Plan Review Stops For Permit 14080666 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
N |
Date |
2014-11-25 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2014-11-25 |
Time |
06:19 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2014-11-25 |
Time |
06:19 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2014-11-10 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2014-11-10 |
Time |
17:56 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2014-11-10 |
Time |
17:56 |
Sent To |
|
|
Notes |
2014-11-10 17:58:35 | CONTRACTOR PROVIDED ALL INFORMATION FOR FUTURE WORK | | (INSTALLATION OF CAR WASH EQUIPMENT) TO CLARIFY SCOPE | | UNDER THIS PERMIT. AN EMAIL WAS SENT TO THE CONTRACTOR; | | THIS PERMIT IS FOR CONCRETE WORK ONLY AND A SEPARATE | | PERMIT WILL BE REQUIRED FOR THE EQUIPMENT INSTALLATION. | | OR, CONTRACTOR CAN ADJUST VALUE TO INCLUDE CAR WASH | | EQUIPMENT AND ASSOCIATED WORK AND HAVE IT INCLUDED ON | | THIS PERMIT. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2014-09-13 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2014-09-13 |
Time |
11:40 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2014-09-13 |
Time |
11:40 |
Sent To |
|
|
Notes |
2014-09-13 11:46:45 | ****CORRECTIONS**** | | | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | 561-805-6724 | | [email protected] | | | | 1. FS471, FAC61G15-23.002, TITLE BLOCK REQUIRED FOR | | ENGINEER AND PLANS ARE TO BE SIGNED, SEALED,DATED | | ORIGINALS. | | | | 2. SOILS REPORT WILL BE REQUIRED PRIOR TO CONCRETE POUR | | PER ENGINEER, FBC 16. | | | | 3. PLANS REFER TO OTHER SHEETS WHICH WERE NOT | | SUBMITTED. PLEASE PROVIDE OR REVISE PLAN TO REMOVE | | REFERENCE. | | | | 4. PROVIDE A SITE PLAN SHOWING LOCATION OF PROPOSED | | WORK, FBC 107. | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2014-11-24 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2014-11-25 |
Time |
06:19 |
Rev Time |
0.00 |
Received By |
sciard |
Date |
2014-11-24 |
Time |
13:47 |
Sent To |
|
|
Notes |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
2 |
Status |
P |
Date |
2014-10-20 |
|
|
Cont ID |
|
Sent By |
cranford |
Date |
2014-10-20 |
Time |
13:25 |
Rev Time |
0.00 |
Received By |
cranford |
Date |
2014-10-20 |
Time |
13:24 |
Sent To |
P |
|
Notes |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
F |
Date |
2014-09-23 |
|
|
Cont ID |
|
Sent By |
Mgonzale |
Date |
2014-09-23 |
Time |
|
Rev Time |
1.00 |
Received By |
mgonzale |
Date |
2014-09-23 |
Time |
|
Sent To |
I |
|
Notes |
2014-09-23 16:14:03 | PLEASE RESPOND TO COMMENTS IN WRITING: | | | | #1 PROVIDE LOCATION MAP OF EXTENTS OF AREA WHERE | | CONCRETE WILL BE CUT. | | | | #2 NOTE PLANS "CALL 811 BEFORE DIGG" | | | | #3 PLAN IS NOT SIGNED AND SEALED BY A FLORIDA LICENSE | | PROFESSIONAL | | | | #4 PLAN SCALE IS NOT 1/4"=1'-0" IT IS 1/2"=1'-0" (PLAN | | VIEW) | | | | #5 TRENCH DIMENSIONS DO NOT MEASURE OUT TO BE CORRECT | | AS PER SCALE CALLED OUT. | | | | MANUEL JULIAN GONZALEZ | | ENGINEERING PROJECT COORDINATOR | | ENGINEERING SERVICES AND PUBLIC WORKS DEPARTMENT | | 401 CLEMATIS STREET, 4TH FLOOR | | WEST PALM BEACH, FL 33401 | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | MAIN PHONE: (561) 822-1200 | | DIRECT: (561) 494-1085 | | FAX: (561) 494-1116 | | EMAIL: [email protected] | | WWW.WPB.ORG/ENGINEERING | | | | | | | | | | | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2014-11-25 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2014-11-25 |
Time |
06:19 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2014-11-25 |
Time |
06:19 |
Sent To |
E |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2014-11-10 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2014-11-10 |
Time |
17:58 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2014-10-06 |
Time |
09:48 |
Sent To |
|
|
Notes |
2014-10-07 09:49:30 | RE-SUBMITTAL SENT TO B5 SHELF FOR REVIEW. JG. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
|
|
|
Cont ID |
|
Sent By |
mgonzale |
Date |
2014-09-23 |
Time |
16:14 |
Rev Time |
0.00 |
Received By |
wlehnhar |
Date |
2014-08-14 |
Time |
14:25 |
Sent To |
|
|
Notes |
2014-09-13 11:47:50 | B13 | | | 2014-08-14 14:25:29 | ZONING | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
4 |
Status |
N |
Date |
2014-11-25 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2014-11-25 |
Time |
06:18 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2014-11-25 |
Time |
06:18 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
P |
Date |
2014-11-07 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2014-11-07 |
Time |
10:28 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2014-11-07 |
Time |
10:28 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
F |
Date |
2014-10-21 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2014-10-21 |
Time |
14:44 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2014-10-21 |
Time |
14:44 |
Sent To |
|
|
Notes |
2014-10-21 14:47:07 | THE SUBMITTED PLAN IS ONLY FOR STRUCTURAL. SUBMIT A | | COMPLETE SET OF PLANS FOR THE CAR WASH SYSTEM FOR | | REVIEW. WPB AMEND. TO 2010 FBC SEC. 107.2.1. | | | | PLUMBING PLAN REVIEW | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | 561-805-6692 | | [email protected] | | | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2014-09-24 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2014-09-24 |
Time |
12:44 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2014-09-24 |
Time |
12:44 |
Sent To |
|
|
Notes |
2014-09-24 12:55:07 | 1) THE PLAN REFERS TO OTHER DRAWINGS AND | | SPECIFICATIONS. SUBMIT ALL DRAWINGS AND SPECS FOR THE | | SCOPE OF WORK TO BE DONE UNDER THIS PERMIT APPLICATION. | | WPB AMEND. TO 2010 FB SEC. 107.2.1. | | 2) PLANS SHALL BEAR THE TITLE BLOCK, SEAL AND SIGNATURE | | OF THE ENGINEER OF RECORD PER FL. STATUTE 471 & THE FL. | | ADMIN. CODE RULE 61G15-23.002, | | 3) SUBMIT A SITE PLAN THAT SHOWS THE LOCATION OF WHERE | | THE WORK IS BEING DONE. WPB AMEND. TO 2010 FBC SEC. | | 107.2.1. | | | | PLUMBING PLAN REVIEW | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | 561-805-6692 | | [email protected] | | | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
P |
Date |
2014-10-09 |
|
|
Cont ID |
|
Sent By |
sgraham |
Date |
2014-10-09 |
Time |
16:15 |
Rev Time |
0.00 |
Received By |
sgraham |
Date |
2014-10-09 |
Time |
16:15 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2014-08-14 |
|
|
Cont ID |
|
Sent By |
sgraham |
Date |
2014-08-14 |
Time |
15:46 |
Rev Time |
0.00 |
Received By |
sgraham |
Date |
2014-08-14 |
Time |
15:46 |
Sent To |
B |
|
Notes |
2014-08-14 15:46:06 | 8/14/14 ZONING FAILED | | | | 1. PROVIDE TWO UP TO DATE SURVEYS OF THE PROPERTY, | | HIGHLIGHT THE AREA OF THE NEW CONCRETE. |
|
|