Plan Review Details - Permit 14120256
Plan Review Stops For Permit 14120256
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2015-01-15 Cont ID  
Sent By skennedy Date 2015-01-15 Time 13:02 Rev Time 0.00
Received By skennedy Date   Time   Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2015-01-07 Cont ID  
Sent By shill Date 2015-01-07 Time 09:45 Rev Time 0.00
Received By shill Date 2015-01-07 Time 09:45 Sent To  
Notes
2015-01-07 09:47:39****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 COMMENTS FROM PREVIOUS LIST:
  
 1. OK
  
 2. CALCULATIONS AND OTHER SPEC/REPORTS ARE TO BE IN A
 FORMAT ACCEPTABLE TO FBPE, SEE FAC61G15-23.002.
  
 3. PROVIDE A COPY OF THE CONTRACT FOR THIS JOB FBC 109.
 VALUE TO INCLUDE LABOR, MATERIALS, ENGINEERING,
 OVERHEAD, PROFIT.
  
 2ND REVIEW - A DOCUMENT WAS PROVIDED, BUT IS NOT
 ITEMIZED AND THE NAME OF THE INDIVIDUAL SIGNING ON
 BEHALF OF TMOBILE IS NOT LEGIBLE. TYPICALLY A MATERIAL
 SUMMARY IS PROVIDED FROM THE CELLULAR CARRIER. THIS MAY
 BE SENT VIA EMAIL.
  
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2014-12-15 Cont ID  
Sent By shill Date 2014-12-15 Time 14:32 Rev Time 0.00
Received By shill Date 2014-12-15 Time 14:31 Sent To E
Notes
2014-12-15 14:33:58****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. DOCUMENTS PREPARED BY AN ENGINEER AND SUBMITTED FOR
 PUBLIC RECORD ARE TO BE SIGNED, SEALED, DATED ORIGINALS
 FS471.
  
 2. CALCULATIONS AND OTHER SPEC/REPORTS ARE TO BE IN A
 FORMAT ACCEPTABLE TO FBPE, SEE FAC61G15-23.002.
  
 3. PROVIDE A COPY OF THE CONTRACT FOR THIS JOB FBC 109.
 VALUE TO INCLUDE LABOR, MATERIALS, ENGINEERING,
 OVERHEAD, PROFIT.
  
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2014-12-23 Cont ID  
Sent By dhayes Date 2014-12-23 Time 07:47 Rev Time 0.00
Received By dhayes Date 2014-12-23 Time 07:47 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-01-07 Cont ID  
Sent By shill Date 2015-01-07 Time 09:49 Rev Time 0.00
Received By shill Date 2015-01-05 Time 07:59 Sent To  
Notes
2015-01-06 07:59:23TO SH DESK
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-12-23 Cont ID  
Sent By dhayes Date 2014-12-23 Time 07:47 Rev Time 0.00
Received By dhayes Date 2014-12-08 Time 09:52 Sent To  
Notes
2014-12-15 14:34:1812/15 TO ELEC
  
2014-12-09 09:55:47SENT TO ZONING

Review Stop Z ZONING
Rev No 1 Status P Date 2014-12-11 Cont ID  
Sent By llouie Date 2014-12-11 Time 13:15 Rev Time 0.00
Received By llouie Date 2014-12-11 Time 13:15 Sent To B
Notes
2014-12-11 13:17:06ZONING APPROVED WITH THE FOLLOWING PROVISO:
  
 1.) ALL NEW EXTERNALLY MOUNTED EQUIPMENT SHALL COLOR
 MATCH THE BUILDING PER CITYSCAPE APPROVAL LETTER DATED
 11/24/14. (REFERENCE: WCF#14-24)