Plan Review Stops For Permit 14090944 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
P |
Date |
2014-12-06 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2014-12-06 |
Time |
12:47 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2014-12-06 |
Time |
12:47 |
Sent To |
E |
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
F |
Date |
2014-12-04 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2014-12-04 |
Time |
17:03 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2014-12-04 |
Time |
17:00 |
Sent To |
E |
|
Notes |
2014-12-04 17:23:53 | ****CORRECTIONS**** | | ****COURTESY REVIEW - CONTRACTOR REQUESTED THAT PERMIT | | BE ISSUED, NO PERMIT REQUIRED FOR KITCHEN (STATED THAT | | KITCHEN TO BE REPLACED SAME CONFIGURATION, NEW CABINETS | | AND APPLICANCES ONLY)*** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | FROM PREVIOUS LIST: | | | | 1. PLANS PROVIDED ARE NOT CONSISTENT WITH THE SCOPE OF | | THE APPLICATION, FBC 107.2.1. | | | | APPLICATION IS TO "ENCLOSE DEN AREA WITH A SET OF | | FRENCH DOORS" BUT PLANS ALSO SHOW A KITCHEN RENOVATION, | | NEW CABINETS, ELECTRICAL WORK. EITHER REVISE PLAN TO | | INCLUDE ONLY WORK PROPOSED OR REVISE VALUE AND | | DESCRIPTION TO INCLUDE ALL WORK SHOWN ON THE PLANS. | | | | NEW COMMENT PURSUANT TO CONTRACTOR'S EMAIL 12/4: | | | | 2. AS KITCHEN IS BEING CONFIGURED AND THE ELECTRICAL | | WORK AFFECTS THE KITCHEN CABINETS, AS DISCUSSED WITH | | THE ARCHITECT, PROVIDE PLANS WHICH INCLUDE SCOPE OF | | WORK UNDER THIS PERMIT - ACCORDING TO CONTRACTOR, THE | | DEN. AS KITCHEN IS BEING DONE SEPARATELY BUT YOUR | | ELECTRICAL SUBCONTRACTOR IS DOING THE ELECTRICAL, THE | | ENTIRE KITCHEN (INCLUDING ELECTRICAL WORK IN THE | | KITCHEN) SHOULD BE ON A SEPARATE PERMIT WITH SEPARATE | | PLANS AS CONTRACTOR STATES THAT "OTHERS" ARE DOING THIS | | SCOPE OF WORK. | | | | MY UNDERSTANDING IS THAT THE KITCHEN CABINET INSTALLER | | HAS STATED THAT THE CABINET INSTALLATION IS "LIKE | | MAKING FURNITURE" AND DOES NOT NEED A PERMIT. A PERMIT | | AND CONTRACTING LICENSE ARE REQUIRED FOR THIS | | INSTALLATION. SEE THE FOLLOWING WEBSITE: | | | | HTTP://WWW.PBCGOV.COM/PZB/CONTRACTORS/ | | | | AND SEE "STANDARDS FOR CERTIFIED CATEGORIES" | | | | HTTP://WWW.PBCGOV.COM/PZB/CONTRACTORS/STANDARDS.PDF | | | | INSTALLATION OF CABINETRY IS REGULATED BY PALM BEACH | | COUNTY. THEREFORE, A CONTRACTOR LICENSE IS REQUIRED TO | | INSTALL CABINETS. A PERMIT IS ALSO REQUIRED. | | | | | | | | | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2014-12-01 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2014-12-01 |
Time |
09:35 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2014-12-01 |
Time |
09:35 |
Sent To |
E |
|
Notes |
2014-12-01 09:37:18 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | 1. PLANS PROVIDED ARE NOT CONSISTENT WITH THE SCOPE OF | | THE APPLICATION, FBC 107.2.1. | | | | APPLICATION IS TO "ENCLOSE DEN AREA WITH A SET OF | | FRENCH DOORS" BUT PLANS ALSO SHOW A KITCHEN RENOVATION, | | NEW CABINETS, ELECTRICAL WORK. EITHER REVISE PLAN TO | | INCLUDE ONLY WORK PROPOSED OR REVISE VALUE AND | | DESCRIPTION TO INCLUDE ALL WORK SHOWN ON THE PLANS. | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2014-10-14 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2014-10-14 |
Time |
17:51 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2014-10-14 |
Time |
17:51 |
Sent To |
|
|
Notes |
2014-10-14 17:53:16 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | 1. FBC 107, PROVIDE PLANS WHICH ARE A MINIMUM OF 1/8" | | SCALE AND LEGIBLE. PLANS TO SHOW SCOPE, LOCATION, OF | | PROPOSED WORK. | | | | PLANS SUBMITTED ARE TOO SMALL TO READ; UNABLE TO | | PROVIDE A COMPLETE CHECKLIST AT THIS TIME. | | | | 2. FBC 107, PROVIDE SPECS FOR PROPOSED FRENCH DOOR. | | | | | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2014-12-05 |
|
|
Cont ID |
|
Sent By |
dhayes |
Date |
2014-12-05 |
Time |
10:55 |
Rev Time |
0.00 |
Received By |
dhayes |
Date |
2014-12-05 |
Time |
10:55 |
Sent To |
|
|
Notes |
2014-12-05 10:59:54 | 12/5/2014 | | PROJECT: TWO CITY CONDO #816 | | PERMIT#: 14090944 | | CODE: 2008 EDITION OF THE NEC, 2010 EDITION OF THE FBC | | ,2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, | | ADMINISTRATION, 2012 FBC SUPPLEMENTS. | | 1ST ELECTRICAL PLAN REVIEW | | ACTION: APPROVED WITH EXCEPTION. | | | | 1) WHEN ALTERATIONS, REPAIRS, OR ADDITIONS REQUIRING A | | PERMIT OCCUR, THE INDIVIDUAL DWELLING UNIT SHALL BE | | EQUIPPED WITH SMOKE ALARMS LOCATED AS REQUIRED FOR NEW | | DWELLINGS. VERIFY OR PROVIDE INTERCONNECTED SMOKE | | DETECTORS AS NEEDED. FBC-R 314 AND 315. | | | | 2) ALL NEW GENERAL PURPOSE OUTLETS MUST BE TAMPER | | RESISTANT AND AFCI PROTECTED. NEC 210.12, 406.11 | | | | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, | | 561-805-6717 OR [email protected] | | |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
P |
Date |
2014-11-13 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2014-12-01 |
Time |
09:41 |
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2014-11-13 |
Time |
08:06 |
Sent To |
B |
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
F |
Date |
2014-10-16 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2014-10-16 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2014-10-16 |
Time |
11:26 |
Sent To |
PC |
|
Notes |
2014-10-16 11:33:34 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | THE PLANS WERE SMALL AND MANY OF THE DIMENSIONS WERE | | UNREADALBE. MUCH OF THE WORDING WAS A IN SMALL FONT AND | | UNREADABLE. | | | | THE NATURE OF THE REMODEL REQUIRES AN EVALUATION OF THE | | FIRE ALARM AND SPRINKLER SYSTEM FOR CODE COVERAGE AND | | COMPLIANCE. | | | | THE FOLLOWING MUST BE INDICATED ON THE SUBMITTAL. | | | | THE LIFE SAFETY SYSTEMS, FIRE ALARM AND/OR FIRE | | SPRINKLER SHALL REMAIN ACTIVE THROUGHOUT THE | | CONSTRUCTION PERIOD. | | | | ANY AND ALL WORK ON THE FIRE ALARM AND FIRE SPRINKLER | | SYSTEMS SHALL BE DONE UNDER SEPARATE SHOP DRAWINGS AND | | BY CERTIFIED LIFE SAFETY CONTRACTORS. | | | | ANY TIME THAT WORK ON THE LIFE SAFETY SYSTEMS, | | SPRINKLER AND/OR FIRE ALARM, EXCEEDS 4 HOURS, A FIRE | | WATCH SHALL BE IMPLEMENTED AND MAINTAINED UNTIL FULL | | AND COMPLETE PROTECTION IS RETURNED | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2014-12-08 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2014-12-08 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2014-12-05 |
Time |
12:56 |
Sent To |
|
|
Notes |
2014-12-06 12:58:01 | THE SET STAMPED "CONTRACTOR" IS THE ONLY SIGNED AND | | SEALED ORIGINAL. SENDING PLANS BACK TO ELECTRICAL TO | | CONFIRM THAT ALL REDLINES AND NOTES ARE ON THE OTHER | | SET WHICH WAS PREVIOUSLY STAMPED "FILE SET" (AND IS NOT | | SIGNED AND SEALED). | | | | ROUTED TO DAH DESK | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2014-12-05 |
|
|
Cont ID |
|
Sent By |
jwitmer |
Date |
2014-12-05 |
Time |
11:00 |
Rev Time |
|
Received By |
dhayes |
Date |
2014-11-10 |
Time |
16:07 |
Sent To |
|
|
Notes |
2014-12-01 09:42:17 | 12/1 TO ELEC | | | 2014-11-19 08:29:30 | TO MISC 2 BOX |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2014-10-16 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2014-10-16 |
Time |
11:28 |
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2014-09-25 |
Time |
07:43 |
Sent To |
|
|
Notes |
2014-10-14 17:53:57 | TO FIRE | | | 2014-09-26 07:43:32 | SENT TO MISC 1 BOX |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2014-11-19 |
|
|
Cont ID |
|
Sent By |
aaponte |
Date |
2014-11-19 |
Time |
08:29 |
Rev Time |
0.00 |
Received By |
aaponte |
Date |
2014-11-19 |
Time |
08:29 |
Sent To |
|
|
Notes |
|
|