Plan Review Details - Permit 14090840
Plan Review Stops For Permit 14090840
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2014-10-01 Cont ID  
Sent By jwitmer Date 2014-10-01 Time 09:26 Rev Time 0.00
Received By jwitmer Date 2014-10-01 Time 08:54 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2014-09-24 Cont ID  
Sent By dhayes Date 2014-09-24 Time 12:50 Rev Time 0.00
Received By dhayes Date 2014-09-24 Time 10:59 Sent To  
Notes
2014-09-24 12:50:24DATE: 9/24/2014
 PROJECT: NORTHPOINT SUITE 340
 PERMIT#: 14090840
 CODE: 2008 EDITION OF THE NEC
 2010 EDITION OF THE FBC
 2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1,
 ADMINISTRATION, 2012 FBC SUPPLEMENTS.
  
 1ST ELECTRICAL PLAN REVIEW
 ACTION: PROVISO
  
 1) FBC-ENERGY
 505.2 LIGHTING CONTROLS (MANDATORY).
 LIGHTING SYSTEMS SHALL BE PROVIDED WITH CONTROLS AS
 REQUIRED IN SECTIONS 505.2.1, 505.2.2, 505.2.3 AND
 505.2.4.
 505.2.2 AUTOMATIC LIGHTING SHUTOFF.
 BUILDINGS LARGER THAN 5,000 SQUARE FEET (465 M2) SHALL
 BE EQUIPPED WITH AN AUTOMATIC CONTROL DEVICE TO SHUT
 OFF LIGHTING IN THOSE AREAS.
 REVISE PLANS AND INSTALLATION IN COMPLIANCE WITH
 SECTION 505 AS DESRIBED ABOVE.
  
 2) VERIFY DEDICATED SPACE AND WORKING CLEARANCE IN THE
 ELECTRICAL ROOM WHEN INSTALLING THE NEW PANEL RL AS
 REQUIRED BY THE NEC 110.26
  
 DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421,
 561-805-6717 OR [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2014-10-06 Cont ID  
Sent By pleduc Date 2014-10-06 Time   Rev Time 0.00
Received By pleduc Date 2014-10-06 Time 10:20 Sent To  
Notes
2014-10-06 10:49:27THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 SHEET A 3.01, DOOR 07 SHALL NOT SWING INTO THE HALLWAY
 MORE THAN 1/2 OF THE HALLWAY WIDTH OR IT SHALL NOT BE
 INSTALLED TO SWING INTO HALLWAY.
  
 THE NATURE OF THE REMODEL REQUIRES AN EVALUATION OF THE
 FIRE ALARM AND SPRINKLER SYSTEM FOR CODE COVERAGE AND
 COMPLIANCE.
  
 THE LIFE SAFETY SYSTEMS, FIRE ALARM AND/OR FIRE
 SPRINKLER SHALL REMAIN ACTIVE THROUGHOUT THE
 CONSTRUCTION PERIOD.
  
 ANY AND ALL WORK ON THE FIRE ALARM AND FIRE SPRINKLER
 SYSTEMS SHALL BE DONE UNDER SEPARATE SHOP DRAWINGS AND
 BY CERTIFIED LIFE SAFETY CONTRACTORS.
  
 ANY TIME THAT WORK ON THE LIFE SAFETY SYSTEMS,
 SPRINKLER AND/OR FIRE ALARM, EXCEEDS 4 HOURS, A FIRE
 WATCH SHALL BE IMPLEMENTED AND MAINTAINED UNTIL FULL
 AND COMPLETE PROTECTION IS RETURNED.
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-10-08 Cont ID  
Sent By tklarge Date 2014-10-08 Time 05:55 Rev Time 0.00
Received By tklarge Date 2014-09-23 Time 10:59 Sent To  
Notes
2014-09-24 10:58:55B18

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2014-09-26 Cont ID  
Sent By rbergsma Date 2014-09-26 Time   Rev Time 0.50
Received By rbergsma Date   Time   Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2014-10-08 Cont ID  
Sent By tklarge Date 2014-10-08 Time 05:54 Rev Time 0.00
Received By tklarge Date 2014-10-08 Time 05:54 Sent To  
Notes
***NONE***