Plan Review Stops For Permit 14070986 |
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
P |
Date |
2014-07-29 |
|
|
Cont ID |
|
Sent By |
cranford |
Date |
2014-07-29 |
Time |
09:28 |
Rev Time |
0.25 |
Received By |
cranford |
Date |
2014-07-29 |
Time |
09:27 |
Sent To |
I |
|
Notes |
2014-07-29 09:27:40 | CONSTRUCTION WITHIN RIGHT-OF-WAY TO MEET STANDARD | | DETAIL GC-7. | | HTTP://WPB.ORG/ENGINEERING/ENGINEERING-SERVICES/ENGINEE | | RING-STANDARDS/ | | | | ALTHOUGH THE PROPOSED SEPARATION DISTANCE BETWEEN | | ACCESS POINTS IS LESS THAN THE 125 FT SPECIFIED IN | | SECTION 94-313 OF THD CODE OR ORDINANCES. THE | | ENGINEERING DEPARTMENT HAS DETERMINED THAT ALTERNATIVE | | SPACING IS ACCEPTABLE FOR THIS LOT IN ACCORDANCE WITH | | SUBSECTION (3). |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2014-07-31 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2014-07-31 |
Time |
14:12 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2014-07-25 |
Time |
17:02 |
Sent To |
|
|
Notes |
2014-07-25 17:03:02 | REVISION SENT TO ZONING SHELF FOR REVIEW. JG. |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2014-07-28 |
|
|
Cont ID |
|
Sent By |
sgraham |
Date |
2014-07-28 |
Time |
15:10 |
Rev Time |
0.00 |
Received By |
sgraham |
Date |
2014-07-28 |
Time |
15:10 |
Sent To |
ENG |
|
Notes |
|
|
|