Plan Review Details - Permit 15010241
Plan Review Stops For Permit 15010241
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2015-01-31 Cont ID  
Sent By tmoore Date 2015-01-31 Time 07:34 Rev Time 0.00
Received By tmoore Date 2015-01-31 Time 07:34 Sent To  
Notes
2015-01-31 07:34:00CONTRACTOR SUCCESSFULLY CAPPED SEWER LATERAL. WITH
 ENGINEERING AND HISTORIC APPROVAL, OK TO ISSUE.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2015-01-10 Cont ID  
Sent By tmoore Date 2015-01-10 Time 09:15 Rev Time 0.00
Received By tmoore Date 2015-01-10 Time 09:13 Sent To ENG
Notes
2015-01-10 09:15:36NEED PLUMBING PERMIT PULLED TO CAP THE SEWER LATERAL.
 AFTER CAPPING CALL A FINAL PLUMBING #703 TO PASS AND
 CLOSE OUT PERMIT. MISSING DEBRIS DISPOSAL FORM
 COMPLETED AND NOTICE OF COMMENCEMENT. MOVING ON TO
 ENGINEERING BOX FOR THEIR REVIEW. TM

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2015-02-04 Cont ID  
Sent By Mgonzale Date 2015-02-04 Time   Rev Time 1.00
Received By mgonzale Date 2015-02-04 Time   Sent To ENG
Notes
2015-02-04 08:41:40PASSED WITH PROVISOS ATTACHED.
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2015-02-04 Cont ID  
Sent By fmittner Date 2015-02-04 Time 08:44 Rev Time 0.00
Received By fmittner Date 2015-02-04 Time 08:44 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved