Plan Review Stops For Permit 14120372 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
N |
Date |
|
|
|
Cont ID |
|
Sent By |
|
Date |
|
Time |
|
Rev Time |
|
Received By |
|
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
P |
Date |
2014-12-10 |
|
|
Cont ID |
|
Sent By |
Mgonzale |
Date |
2014-12-10 |
Time |
|
Rev Time |
0.50 |
Received By |
mgonzale |
Date |
2014-12-10 |
Time |
|
Sent To |
I |
|
Notes |
2014-12-10 14:35:50 | PASSED WITH PROVISOS: | | | | #1 CALL 811 BEFORE ANY DIGG. | | #2 A ROW PERMIT MAY BE REQUIRED IF EQUIPMENT IS STAGED | | OR BLOCKING THE ROW | | #3 NPDES REQUIREMENTS REQUIRE THAT YOU PROTECT ANY AND | | ALL CATCH BASINS, AND DRAINAGE STRUCTURES IN THE AREA. | | #4 PAVEMENT AREA WILL NOT BE STRUCTURALLY ALTERRED TO | | CAUSE ADVERSE EFFECTS. | | #5 ALL STORM WATER IS TO REMAIN ON-SITE. | | | | MANUEL JULIAN GONZALEZ | | ENGINEERING PROJECT COORDINATOR | | PUBLIC WORKS DEPARTMENT | | 401 CLEMATIS STREET, 4TH FLOOR | | WEST PALM BEACH, FL 33401 | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | MAIN PHONE: (561) 822-1200 | | DIRECT: (561) 494-1085 | | FAX: (561) 494-1116 | | EMAIL: [email protected] | | WWW.WPB.ORG/ENGINEERING | | | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2014-12-09 |
|
|
Cont ID |
|
Sent By |
sgraham |
Date |
2014-12-09 |
Time |
15:59 |
Rev Time |
0.00 |
Received By |
sgraham |
Date |
2014-12-09 |
Time |
15:59 |
Sent To |
B |
|
Notes |
|
|
|