Plan Review Details - Permit 14050306
Plan Review Stops For Permit 14050306
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2014-05-29 Cont ID  
Sent By skennedy Date 2014-05-29 Time 13:23 Rev Time 0.00
Received By skennedy Date 2014-05-29 Time 13:23 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2014-05-17 Cont ID  
Sent By shill Date 2014-05-17 Time 11:46 Rev Time 0.00
Received By shill Date 2014-05-17 Time 11:46 Sent To  
Notes
2014-05-17 12:01:30****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. AN ATTEMPT WAS MADE TO COMPLETE OR CORRECT THE
 SHUTTER INSTALLATION SCHEDULES, BUT SUBSTRATE CANNOT BE
 DETERMINED. THE CLEAR PANEL INSTALLATION STATES THAT
 THE SUBSTRATE IS CONCRETE, BUT THE OTHER TWO SCHEDULES
 STATE THAT THE SUBSTRATE IS BLOCK. AS THE ACTUAL
 SUBSTRATE CANNOT BE DETERMINED AT THIS TIME, A COMPLETE
 REVIEW CANNOT BE PERFORMED.
  
 MOST STRUCTURES OF CBS CONSTRUCTION HAVE A SUBSTRATE OF
 CONCRETE AT THE TOP, FILLED BLOCK AT THE BOTTOM (CBS).
 SOME HOUSES WERE BUILT WITH THE ROYAL WALL SYSTEM,
 WHICH WOULD BE CONCRETE TOP AND BOTTOM. IF JOB
 CONDITIONS REQUIRE THAT THE TOP MOUNTING IS ABOVE THE
 LINTEL, THE SUBSTRATE AT THE TOP WOULD ALSO BE BLOCK.
 GROUT FILLED BLOCK WOULD BE "MASONRY" SUBSTRATE UNLESS
 THE PRODUCT APPROVAL INCLUDES GROUT FILLED BLOCK.
  
 2. CLEAR PANEL INSTALLATION SCHEDULE WAS NOT COMPLTED.
 I ATTEMPTED TO COMPLETE THIS INFORMATION FOR YOU BASED
 ON HIGHLIGHTED INFORMATION ON THE PRODUCT APPROVAL, BUT
 IT IS NOT CLEAR WHY ALL OF THE OPENINGS FOR THE CLEAR
 PANELS ARE CONCRETE, BUT NOT FOR OTHER OPENINGS.
  
 COMPLETE THE INSTALLATION SCHEDULE FOR THE CLEAR
 PANELS.
  
 2. THE FLORIDA PRODUCT APPROVAL REFERRED TO ON ALL OF
 THE INSTALLATION SCHEDULES IS 5133, BUT THIS PRODUCT
 APPROVAL WAS NOT SUBMITTED. PLEASE REVISE TO REFER TO
 THE CORRECT PRODUCT APPROVAL.
  
 3. FOR THE ACCORDION SHUTTERS, THE SHUTTER CONNECTION
 MOUNTING TYPE SHOULD CORRELATE WITH THE ANCHOR CHARTS.
 FOR INSTANCE, INSTALLATION SCHEDULE FOR OPENING 1
 STATES "CEILING/WALL". SEE SHEETS 12 THROUGH 14,
 MOUNTING TYPES ARE NAMED "A" THROUGH "L". MANY THINGS
 ARE HIGHLIGHTED IN THE CHARTS, BUT NOTHING HIGHLIGHTED
 FOR G, THE ONLY MOUNTING TYPE WITH A "CEILING"
 DESCRIPTION. SOME OF THE ITEMS HIGHLIGHTED REQUIRE A
 CONCRETE SUBSTRATE, BUT BLOCK IS STATED AS SUBSTRATE.
  
 4. FOR THE PANEL, OPENING 25, MOUNTING TYPE PROPOSED IS
 "75". SEE ANCHOR CHARTS, NAMING CONVENTION USES NUMBERS
 FROM 1 THROUGH 13, ALONG WITH ALTERNATIVES.
  
 IF YOU WISH TO HAVE A MEETING TO GO OVER ALL OF THESE
 ITEMS AND GUIDANCE AS TO HOW TO COMPLETE THIS FORM,
 FEEL FREE TO CONTACT ME TO SCHEDULE. QUALIFER MUST BE
 PRESENT AT THIS MEETING, AND ANY OTHER STAFF MEMBERS
 ARE WELCOME.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-05-17 Cont ID  
Sent By shill Date 2014-05-17 Time 12:01 Rev Time 0.00
Received By shill Date 2014-05-08 Time 13:51 Sent To  
Notes
2014-05-08 13:51:56ROUTED TO MISC 1