Plan Review Stops For Permit 14050052 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2014-05-28 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2014-05-28 |
Time |
13:14 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2014-05-28 |
Time |
13:07 |
Sent To |
NFIP |
|
Notes |
2014-05-28 13:14:55 | TO SH FOR FLOOD REVIEW |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2014-05-27 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2014-05-27 |
Time |
13:41 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2014-05-27 |
Time |
13:42 |
Sent To |
|
|
Notes |
2014-05-27 13:52:59 | 1ST REVIEW: | | | | 1) SURVEY PROVIDED INDICATES FLOOD ZONE IS AN A-6; FIRM | | MAP 120229 001 B INDICATES A5, AND DOES NOT ESTABLISH | | THE PROPOSED FINISH FLOOR ELEVATION. | | SEE 107.2.5.1 DESIGN FLOOD ELEVATIONS. WHERE DESIGN | | FLOOD ELEVATIONS ARE NOT SPECIFIED, THEY | | SHALL BE ESTABLISHED IN ACCORDANCE WITH SECTION | | 1612.3.1. | | 2) PROVIDE DETAILS FOR FLOOD RESISTANCE CONSTRUCTION | | TECHNIQUES TO BE INCORPORATED IN THE STEM WALL AT THE | | CRAWL SPACE AREA. | | SEE 1612.5 FLOOD HAZARD DOCUMENTATION. | | THE FOLLOWING DOCUMENTATION SHALL BE PREPARED AND | | SEALED BY A REGISTERED DESIGN PROFESSIONAL AND SHALL BE | | SUBMITTED TO THE BUILDING OFFICIAL: | | 1. FOR CONSTRUCTION IN FLOOD HAZARD AREAS NOT SUBJECT | | TO HIGH-VELOCITY WAVE ACTION: | | 1.1 THE ELEVATION OF THE LOWEST FLOOR, INCLUDING | | BASEMENT, AS REQUIRED BY THE FOUNDATION INSPECTION AND | | THE FINAL INSPECTION IN SECTION 110.3. | | 1.2. FOR FULLY ENCLOSED AREAS BELOW THE DESIGN FLOOD | | ELEVATION WHERE PROVISIONS TO ALLOW FOR THE AUTOMATIC | | ENTRY AND EXIT OF FLOODWATERS DO NOT MEET THE MINIMUM | | REQUIREMENTS IN SECTION 2.6.2.1, ASCE 24, CONSTRUCTION | | DOCUMENTS SHALL INCLUDE A STATEMENT THAT THE DESIGN | | WILL PROVIDE FOR EQUALIZATION OF HYDROSTATIC FLOOD | | FORCES IN ACCORDANCE WITH SECTION 2.6.2.2 OF ASCE 24. | | 1.3. FOR DRY FLOODPROOFED NONRESIDENTIAL BUILDINGS, | | CONSTRUCTION DOCUMENTS SHALL INCLUDE A STATEMENT THAT | | THE DRY FLOODPROOFING IS DESIGNED IN ACCORDANCE WITH | | ASCE 24. | | | | 3) FBC 107.3.4 - PROVIDE PRODUCT APPROVALS FOR THOSE | | PRODUCTS WHICH ARE REGULATED BY | | DCA RULE 9N-3 REVIEWED AND APPROVED IN WRITING BY THE | | DESIGNER OF RECORD. SPECIFICALLY, PROVIDE ROOFING, | | WINDOW, AND DOOR SUBMITTALS | | | | STEVEN KENNEDY, CBO | | CHIEF PLANS EXAMINER | | (561) 805-6710 | | [email protected] | | | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2014-05-19 |
|
|
Cont ID |
|
Sent By |
albarran |
Date |
2014-05-19 |
Time |
19:33 |
Rev Time |
0.00 |
Received By |
albarran |
Date |
2014-05-19 |
Time |
18:35 |
Sent To |
|
|
Notes |
2014-05-19 20:09:07 | ELECTRICAL PROVIO FOR PERMIT 14050052 | | THOUGH NOT REFLECTED ON THE SUBMITTED/APPROVED | | DRAWINGS, COMPLIANCE WITH THE OUTLET & LUMINAIRE | | REQUIREMENTS OF THE 2008 NEC SHALL BE REQUIRED. | | ARC-FAULT AS PER NEC 210.12 & TAMPER-RESISTANT | | RECEPTACLE AS PER NEC 406.11 SHALL BE REQUIRED. | | SMOKE DETECTORS COMPLIANCE AS PER FBC-R 314/315 | | REQUIRED. | | AS PER NEC 300.5. THE INTERIOR OF A RACEWAY | | | | |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
P |
Date |
2014-05-28 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2014-05-28 |
Time |
13:36 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2014-05-28 |
Time |
13:36 |
Sent To |
|
|
Notes |
2014-05-28 13:39:59 | A REVISED RISER FOR THE TANKLESS HEATER, WITH LOCATION | | AND SPEC SHEET IS REQUIRED. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2014-05-29 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2014-05-29 |
Time |
15:40 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2014-05-28 |
Time |
13:06 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2014-05-27 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2014-05-27 |
Time |
13:41 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2014-05-02 |
Time |
09:56 |
Sent To |
|
|
Notes |
2014-05-02 09:57:26 | ****EXPEDITED**** | | | | R14 | | |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
2 |
Status |
P |
Date |
2014-05-28 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2014-05-28 |
Time |
13:07 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2014-05-28 |
Time |
13:07 |
Sent To |
|
|
Notes |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
1 |
Status |
F |
Date |
2014-05-27 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2014-05-27 |
Time |
13:41 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2014-05-27 |
Time |
13:41 |
Sent To |
|
|
Notes |
2014-05-27 13:42:15 | | | IMPACT FEE ASSESSMENT BY PALM BEACH COUNTY REQUIRED. | | AFTER APPROVAL, A SET OF THE PLANS ARE TO BE CHECKED | | OUT AND TAKEN TO THE PBC IMPACT FEE OFFICE, STAMPED BY | | THAT OFFICE, AND RETURNED WITH A RECEIPT PROVIDED. | | CONTACT 561 233 5100. | | | | |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
P |
Date |
2014-05-27 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2014-05-27 |
Time |
13:41 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2014-05-27 |
Time |
13:41 |
Sent To |
|
|
Notes |
|
|
Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
Rev No |
1 |
Status |
P |
Date |
2014-05-29 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2014-05-29 |
Time |
15:35 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2014-05-29 |
Time |
15:35 |
Sent To |
|
|
Notes |
2014-05-29 15:40:27 | CUMULATIVE LIFETIME IMPROVEMENTS (INCLUDING PROPOSED | | ADDITION UNDER THIS PERMIT) = $146,162 | | ADDITION IS 294 SF ($272/SF) | | PAPA IMPROVEMENT VALUE IS $302,177 (WHICH IS LIKELY | | VERY LOW FOR THIS 5400 SF HOME PURCHASED FOR | | $2,800,000. | | | | CUMULATIVE LIFETIME IMPROVEMENTS IS AT 48%; THEREFORE, | | THIS IS NOT A SUBSTANTIAL IMPROVEMENT. | | | | THE ELEVATION CERTIFICATE PROVIDED FOR THE EXISTING | | STRUCTURE SHOWS TOP OF BOTTOM FLOOR AT 9.2' (BFE IS | | 7'). ADDITION WILL MATCH THE FFE OF THE EXISTING HOUSE. | | | | WORKSHEET HAS BEEN ADDED TO PERMIT FILE. | | | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2014-05-27 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2014-05-27 |
Time |
13:41 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2014-05-27 |
Time |
13:41 |
Sent To |
|
|
Notes |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
1 |
Status |
P |
Date |
2014-05-28 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2014-05-28 |
Time |
13:15 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2014-05-28 |
Time |
13:15 |
Sent To |
|
|
Notes |
2014-05-28 13:15:31 | ROOFING |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2014-05-06 |
|
|
Cont ID |
|
Sent By |
dkittred |
Date |
2014-05-06 |
Time |
16:20 |
Rev Time |
0.00 |
Received By |
dkittred |
Date |
2014-05-06 |
Time |
15:35 |
Sent To |
|
|
Notes |
2014-05-06 16:20:06 | PLANNING AND ZONING COMMENTS: | | | | 5/6/2014 | | | | 1. TREE ALTERATION PERMIT IS REQUIRED THROUGH THE | | PLANNING DIVISION IF ANY TREES WILL NEED TO BE REMOVED | | OR RELOCATED FOR THE NEW CONSTRUCTION. | | | | 2. SEPARATE PERMIT IS REQUIRED FOR THE PROPOSED POOL. | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT: | | | | DANIELLE J. KITTREDGE, AICP | | SENIOR PLANNER | | PLANNING & ZONING DIVISION | | PHONE: (561)-822-1443 | | EMAIL: [email protected] | | | 2014-05-06 14:44:33 | 5/6/14 |
|
|