2014-07-14 14:54:29 | 7/14/14 |
| ADDITIONAL COMMENTS AFTER MEETING WITH CONTRACTOR TO GO |
| OVER COMMENTS. |
| |
| (1) EXISTING ROOF DRAINS ARE GOING TO BE REMOVED. NEED |
| TO PROVIDE PLANS SHOWING COMPLIANCE WITH THE ROOF |
| DRAINAGE SEC. 1503.4 OF 2010 FBC-BUILDING. ***NOTE: |
| PERMIT OBTAINED BY THE GENERAL CONTRACTOR TO DO THE |
| DAYCARE RENOVATION DOESN'T INCLUDE REMOVAL OF THE ROOF |
| DRAINS AND DOESN'T INCLUDE THE STRUCTURAL ROOF REPAIRS. |
| NEED TO PROVIDE COMPLETE DRAWINGS AND SPECIFICATIONS |
| UNDER A REVISION TO PERMIT 13100594 OR PROVIDE COMPLETE |
| INFORMATION UNDER SEPARATE BUILDING AND PLUMBING |
| PERMITS. |
| |
| |
| BELOW ARE THE ORIGINAL COMMENTS DATED 7/7/14: |
| |
| |
| RE-ROOF BUILDING REVIEW COMMENTS. |
| CODE: 2010 FBC. |
| |
| 1- TAS 105 FASTENER WITHDRAWAL TEST REPORT SUBMITTED: |
| A) ROOF SKETCH SUBMITTED DOESN'T MATCH ACTUAL ROOF DECK |
| SHOWN ON THE PROPERTY APPRAISAL WEBSITE. REVISE AS |
| REQUIRED. SEC. 107.2.1 CITY AMENDMENTS TO FBC AND SEC. |
| 10.1.9 OF TAS 105-11. |
| |
| B) NEED AT LEAST 3 TESTS TO BE PERFORMED IN THE CORNER |
| AREA AS REQUIRED BY SEC. 8.1 OF TAS 105-11. THE FIELD |
| WITHDRAWAL RESISTANCE TEST RECORDING SHEET SHOWS ONLY |
| TWO TEST DONE IN THE CORNER AREA. BUT, THE ROOF SKETCH |
| SHOWING THE TEST LOCATIONS ONLY SHOW ONE TEST IN THE |
| CORNER AREA (TEST T-2). ALSO, TEST #4 IS NOT IN A |
| CORNER AREA. REVISE EVERYTHING AS REQUIRED TO MATCH. |
| |
| C) IF MORE THAN 25% OF THE ROOF SYSTEM IS TO BE |
| RE-ROOF, THEN, ENTIRE ROOF NEEDS TO BE RE-ROOFED. SEC. |
| 611.1.1 OF 2010 FBC-EXISTING BUILDING CODE. ALSO, |
| NUMBER OF PULL OUT TEST SHALL BE CONDUCTED ACCORDINGLY. |
| SEC. 8 OF TAS 105-11. |
| |
| D) CONTRACTOR SPECIFIED ON PERMIT APPLICATION RE-ROOF |
| WITH TAMKO PONDING WATER SPECS. TEST NEED TO IDENTIFY |
| THE PONDING WATER LOCATIONS AS REQUIRED BY SEC. 8.4 OF |
| TAS 105-11. |
| |
| 2) TAS 105 REPORT SHOWS AREAS WERE THE ROOF DECK IS |
| BAD. NEED STRUCTURAL SUB-PERMIT TO PERFORM THE DECK |
| REPAIRS. PROVIDE COMPLETE DETAILS/ SPECIFICATIONS FOR |
| DECK REPAIRS. SEC. 107.2.1 CITY AMENDMENTS TO FBC. |
| CONTRACTOR DOING THE DECK REPAIRS TO HAVE PROPER |
| LICENSE AS REQUIRED BY SEC. 489.113 FLORIDA STATUTES. |
| |
| 3- RAS 117 CALCULATIONS SUBMITTED: ENGINEER TO REVISE |
| THE SPACING OF THE NAILS AT THE SIDE LAP. NEED TO MATCH |
| THE SPACING SHOWING ON OPTION #3 OF PAGE 11 OF THE NOA |
| 12-0716.14 SUBMITTED. REVISE CALCULATIONS ACCORDINGLY. |
| THIS IS REQUIRED BY SEC. 8.1 OF RAS 117. |
| |
| 4- ROOF NEEDS POSITIVE DRAINAGE AS REQUIRED BY |
| EXCEPTION ON SEC. 611.1 OF 2010 FBC-EXISTING BUILDING |
| CODE. |
| |
| ***NOTES: |
| **** MOISTURE SURVEY TEST MAY BE REQUIRED. SEE ITEM |
| 1(D) ABOVE. |
| |
| IF YOU HAVE ANY QUESTIONS, PLEASE CALL |
| JULIO GOMEZ |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| DEVELOPMENT SERVICES DEPARTMENT |
| (561)805-6712 |