Plan Review Details - Permit 14081281
Plan Review Stops For Permit 14081281
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2014-09-18 Cont ID  
Sent By rmcdouga Date 2014-09-18 Time 08:43 Rev Time 0.00
Received By rmcdouga Date 2014-09-17 Time 17:18 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2014-09-08 Cont ID  
Sent By rmcdouga Date 2014-09-08 Time 09:54 Rev Time 0.00
Received By rmcdouga Date 2014-09-08 Time 06:41 Sent To  
Notes
2014-09-08 07:54:05PLAN REVIEW COMMENTS
  
  
 1ST REVIEW: FBC 2010
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 BUILDING
  
 1) FBC-107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
 ALL INFORMATION, DRAWINGS, SPECIFICATIONS AND
 ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE OF
 THE PERSON RESPONSIBLE FOR THE DESIGN.
  
 2) THE WIND SPEED DESIGN IS NOT CONSISTENT WITH THE
 ADOPTED MAP FBC 119, CITY AMENDMENTS. THE DEFAULT
 WINDSPEED FOR THE CITY OF WEST PALM BEACH IS 170 MPH
 VULT AND 132 VASD (NOMINAL). IF YOU WISH TO USE LINEAR
 INTERPOLATION TO DETERMINE THE WIND SPEED BETWEEN THE
 WIND SPEED CONTOUR LINES, SUBMIT TWO COPIES OF THE DATA
 AND CALCULATIONS THAT WERE USED. THE REQUESTED
 INFORMATION IS REQUIRED TO BEAR THE NAME AND SIGNATURE
 OF THE PERSON RESPONSIBLE FOR IT.
  
 3) THE INSTALLATION DRAWINGS FOR THE WINDOW PRODUCT
 APPROVALS (NOA NO. 12-0127.16 & NOA NO. 12-0127.08)
 REQUIRED BY DCA RULE 9N-3 ARE MISSING INFORMATION. WHEN
 PRINTED THE DRAWINGS WERE NOT SHRUNK TO FIT ON THE 8.5
 X 11 INCH PAPER THAT WAS USED. FBC 107.2.1.4
  
 4) SUBMIT TWO COPIES OF PRODUCT APPROVALS FOR THE
 STRUCTURAL WINDOW MULLIONS (LIVING ROOM WINDOWS) AND
 THE SIMPSON COLUMN BASE AND CAP CONNECTORS AS REQUIRED
 BY DCA RULE 9N-3
  
 5) THE PLANS SPECIFY A SIMPSON EPS 4Z COLUMN BASE FOR
 THE 4 X 4 REPLACEMENT COLUMNS AT THE FRONT PORCH. THIS
 CONNECTOR IS REQUIRED TO BE EMBEDDED INTO CONCRETE AND
 THE PORCH SLAB IS EXISTING. PLEASE CLARIFY THE
 INSTALLATION. FBC 107.2.1
  
 6) R319.1.4 WOOD COLUMNS. WOOD COLUMNS SHALL BE
 APPROVED WOOD OF NATURAL DECAY RESISTANCE OR APPROVED
 PRESSURE-PRESERVATIVE-TREATED WOOD.
  
  
  
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2014-09-18 Cont ID  
Sent By rmcdouga Date 2014-09-18 Time 09:10 Rev Time 0.00
Received By rmcdouga Date 2014-09-18 Time 08:43 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2014-09-08 Cont ID  
Sent By rmcdouga Date 2014-09-08 Time 15:41 Rev Time 0.00
Received By rmcdouga Date 2014-09-08 Time 06:42 Sent To  
Notes
2014-09-08 10:19:52PLAN REVIEW COMMENTS
  
  
 1ST REVIEW: FBC 2010
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 ELECTRICAL
  
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) SUBMIT TWO COPIES OF THE SPECIFICATIONS AND
 ELECTRICAL REQUIREMENTS FOR THE RTE - 7 TANKLESS WATER
 HEATER. FBC 107.2.1
  
 2) THE PANEL SCHEDULE SPECIFIES A 2 POLE 30 AMP BREAKER
 FOR THE WATER HEATER. BASED ON PAST EXPERIENCE THIS MAY
 BE TOO SMALL FOR A WHOLE HOUSE ELECTRIC WATER HEATER.
 PLEASE REVIEW THE MANUFACTURER'S SPECS. FOR
 REQUIREMENTS. NEC 422.11
  
 3) SHOW COMPLIANCE WITH NEC 440.11 AND 440.14 FOR A/C
 EQUIPMENT DISCONNECT.
  
 4) NEC 210.63 - PROVIDE A GFCI PROTECTED SERVICE OUTLET
 FOR WITHIN 25' OF MECHANICAL EQUIPMENT.
  
 5) SHOW THE LOCATION OF THE ELECTRIC METER ON THE
 PLANS.
  
