|
 |
 |
 |
 |
 |
Plan Review Details - Permit 14051041
Plan Review Stops For Permit 14051041 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
F |
Date |
2014-09-22 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2014-09-22 |
Time |
18:39 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2014-09-22 |
Time |
18:39 |
Sent To |
|
|
Notes |
2014-09-22 18:43:13 | ****CORRECTIONS**** | | | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | 561-805-6724 | | [email protected] | | | | 1. ORIGINAL APPLICATION HAD TWO PRODUCT APPROVALS. I | | REVIEWED ONE AS TWO SETS ARE REQUIRED. THE ONE PRODUCT | | APPROVAL WHICH WAS REVIEWED WAS FOR IMPACT SINGLE HUNG | | WINDOWS. | | | | I DID NOT REVIEW THE OTHER PRODUCT APPROVAL, WHICH I | | THOUGHT WAS THE SECOND COPY. HOWEVER, THAT PRODUCT | | APPROVAL IS FOR A NON IMPACT PRODUCT AND PLANS NOW | | SPECIFY A NON IMPACT PRODUCT. STORM PANEL PRODUCT | | APPROVALS HAVE ALSO BEEN SUBMITTED. | | | | FOR THE SHUTTERS, COMPLETE THE SAMPLE INSTALLATION | | SCHEDULE OR PROVIDE ALL INFORMATION TO SHOW CODE | | COMPLIANCE IN ANOTHER FORMAT, FBC*106, FBC R301, | | FBC1609. TWO SETS REQUIRED. THIS FORM IS AVAILABLE IN | | THE LOBBY OR ON THE INTERNET AT | | | | HTTP://WPB.ORG/DEVELOPMENT/WP-CONTENT/UPLOADS/SITES/33/ | | 2013/09/SCHEDULE_FOR_INSTALLATION.PDF | | | | 2. TWO COMPLETE SETS OF PERMIT DOCUMENTS REQUIRED FOR | | PERMIT ISSUANCE. PROVIDE A SECOND COPY OF THE WINDOW | | PRODUCT APPROVAL. | | | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2014-07-10 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2014-07-10 |
Time |
14:41 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2014-07-10 |
Time |
14:41 |
Sent To |
|
|
Notes |
2014-07-10 14:43:00 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | 1. REVISE FLOOR PLAN TO PROVIDE THE FOLLOWING | | INFORMATION FOR BEDROOMS; FBC R310, FBC EB 604.1. THE | | CLEAR OPENING CANNOT BE REDUCED BY MORE THAN 5%: | | | | REVISE PLAN TO STATE WHAT TYPE OF WINDOW IS THERE NOW | | IN THE BEDROOMS - AWNING, CASEMENT, SINGLE HUNG? | | | | REVISE PLAN TO STATE WHAT THE EXISTING CLEAR OPENING | | DIMENSIONS ARE. CLEAR OPENING IS THE OPENING WHICH | | EXISTS WHEN THE WINDOW IS FULLY OPEN. | | | | REVISE PLAN TO STATE WHAT THE PROPOSED CLEAR OPENING | | DIMENSIONS ARE. THIS CAN BE OBTAINED FROM THE | | MANUFACTURER | | | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2014-06-17 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2014-06-17 |
Time |
15:19 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2014-06-17 |
Time |
15:19 |
Sent To |
|
|
Notes |
2014-06-17 15:20:40 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | 1. PROVIDE A FLOOR PLAN SHOWING: WINDOW LOCATIONS, | | SIZES, WINDOW TYPE, ROOM DESIGNATIONS. NOTE EXISTING | | CONDITIONS (TYPE OF WINDOW) AND OPENING SIZE FOR | | BEDROOMS, FBC R310, FBC EB 604.1. THE CLEAR OPENING | | CANNOT BE REDUCED BY MORE THAN 5%. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2015-08-18 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2015-08-18 |
Time |
11:08 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2015-08-14 |
Time |
08:59 |
Sent To |
|
|
Notes |
2015-08-18 11:09:19 | 8/18 SENT EMAIL TO CONTRACTOR; RESUBMITTAL FORM | | REQUIRED FOR RESUBS. TWO COLLATED PACKAGES REQUIRED. | | | 2015-08-17 08:59:25 | RESUB ROUTED TO SHILL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2014-09-22 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2014-09-22 |
Time |
18:43 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2014-09-10 |
Time |
11:43 |
Sent To |
|
|
Notes |
2014-09-11 11:43:48 | TO SH DESK | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2014-07-10 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2014-07-10 |
Time |
14:43 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2014-07-08 |
Time |
17:21 |
Sent To |
|
|
Notes |
2014-07-08 17:21:58 | TO SH DESK | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2014-06-17 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2014-06-17 |
Time |
15:20 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2014-05-29 |
Time |
16:09 |
Sent To |
|
|
Notes |
2014-05-30 16:10:01 | SENT TO BUILDING UNDER $5000 SHELF FOR REVIEW. JG. |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |