Plan Review Details - Permit 14040102
Plan Review Stops For Permit 14040102
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2014-05-21 Cont ID  
Sent By skennedy Date 2014-05-21 Time 05:46 Rev Time 0.00
Received By skennedy Date 2014-05-21 Time 05:18 Sent To ENG
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2014-04-26 Cont ID  
Sent By shill Date 2014-04-26 Time 16:15 Rev Time 0.00
Received By shill Date 2014-04-26 Time 16:15 Sent To  
Notes
2014-04-26 16:17:40****CORRECTIONS****
 SAMANTHA HILL, BUILDING PLANS EXAMINER
 561-805-6724 [email protected]
 FBC FLORIDA BUILDING CODE 2010
 FBC R FLORIDA BUILDING CODE 2010 RESIDENTIAL
  
 1. REVISE THE PLAN TO PROVIDE THE FOLLOWING
 INFORMATION:
  
 TOTAL NUMBER OF PARKING SPACES
 NUMBER OF ACCESSIBLE SPACES
 LOCATION OF ACCESSIBLE ENTRANCES
 LOCATION OF ACCESSIBLE SPACES AND ACCESS AISLES
 SHOW ACCESSIBLE ROUTE FROM PUBLIC WAY
 ACCESSIBLE ROUTE FROM ACCESSIBLE SPACE TO ACCESSIBLE
 ENTRANCE
  
 SEE FBC 2010 ACCESSIBLITY 202.3 (ALTERATIONS), 208.2
 (PARKING SPACES), 502 (PARKING SPACES), 206 (ACCESSIBLE
 ROUTE).
  
  

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2014-05-23 Cont ID  
Sent By Mgonzale Date 2014-05-23 Time   Rev Time 1.00
Received By mgonzale Date 2014-05-23 Time   Sent To I
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2014-04-16 Cont ID  
Sent By Mgonzale Date 2014-04-16 Time   Rev Time 1.00
Received By mgonzale Date 2014-04-16 Time   Sent To B
Notes
2014-04-16 13:56:56ADDRESS PLANNINGS COMMENTS
  
 SEE ADDITIONAL ENGINEERING COMMENTS BELOW:
  
 1. ANY FLOW THRU TRAFFIC VENUES MUST USE
 "THERMOPLASTIC" MATERIALS. SAME FOR ANY ROADS
 INTERACTING WITH PALM BEACH TRAFFIC SIGNALS OR FDOT
 AREAS.
  
 2. ALL ADA/ PEDESTRIAN AREA CROSSINGS MUST USE
 TRUNCATED DOMES AS PER FDOT INDEX 304 AND INDEX 17784.
  
 3. CONCRETE SIDEWALKS MUST CONFORM TO FDOT INDEX 310.
  
 4. ANY OTHER SPECIAL MARKING AREAS MUST COMPLY WITH
 FDOT INDEX 17784
  
 5. ENGINEER OF RECORD WILL CERTIFIY DRAINAGE, PAVING
 AND STRIPING TO CITY OF WEST PALM BEACH.
  
 INCLUDE IN VALUE NOT ONLY 'PAVING" BUT "DRAINAGE" ALSO.
 UPON SUBMISISON OF REVISION ADDRESSING PLANNING
 COMMENTS THE ABOVE COMMENTS
 CAN BE MADE PROVISOS FOR APPROVAL.
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES AND PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2014-05-27 Cont ID  
Sent By skennedy Date 2014-05-27 Time 06:41 Rev Time 0.00
Received By skennedy Date 2014-05-14 Time 11:10 Sent To  
Notes
2014-05-14 11:11:17EXPEDITED RESUBMITTAL SENT TO ZONING SHELF FOR ERIC'S
 REVIEW. JG.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2014-05-08 Cont ID  
Sent By skennedy Date 2014-05-08 Time 12:44 Rev Time 0.00
Received By skennedy Date 2014-05-08 Time 12:41 Sent To  
Notes
2014-05-08 12:45:33CONTRACTOR LEFT AFTER REALIZING HIS RESUBMITTAL WAS NOT
 ADEQUATE.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-04-26 Cont ID  
Sent By shill Date 2014-04-26 Time 16:17 Rev Time 0.00
Received By shill Date 2014-04-03 Time 11:06 Sent To  
Notes
2014-04-04 11:07:01SENT TO ZONING SHELF FOR REVIEW. JG.

Review Stop Z ZONING
Rev No 2 Status P Date 2014-05-19 Cont ID  
Sent By eschneid Date 2014-05-19 Time 15:35 Rev Time 0.25
Received By eschneid Date 2014-05-19 Time 15:35 Sent To B
Notes
2014-05-19 15:35:50SEE RESPONSE LETTER WITH APPLICATION.
2014-05-14 14:33:295/14/14 ZONING RECEIVED, SENT TO ES. SG

Review Stop Z ZONING
Rev No 1 Status F Date 2014-04-15 Cont ID  
Sent By skennedy Date 2014-05-08 Time 12:44 Rev Time 1.00
Received By eschneid Date 2014-04-04 Time 14:38 Sent To ENG
Notes
2014-04-15 11:03:20FAILED
  
 1) PLEASE EXPLAIN AND SHOW ON THE PLANS HOW THE ACCESS
 ACROSS THE SITE THAT IS REQUIRED BY THE PALM BEACH
 COUNTY TRAFFIC APPROVAL LETTER WILL BE MAINTAINED
 DURING THE CONSTRUCTION. THE PLANS SHOW THE ENTIRE SITE
 SEALED OFF. ALTERNATIVELY, PROVIDE A LETTER FROM PALM
 BEACH COUNTY TRAFFIC ENGINEERING THAT THE CONDITION MAY
 TEMPORALLY BE SUSPENDED DURING CONSTRUCTION OF THE
 PARKING LOT.
  
 2) PROVIDE STRIPING IN THE PARKING AREA ADJACENT TO THE
 PRESERVE THAT INCLUDES THE DAYCARE PARKING IF IT IS NOT
 ALREADY STRIPED.
  
 3) PROVIDE A PLAN SHOWING THE PARKING SPACE WIDTH AND
 DEPTH DISTANCES AND THE WIDTHS OF THE DRIVE AISLES AND
 LANDSCAPE ISLANDS. THE URBAN DESIGN KILDAY STUDIOS PLAN
 SHOWS THESE DIMENSIONS. NOTE: THE FEW DIMENSIONED CROSS
 SECTIONS THAT ARE PROVIDED ARE NOT TIED TO THE PAVING
 PLAN THROUGH NOTATIONS.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446.
  
  
2014-04-04 14:38:304/4/14 ZONING RECEIVED SENT TO ES. SG


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved