| PROJECT: POWDER RM |
| PERMIT#: 14090896 |
| CODE: 2008 EDITION OF THE NEC |
| 2010 EDITION OF THE FBC |
| 2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, |
| ADMINISTRATION, 2012 FBC SUPPLEMENTS. |
| |
| ELECTRICAL PLAN REVIEW |
| ACTION: |
| |
| 1) PROVIDE A SITE PLAN OR FLOOR PLAN TO INDICATE THE |
| LOCATION OF THE NEW POWDER ROOM. IS IT INSIDE THE |
| EXISTING CONDITIONED SPACE UNDER ROOF? OR IS THERE AN |
| ADDITION BEING BUILT TO ADD THE NEW SPACE? |
| |
| 1) PROVIDE ELECTRICAL PLANS TO INDICATE THE FOLLOWING: |
| A. NEC 210.52(C)(3) BATHROOM BRANCH CIRCUITS. IN |
| ADDITION TO THE NUMBER OF BRANCH CIRCUITS REQUIRED BY |
| OTHER PARTS OF THIS SECTION, AT LEAST ONE 20-AMPERE |
| BRANCH CIRCUIT SHALL BE PROVIDED TO SUPPLY BATHROOM |
| RECEPTACLE OUTLET(S). SUCH CIRCUITS SHALL HAVE NO OTHER |
| OUTLETS. |
| B. 210.70 LIGHTING OUTLETS REQUIRED. LIGHTING OUTLETS |
| SHALL BE INSTALLED WHERE SPECIFIED IN 210.70(A), (B), |
| AND (C). |
| (A) DWELLING UNITS. IN DWELLING UNITS, LIGHTING OUTLETS |
| SHALL BE INSTALLED IN ACCORDANCE WITH 210.70(A)(1), |
| (A)(2), AND (A)(3). |
| (1) HABITABLE ROOMS. AT LEAST ONE WALL |
| SWITCH?CONTROLLED LIGHTING OUTLET SHALL BE INSTALLED IN |
| EVERY HABITABLE ROOM AND BATHROOM. |
| |
| WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| RE-SUBMITTAL FORM. SEE LINK: |
| HTTP://WPB.ORG/DEVELOPMENT/WP-CONTENT/UPLOADS/SITES/33/ |
| 2013/09/APPLICATION_RESUBMITTAL_FORM_04132010.PDF |
| |
| ADDITIONALLY, PLEASE INSERT CORRECTED PAGES INTO |
| SUBMITTAL PACKAGE AND LEAVE THE PREVIOUSLY REVIEWED |
| SHEETS FOR COMPARATIVE REVIEW. |
| |
| DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, |
| 561-805-6717 OR [email protected] |
| |