Plan Review Stops For Permit 14120516 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2015-01-06 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2015-01-06 |
Time |
18:01 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2015-01-06 |
Time |
17:39 |
Sent To |
|
|
Notes |
2015-01-06 18:29:08 | THE MASTER PLAN HAS BEEN REVISED. ALL OF THE BUILDINGS | | THAT ARE CONSTRUCTED UNDER THE "MASTERED PLAN" WILL | | REFLECT THESE CHANGES. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2014-12-27 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2014-12-27 |
Time |
12:17 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2014-12-27 |
Time |
10:29 |
Sent To |
|
|
Notes |
2014-12-27 12:17:04 | PLAN REVIEW COMMENTS | | | | 2ND REVIEW: FBC 2010 | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | REVISION DENIED | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | BUILDING | | | | 1) THE PRODUCT APPROVALS THAT WERE SUBMITTED FOR THE | | FIXED WINDOWS FL15349.15 ARE FOR A TRIPLE FIXED GLASS | | WINDOW WITH DESIGN PRESSURES OF +55 / -55 PSF. THE | | FIXED GLASS WINDOWS ON THE PLANS ARE SMALL SINGLE FIXED | | GLASS WINDOWS IN THE BATHROOMS ( SAFETY GLAZING | | REQUIRED ). THE WINDOW SCHEDULE ON SHEET A3.0 HAS THIS | | PRODUCT APPROVAL LISTED WITH A PRESSURE OF +50 / -50 | | PSF. WINDOW 11F IS LISTED IN THE SCHEDULE ON A3.0 AND | | ON A1.3 WITH A REQUIRED PRESSURE OF +41.2 / -54.8 PSF | | WHICH EXCEEDS THE PRODUCT PRESSURES LISTED IN THE | | SCHEDULE. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2014-12-15 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2014-12-15 |
Time |
07:57 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2014-12-13 |
Time |
06:30 |
Sent To |
|
|
Notes |
2014-12-15 07:57:42 | PLAN REVIEW COMMENTS | | | | 1ST REVIEW: FBC 2010 | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | BUILDING | | | | 1) THE NEW PRODUCT APPROVALS (MI SINGLE HUNG WINDOWS, | | FIXED WINDOWS AND SLIDING GLASS DOORS) THAT WERE | | SUBMITTED ARE INCOMPLETE. THE INSTALLATION INSTRUCTIONS | | ARE REQUIRED. SUBMIT COMPLETE PRODUCT APPROVALS FOR THE | | ITEMS THAT WILL BE INSTALLED AS REQUIRED BY DCA RULE | | 9N-3. | | | | 2) THERE WERE NO PRODUCT APPROVALS SUBMITTED FOR NEW | | STRUCTURAL MULLIONS. THE ONES THAT WERE SUBMITTED AND | | APPROVED ORIGINALLY ARE FROM LAWSON AND THE REVISED | | WINDOWS ARE MI. FBC 107.3.4 - PROVIDE TWO SETS OF | | PRODUCT APPROVALS FOR THOSE PRODUCTS WHICH ARE | | REGULATED BY DCA RULE 9N-3 THAT HAVE BEEN REVIEWED AND | | APPROVED IN WRITING BY THE DESIGNER OF RECORD. | | | | 3) PROVIDE TWO COPIES OF THE WIND RESISTANCE TEST | | REPORTS ( ASTM E 330 ) FOR THE "ELDORADO STONE" WALL | | COVERING. FBC-R 703.1.2 | | | | 4) IN THE DOOR/WINDOW SCHEDULE ON SHEET A3.0, THE | | DESIGN PRESSURES ( +38.6 PSF, -40.0 PSF) FOR SLIDING | | GLASS DOOR " 4D" DO NOT MATCH THE PRESSURES SPECIFIED | | FOR THIS DOOR ON PLAN SHEETS A1.0 AND A1.1 (+38.1 PSF, | | -42.9 PSF). FBC 107.2.1 | | | | 5) THERE WERE NOT ANY CHANGES ON SHEETS A2.0, A2.1 AND | | P1.0 FROM THE APPROVED PLANS. OTHER THAN THE ITEMS | | LISTED IN REVIEW NOTE #4, THE OTHER REVISED PLAN SHEETS | | WERE OKAY. THERE WERE A TOTAL OF THIRTEEN (13) REVISED | | PLAN SHEETS AND THREE (3) REVISED PRODUCT APPROVALS. | | THIS DOES NOT INCLUDE THE WINDOW MULLION PRODUCT | | APPROVAL THAT WAS NOT SUBMITTED. | | | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2014-12-27 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2014-12-27 |
Time |
11:20 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2014-12-27 |
Time |
10:30 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2014-12-13 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2014-12-13 |
Time |
10:13 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2014-12-13 |
Time |
06:30 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2015-01-06 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2015-01-06 |
Time |
18:02 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2014-12-31 |
Time |
08:52 |
Sent To |
|
|
Notes |
2015-01-03 08:52:40 | SENT TO R MCDOUGAL | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2014-12-27 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2014-12-27 |
Time |
12:17 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2014-12-19 |
Time |
09:25 |
Sent To |
|
|
Notes |
2014-12-20 09:26:11 | * * * * EXPEDITE * * * * | | | | TO RM DESK | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2014-12-15 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2014-12-15 |
Time |
07:58 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2014-12-12 |
Time |
06:31 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
P |
Date |
2014-12-13 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2014-12-13 |
Time |
07:37 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2014-12-13 |
Time |
06:30 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
N |
Date |
2014-12-13 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2014-12-13 |
Time |
06:57 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2014-12-13 |
Time |
06:57 |
Sent To |
|
|
Notes |
2014-12-13 07:01:13 | THERE WERE NOT ANY CHANGES ON PLUMBING SHEET FROM THE | | APPROVED MASTER PLAN. |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
N |
Date |
2014-12-13 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2014-12-13 |
Time |
06:31 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2014-12-13 |
Time |
06:31 |
Sent To |
|
|
Notes |
|
|