTURER'S SPECIFICATIONS FOR THE
 SUMP BASIN.WPB AMEND. TO 2010 FBC SEC.107.2.1.
 3) THE SUMP PIT/BASIN SHALL BE NOT LESS THAN 18 INCHES
 IN DIAMETER AND 24 INCHES DEEP AND FITTED WITH A
 GAS-TIGHT REMOVABLE COVER. 2010 FPC SEC.712.3.2.
 4) THE SUMP DISCHARGE LINE SHALL CONNECT TO THE
 BUILDING SEWER OR TO A WYE FITTING IN THE BUILDING
 DRAIN AND A MINIMUM 10 FEET FROM A STACK PER 2010 FPC
 712.3.5.
 5) SUBMIT 2 COPIES OF THE MANUF. SPECS/INSTALLATION
 MANUAL FOR THE TANKLESS WATER HEATER.WPB AMEND. TO 2010
 FBC SEC.107.2.1.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved