Plan Review Details - Permit 14041098
Plan Review Stops For Permit 14041098
Review Stop AD ADDRESSING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
2014-04-30 17:36:18SENT E-MAIL TO SCOTT ALEF REQUESTING ADDRESS

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2014-12-24 Cont ID  
Sent By skennedy Date 2014-12-24 Time 08:37 Rev Time 0.00
Received By skennedy Date 2014-12-24 Time 08:37 Sent To  
Notes
2014-12-24 08:39:29FBC 2010
  
 THE APPLICANT RE-SUBMITTED A RESPONSE LETTER ON
 12/23/14 DATED 12/15/14 AND SIGNED BY JOHN CAIRNES OF
 MOCK ROOS. THE LETTER INDICATED FULL SETS OF UPDATED
 PLANS WERE PROVIDED. HOWEVER, NO PLANS WERE, IN FACT,
 SUBMITTED. I ADVISED JOHN AS FOLLOWS:
  
 PROVIDE REVISED DRAWINGS SIGNED AND SEALED.
 PROVIDE PERMIT APPLICATIONS FOR:
 SUB ELECTRIC
 FENCE
 LANDSCAPING
 IRRIGATION IF APPLICABLE.
 PROVIDE INFORMATION AS TO THE APPROPRIATE ADDRESS OF
 THE WELLS AND THE ELECTRICAL SERVICE AND PROVIDE THE
 PARCEL CONTROL. WORK WITH CITY ADDRESSING PERSON AS
 NEEDED.
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2014-05-15 Cont ID  
Sent By albarran Date 2014-05-15 Time 12:50 Rev Time 0.00
Received By albarran Date 2014-05-15 Time 11:39 Sent To  
Notes
2014-05-15 12:52:11ALL SERVICES SHALL COMPLY WITH NEC SECTION 682 WITH
 RELATION TO THE ELECTRICAL DATUM PLANE.
  
 THESE PLANS WERE REVIEWED BY MIKE ALBARRAN, ELECTRICAL
 PLANS EXAMINER
 YOU ARE WELCOME TO REVIEW STATUS OR COMMENTS AT THE
 FOLLOWING LINK:
  
 HTTP://ONESTOPSHOP.WPBGOV.COM/EGOVPLUS/PERMIT/PERM_STAT
 US.ASPX
  
 ENTER YOUR PERMIT NUMBER (SEE SUBJECT LINE OF THIS
 EMAIL FOR YOUR PERMIT #), CLICK ON THE PERMIT NUMBER,
 THEN GO TO "PLAN REVIEWS" TO SEE YOUR COMMENTS (TAB
 ABOVE THE SECOND PERMIT INFORMATION).
 AFTER ISSUANCE, PLEASE CHECK YOUR PLAN CAREFULLY TO SEE
 IF THERE ARE ANY REDLINES, NOTES, PROVISOS, OR OTHER
 PERMIT CONDITIONS.
 FOR FURTHER ASSISTANCE, PLEASE FEEL FREE TO CONTACT ME.
 I CAN BE REACHED AT 561-805-6718 OR
 [email protected]

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2014-07-25 Cont ID  
Sent By cranford Date 2014-07-25 Time 15:05 Rev Time 4.00
Received By cranford Date 2014-07-25 Time 10:46 Sent To I
Notes
2014-07-25 13:31:09ENGINEERING DEPARTMENT COMMENTS
 1. THE SUBMITTED PLANS WERE NOT SIGNED OR SEALED.
 PLEASE SUBMIT SIGNED AND SEALED PLANS FOR FINAL
 APPROVAL.
  
 2. PLEASE SUBMIT EROSION CONTROL AND STORMWATER
 POLLUTION PREVENTION PLANS.
  
 3. ARE THERE ANY WETLANDS WITHIN THE PROJECT AREA?
 EXHIBIT 4A TO ADJACENT PERMIT 50-04856-P SHOWS A
 WETLAND ALONG THE SOUTH SIDE OF THE CANAL, EXTENDING
 WEST FROM MILITARY TRAIL. PLEASE IDENTIFY ANY ON-SITE
 WETLANDS AND INDICATE HOW THE PROJECT WILL COMPLY WITH
 SECTION 94-375 OF THE CODE OF ORDINANCES.
  
 4. PLEASE DEMONSTRATE THAT THE PROJECT WILL PROVIDE
 ADEQUATE DRAINAGE AND STORMWATER MANAGEMENT. COMPLIANCE
 WITH CHAPTER 40E-4 WILL DEMONSTRATE COMPLIANCE WITH
 THIS PROVISION [SECTIONS 90-201, 94-35(C )(11), AND
 94-307].
  
 5. DEMONSTRATE THAT THE PROPOSED FILL WILL NOT DIMINISH
 THE CARRYING CAPACITY OF THE M CANAL. (SECTION 94-843
 CODE OF ORDINANCES)
  
 KELLY CRANFORD, P.E.
 LAND DEVELOPMENT ENGINEER
 ENGINEERING & PUBLIC WORKS DEPARTMENT
 CITY OF WEST PALM BEACH
 (561)494-1098
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2014-12-24 Cont ID  
Sent By skennedy Date 2014-12-24 Time 08:07 Rev Time 0.00
Received By skennedy Date 2014-12-24 Time 08:07 Sent To  
Notes
2014-12-24 08:37:46THE APPLICANT RE-SUBMITTED A RESPONSE LETTER ON
 12/23/14 DATED 12/15/14 AND SIGNED BY JOHN CAIRNES OF
 MOCK ROOS. THE LETTER INDICATED FULL SETS OF UPDATED
 PLANS WERE PROVIDED. HOWEVER, NO PLANS WERE, IN FACT,
 SUBMITTED. I ADVISED JOHN AS FOLLOWS:
  
 PROVIDE REVISED DRAWINGS SIGNED AND SEALED.
 PROVIDE PERMIT APPLICATIONS FOR:
 SUB ELECTRIC
 FENCE
 LANDSCAPING
 IRRIGATION IF APPLICABLE.
 PROVIDE INFORMATION AS TO THE APPROPRIATE ADDRESS OF
 THE WELLS AND THE ELECTRICAL SERVICE AND PROVIDE THE
 PARCEL CONTROL. WORK WITH CITY ADDRESSING PERSON AS
 NEEDED.
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-07-28 Cont ID  
Sent By shill Date 2014-07-28 Time 11:15 Rev Time 0.00
Received By shill Date 2014-04-30 Time 06:35 Sent To  
Notes
2014-05-01 06:37:05INCOMING C05 . JW

Review Stop P PLUMBING
Rev No 1 Status N Date 2014-05-24 Cont ID  
Sent By jgomez Date 2014-05-24 Time 11:03 Rev Time 0.00
Received By jwitmer Date 2014-05-24 Time 10:47 Sent To  
Notes
2014-05-24 11:05:18WELL AND PIPING ARE PROCESSING SYSTEM NOT PART OF A
 PLUMBING SYSTEM REGULATED BY THE FBC-PLUMBING. JW

Review Stop Z ZONING
Rev No 1 Status F Date 2014-05-06 Cont ID  
Sent By jroach Date 2014-05-06 Time 11:24 Rev Time 0.00
Received By jroach Date 2014-05-06 Time 11:24 Sent To  
Notes
2014-05-06 11:24:56ZONING PLAN REVIEW
 ___________________________________________
  
 DATE OF REVIEW: 05.06.2014
 PERMIT NO.: 14041098
 ADDRESS: 1009 BANYAN BOULEVARD
 CONTRACTOR/CONTACT: JOHN CAIRNES
 TELEPHONE NO.: 561.371.5695
 SCOPE OF REVIEW: WELLFIELD
 ___________________________________________
  
 REVIEW STATUS: FAILED
 ___________________________________________
  
 PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING PLAN
 REVIEW COMMENTS:
  
 1. PRIOR TO THE REMOVAL OF ANY TREES, A TREE ALTERATION
 PERMIT SHALL BE OBTAINED FROM THE DEVELOPMENT SERVICES
 DEPARTMENT ? PLANNING DIVISION. MITIGATION LIKELY WILL
 BE REQUIRED.
  
 2. THE PLANNING DIVISION WOULD LIKE TO WORK WITH
 UTILITIES STAFF REGARDING THE POSSIBLE CONSTRUCTION OF
 A RECREATIONAL PATH IN CONNECTION WITH THE PROPOSED
 WELLFIELD WORK. THE PROPOSED ACCESS PATH COULD BE
 EXTENDED TO MILITARY TRAIL, PROVIDE FOR AN EXPANSION OF
 THE EXISTING APOXEE TRAIL, PROVIDE AN OPPORTUNITY FOR A
 TRAILHEAD ON MILITARY TRAIL AND/OR HAVERHILL ROAD, ETC.
  
 3. IN CONNECTION WITH THE COMMENT PROVIDED ABOVE AND
 ANY OPPORTUNITY FOR PUBLIC ACCESS ALONG THE M-CANAL,
 CONSIDERATION SHOULD BE MADE TO LANDSCAPE AROUND THE
 OUTSIDE OF THE FENCING AT EACH WELL HEAD SITE.
  
 4. IS 100% OF THE VEGETATION TO BE REMOVED WITHIN THE
 LIMITS? IS THERE ANY CONSIDERATION TO LEAVE SOME OF THE
 NATIVE VEGETATION ON THE NORTH AND SOUTH SIDES OF THE
 ACCESS ROAD, ETC.?
  
 PLEASE CONTACT ME TO DISCUSS THESE COMMENTS FURTHER. I
 BELIEVE IT WOULD BE BENEFICIAL FOR THE PLANNING
 DIVISION TO SIT DOWN WITH UTILITIES STAFF AND DISCUSS
 THE OPPORTUNITIES THAT MAY EXIST WITH THE PROPOSED
 CONSTRUCTION ACTIVITIES.
  
 ___________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 ___________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 JOHN ROACH, PRINCIPAL PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 PHONE: 561.822.1448
 FAX: 561.822.1460
  
 EMAIL: [email protected]
  
 WWW.WPB.ORG
  
2014-05-02 16:09:225/2/14


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved