Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2015-01-06 Cont ID  
Sent By rmcdouga Date 2015-01-06 Time 18:01 Rev Time 0.00
Received By rmcdouga Date 2015-01-06 Time 17:39 Sent To  
Notes
2015-01-06 18:29:08THE MASTER PLAN HAS BEEN REVISED. ALL OF THE BUILDINGS
 THAT ARE CONSTRUCTED UNDER THE "MASTERED PLAN" WILL
 REFLECT THESE CHANGES.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2014-12-27 Cont ID  
Sent By rmcdouga Date 2014-12-27 Time 12:17 Rev Time 0.00
Received By rmcdouga Date 2014-12-27 Time 10:29 Sent To  
Notes
2014-12-27 12:17:04PLAN REVIEW COMMENTS
  
 2ND REVIEW: FBC 2010
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 REVISION DENIED
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 BUILDING
  
 1) THE PRODUCT APPROVALS THAT WERE SUBMITTED FOR THE
 FIXED WINDOWS FL15349.15 ARE FOR A TRIPLE FIXED GLASS
 WINDOW WITH DESIGN PRESSURES OF +55 / -55 PSF. THE
 FIXED GLASS WINDOWS ON THE PLANS ARE SMALL SINGLE FIXED
 GLASS WINDOWS IN THE BATHROOMS ( SAFETY GLAZING
 REQUIRED ). THE WINDOW SCHEDULE ON SHEET A3.0 HAS THIS
 PRODUCT APPROVAL LISTED WITH A PRESSURE OF +50 / -50
 PSF. WINDOW 11F IS LISTED IN THE SCHEDULE ON A3.0 AND
 ON A1.3 WITH A REQUIRED PRESSURE OF +41.2 / -54.8 PSF
 WHICH EXCEEDS THE PRODUCT PRESSURES LISTED IN THE
 SCHEDULE.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2014-12-15 Cont ID  
Sent By rmcdouga Date 2014-12-15 Time 07:57 Rev Time 0.00
Received By rmcdouga Date 2014-12-13 Time 06:30 Sent To  
Notes
2014-12-15 07:57:42PLAN REVIEW COMMENTS
  
 1ST REVIEW: FBC 2010
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 BUILDING
  
 1) THE NEW PRODUCT APPROVALS (MI SINGLE HUNG WINDOWS,
 FIXED WINDOWS AND SLIDING GLASS DOORS) THAT WERE
 SUBMITTED ARE INCOMPLETE. THE INSTALLATION INSTRUCTIONS
 ARE REQUIRED. SUBMIT COMPLETE PRODUCT APPROVALS FOR THE
 ITEMS THAT WILL BE INSTALLED AS REQUIRED BY DCA RULE
 9N-3.
  
 2) THERE WERE NO PRODUCT APPROVALS SUBMITTED FOR NEW
 STRUCTURAL MULLIONS. THE ONES THAT WERE SUBMITTED AND
 APPROVED ORIGINALLY ARE FROM LAWSON AND THE REVISED
 WINDOWS ARE MI. FBC 107.3.4 - PROVIDE TWO SETS OF
 PRODUCT APPROVALS FOR THOSE PRODUCTS WHICH ARE
 REGULATED BY DCA RULE 9N-3 THAT HAVE BEEN REVIEWED AND
 APPROVED IN WRITING BY THE DESIGNER OF RECORD.
  
 3) PROVIDE TWO COPIES OF THE WIND RESISTANCE TEST
 REPORTS ( ASTM E 330 ) FOR THE "ELDORADO STONE" WALL
 COVERING. FBC-R 703.1.2
  
 4) IN THE DOOR/WINDOW SCHEDULE ON SHEET A3.0, THE
 DESIGN PRESSURES ( +38.6 PSF, -40.0 PSF) FOR SLIDING
 GLASS DOOR " 4D" DO NOT MATCH THE PRESSURES SPECIFIED
 FOR THIS DOOR ON PLAN SHEETS A1.0 AND A1.1 (+38.1 PSF,
 -42.9 PSF). FBC 107.2.1
  
 5) THERE WERE NOT ANY CHANGES ON SHEETS A2.0, A2.1 AND
 P1.0 FROM THE APPROVED PLANS. OTHER THAN THE ITEMS
 LISTED IN REVIEW NOTE #4, THE OTHER REVISED PLAN SHEETS
 WERE OKAY. THERE WERE A TOTAL OF THIRTEEN (13) REVISED
 PLAN SHEETS AND THREE (3) REVISED PRODUCT APPROVALS.
 THIS DOES NOT INCLUDE THE WINDOW MULLION PRODUCT
 APPROVAL THAT WAS NOT SUBMITTED.
  
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2014-12-27 Cont ID  
Sent By rmcdouga Date 2014-12-27 Time 11:20 Rev Time 0.00
Received By rmcdouga Date 2014-12-27 Time 10:30 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2014-12-13 Cont ID  
Sent By rmcdouga Date 2014-12-13 Time 10:13 Rev Time 0.00
Received By rmcdouga Date 2014-12-13 Time 06:30 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2015-01-06 Cont ID  
Sent By rmcdouga Date 2015-01-06 Time 18:02 Rev Time 0.00
Received By rmcdouga Date 2014-12-31 Time 08:52 Sent To  
Notes
2015-01-03 08:52:40SENT TO R MCDOUGAL
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2014-12-27 Cont ID  
Sent By rmcdouga Date 2014-12-27 Time 12:17 Rev Time 0.00
Received By rmcdouga Date 2014-12-19 Time 09:25 Sent To  
Notes
2014-12-20 09:26:11* * * * EXPEDITE * * * *
  
 TO RM DESK
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-12-15 Cont ID  
Sent By rmcdouga Date 2014-12-15 Time 07:58 Rev Time 0.00
Received By rmcdouga Date 2014-12-12 Time 06:31 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2014-12-13 Cont ID  
Sent By rmcdouga Date 2014-12-13 Time 07:37 Rev Time 0.00
Received By rmcdouga Date 2014-12-13 Time 06:30 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2014-12-13 Cont ID  
Sent By rmcdouga Date 2014-12-13 Time 06:57 Rev Time 0.00
Received By rmcdouga Date 2014-12-13 Time 06:57 Sent To  
Notes
2014-12-13 07:01:13THERE WERE NOT ANY CHANGES ON PLUMBING SHEET FROM THE
 APPROVED MASTER PLAN.

Review Stop Z ZONING
Rev No 1 Status N Date 2014-12-13 Cont ID  
Sent By rmcdouga Date 2014-12-13 Time 06:31 Rev Time 0.00
Received By rmcdouga Date 2014-12-13 Time 06:31 Sent To  
Notes
***NONE***