 6) NEC 210.11 (C) (3) AT LEAST ONE 20 - AMP BRANCH
 CIRCUIT SHALL BE PROVIDED TO SUPPLY BATHROOM RECEPTACLE
 OUTLETS.
  
 7) NEC 210.8 GROUND - FAULT CIRCUIT - INTERRUPTER
 PROTECTION (A) (1) - (8) THE NEW RECEPTACLES SHOWN ON
 THE PLAN FOR THE BATHROOM AND THE KITCHEN (WHERE THE
 RECEPTACLES ARE INSTALLED TO SERVE THE COUNTER-TOP
 SURFACES) ARE REQUIRED TO BE GFCI PROTECTED.
  
 8) IF THE ELECTRIC SERVICE WILL BE CHANGED, IN ADDITION
 TO THE 150 AMP PANEL, PROVIDE AN ELECTRIC SERVICE RISER
 WITH WIRE SIZES, CONDUIT DETAIL AND GROUNDING DETAIL.
 FBC- 107.3.5.3
  
 IN ORDER TO REDUCE PLAN REVIEW TIMES, PLEASE SUBMIT A
 RESPONSE LETTER INDICATING HOW EACH OF THE REVIEW
 COMMENTS HAS BEEN ADDRESSED.
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2014-09-18 Cont ID  
Sent By rmcdouga Date 2014-09-18 Time 09:10 Rev Time 0.00
Received By rmcdouga Date 2014-09-12 Time 11:09 Sent To  
Notes
2014-09-13 11:09:38SENT TO R MCDOUGAL

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-09-08 Cont ID  
Sent By rmcdouga Date 2014-09-08 Time 15:42 Rev Time 0.00
Received By rmcdouga Date 2014-08-29 Time 12:08 Sent To  
Notes
2014-08-30 12:08:23R07

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2014-09-18 Cont ID  
Sent By rmcdouga Date 2014-09-18 Time 08:40 Rev Time 0.00
Received By rmcdouga Date 2014-09-17 Time 17:18 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2014-09-08 Cont ID  
Sent By rmcdouga Date 2014-09-08 Time 15:42 Rev Time 0.00
Received By rmcdouga Date 2014-09-08 Time 15:42 Sent To  
Notes
2014-09-08 17:30:56PLAN REVIEW COMMENTS
  
 1ST REVIEW: FBC 2010
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 MECHANICAL
  
 1) THE ENERGY FORM 402-2010 THAT WAS SUBMITTED APPEARS
 TO CONTAIN SO ERRORS. PLEASE CORRECT.
 - THE CONDITIONED AREA IS LISTED AS 1040 SQFT AND THE
 CEILING AREA IS LISTED AS 537 SQFT.
 - THE AIR HANDLER UNIT LOCATION IS SPECIFIED AS THE
 GARAGE. THIS PLANS SHOWS THE UNIT IN A HALL CLOSET. THE
 PLAN DOES NOT SHOW A GARAGE.
 - THE SEER IS LISTED AS 16 ON THE FORM AND THE AHRI
 CERTIFICATION THAT WAS SUBMITTED HAS A SEER RATING OF
 13.
  
 2) THE EQUIPMENT SIZING CALCULATIONS SPECIFY THE TOTAL
 COOLING REQUIRED IS 27,082 BTUH OR 2.26 TONS. THE A/C
 CHANGE OUT FORM AND THE AHRI CERTIFICATION FORM ARE FOR
 A 3 TON SYSTEM. BASED ON THE SIZING CALCULATIONS AND
 FBC ENERGY CONSERVATION SEC. 403.6.1.1, THE MAXIMUM
 COOLING EQUIPMENT SIZE IS
 403.6.1.1 COOLING EQUIPMENT CAPACITY.
 COOLING ONLY EQUIPMENT SHALL BE SELECTED SO THAT ITS
 TOTAL CAPACITY IS NOT LESS THAN THE CALCULATED TOTAL
 LOAD BUT NOT MORE THAN 1.15 TIMES GREATER THAN THE
 TOTAL LOAD CALCULATED ACCORDING TO THE PROCEDURE
 SELECTED IN SECTION 403.6, OR THE CLOSEST AVAILABLE
 SIZE PROVIDED BY THE MANUFACTURER?S PRODUCT LINES. THE
 CORRESPONDING LATENT CAPACITY OF THE EQUIPMENT SHALL
 NOT BE LESS THAN THE CALCULATED LATENT LOAD.
  
 IN ORDER TO REDUCE PLAN REVIEW TIMES, PLEASE SUBMIT A
 RESPONSE LETTER INDICATING HOW EACH OF THE REVIEW
 COMMENTS HAS BEEN ADDRESSED.

Review Stop P PLUMBING
Rev No 1 Status P Date 2014-09-08 Cont ID  
Sent By rmcdouga Date 2014-09-08 Time 07:13 Rev Time 0.00
Received By rmcdouga Date 2014-09-08 Time 06:41 Sent To  
Notes
***NONE***