Plan Review Details - Permit 14100100
Plan Review Stops For Permit 14100100
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2015-02-17 Cont ID  
Sent By shill Date 2015-02-17 Time 07:25 Rev Time 0.00
Received By shill Date 2015-02-17 Time 07:22 Sent To  
Notes
2015-02-17 07:25:28****PROVISO****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 SEPARATE PERMIT FOR SHUTTERS
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2015-02-09 Cont ID  
Sent By shill Date 2015-02-09 Time 09:43 Rev Time 0.00
Received By shill Date 2015-02-09 Time 09:43 Sent To  
Notes
2015-02-09 09:56:21****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 COMMENTS FROM PREVIOUS LIST, NOT ADDRESSED:
  
 1. SHUTTER CONNECTION MOUNTING TYPE SHOULD CORRELATE
 WITH THE ANCHOR CHARTS ON SHEET 11 (FOR EXAMPLE, 1 TOP,
 2 BOTTOM, ETC.). FOR TAPCONS, MASONRY SUBSTRATE, NOT
 ALL CONNECTION TYPES ARE ALLOWED AND ALL REQUIRE ANCHOR
 SPACING OF 4 1/2" OR 5". 12" IS PROPOSED.
  
 2. SUBSTRATE STATED IS "CONC. BLK". MOST CBS STRUCTURES
 HAVE A CONCRETE TOP SUBSTRATE, MASONRY BOTTOM
 SUBSTRATE.
  
 NEW COMMENT:
  
 3. THE APPLICATION STATES THAT SCOPE IS TO INSTALL 2
 WINDOWS AND 2 DOORS, BUT THE PLAN DOES NOT INDICATE
 WHICH WINDOWS ARE INCLUDED IN THE SCOPE. FBC 107,
 REVISE PLAN TO INDICATE WHICH WINDOWS ARE INCLUDED IN
 THE SCOPE OF THIS PERMIT OR REVISE APPLICATION.
  
 4. VALUE IS TOO LOW, FBC 109. VALUE SHOULD INCLUDE THE
 VALUE OF LABOR, MATERIALS, OVERHEAD, PROFIT,
 ENGINEERING/PLANS, EVEN IF PROVIDED BY OTHERS, FBC 109.
  
 5. IF THE SHUTTER INSTALLATION SCHEDULE IS NOT
 CORRECTED WHEN RESUBMITTED, THIS PERMIT WILL BE ISSUED
 WITH PROVISO THAT A REVISION WILL BE REQUIRED PRIOR TO
 FIRST INSPECTION, FBC 107.
  
 6. RESUBMITTALS ARE TO BE DONE THROUGH THE FRONT
 COUNTER WITH A RESUBMITTAL FORM. FAILURE TO FOLLOW THE
 PROCEDURES MAY RESULT IN PLANS NOT BEING ROUTED AND
 REVIEWED TIMELY, OR IN PLANS MISPLACED OR LOST. THE
 RESUBMITTAL FORM AND TRACKING THROUGH THE FRONT COUNTER
 ENSURES THAT YOUR RESUBMITTAL IS REVIEWED AND FILED
 CORRECTLY AND WITHIN OUR TARGET TURNAROUND TIMES.
  
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2015-01-23 Cont ID  
Sent By shill Date 2015-01-23 Time 16:34 Rev Time 0.00
Received By shill Date 2015-01-23 Time 16:34 Sent To  
Notes
2015-01-23 16:41:52****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. SHUTTER CONNECTION MOUNTING TYPE SHOULD CORRELATE
 WITH THE ANCHOR CHARTS ON SHEET 11 (FOR EXAMPLE, 1 TOP,
 2 BOTTOM, ETC.). FOR TAPCONS, MASONRY SUBSTRATE, NOT
 ALL CONNECTION TYPES ARE ALLOWED AND ALL REQUIRE ANCHOR
 SPACING OF 4 1/2" OR 5". 12" IS PROPOSED.
  
 2. SUBSTRATE STATED IS "CONC. BLK". MOST CBS STRUCTURES
 HAVE A CONCRETE TOP SUBSTRATE, MASONRY BOTTOM
 SUBSTRATE.
  
 3. PLEASE RE PRINT THE SHUTTER PRODUCT APPROVALS AS
 THEY ARE NOT LEGIBLE AND/OR COMPLETE, FBC 107. AT
 APPEARS THAT ONLY HALF OF THE PAGE PRINTED.
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2014-10-10 Cont ID  
Sent By shill Date 2014-10-10 Time 11:38 Rev Time 0.00
Received By shill Date 2014-10-10 Time 11:38 Sent To  
Notes
2014-10-10 11:47:58****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. VALUE TO INCLUDE LABOR AND MATERIALS, OVERHEAD AND
 PROFIT, FBC 109. VALUE HAS BEEN ADJUSTED.
  
 2. IMPACT PROTECTION REQUIRED,FBC1609.1.4, FBC R
 301.2.1.2. PROVIDE PRODUCT APPROVALS AND, IF SHUTTERS
 ARE USED, COMPLETE THE SAMPLE INSTALLATION SCHEDULE
 (AVAILABLE IN THE LOBBY AND AT:
  
 HTTP://WPB.ORG/DEVELOPMENT/WP-CONTENT/UPLOADS/SITES/33/
 2013/09/SCHEDULE_FOR_INSTALLATION.PDF
  
 IF THIS FALLS UNDER THE 25% EXCEPTION FBC EB 606.4,
 PROVIDE CALCULATIONS.
  
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2015-02-17 Cont ID  
Sent By shill Date 2015-02-17 Time 07:25 Rev Time 0.00
Received By shill Date 2015-02-10 Time 10:09 Sent To B
Notes
2015-02-10 10:09:54TO SHILLS DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-01-23 Cont ID  
Sent By shill Date 2015-01-23 Time 16:41 Rev Time 0.00
Received By shill Date 2015-01-16 Time 17:52 Sent To  
Notes
2015-01-16 17:52:54RE-SUBMITTAL SENT TO SAMANTHA HILL FOR REVIEW. JG.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-10-10 Cont ID  
Sent By shill Date 2014-10-10 Time 11:48 Rev Time 0.00
Received By shill Date 2014-10-10 Time 11:48 Sent To  
Notes
2014-10-02 16:07:21ROUTED TO BUILDING LESS THAN $5000