Plan Review Details - Permit 14030881
Plan Review Stops For Permit 14030881
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2014-07-30 Cont ID  
Sent By rmcdouga Date 2014-07-30 Time 08:14 Rev Time 0.00
Received By rmcdouga Date 2014-07-29 Time 18:49 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2014-07-22 Cont ID  
Sent By rmcdouga Date 2014-07-22 Time 18:00 Rev Time 0.00
Received By rmcdouga Date 2014-07-22 Time 17:56 Sent To  
Notes
2014-07-22 18:09:432010 FBC
  
 DENIED BY BUILDING
  
 1) THE CORRECTED LIGHT POLE WIND STRESS CALCULATIONS
 THAT WERE SUBMITTED DO NOT HAVE THE ORIGINAL
 HANDWRITTEN SIGNATURE (FACSIMILES ARE NOT ACCEPTABLE)
 OF THE DELEGATED ENGINEER ON THEM AS REQUIRED BY FAC
 61G15-23.002
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2014-04-16 Cont ID  
Sent By rmcdouga Date 2014-04-16 Time 15:58 Rev Time 0.00
Received By rmcdouga Date 2014-04-16 Time 15:58 Sent To  
Notes
2014-04-16 17:04:552010 FBC
  
 DENIED BY BUILDING
  
 1) THE WIND LOAD CALCULATIONS FOR THE LIGHTING POLES
 FROM PROFESSIONAL ENGINEER CHRISTOPHER PLY THAT ARE
 STAPLED TO THE LIGHTING PLANS DO NOT HAVE THE SITE
 ADDRESS TO TIE IT TO THIS PROJECT. FAC 61G15-23.002
  
 2) THE LIGHTING POLE CALCULATIONS ARE FOR A SIDE ARM
 MOUNT AND THE ONE SHOWN ON THE PLAN HAS THE LAMP
 MOUNTED DIRECTLY ON THE TOP OF THE POLE. PLEASE
 CLARIFY. CITY AMENDMENTS 107.2.1
  
 3) IT APPEARS THAT THE LIGHTING POLE CALCULATIONS WERE
 DONE BY A DELEGATED ENGINEER. IF THIS IS THE CASE, THEN
 THE ENGINEER OF RECORD IS REQUIRED TO REVIEW AND
 APPROVE THEM IN WRITING. FAC 61G15-30.005
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2014-04-16 Cont ID  
Sent By albarran Date 2014-04-16 Time 11:33 Rev Time 0.00
Received By albarran Date 2014-04-16 Time 10:28 Sent To B
Notes
2014-04-16 11:34:38THE SCOPE OF THIS PERMIT IS LIMITED AS HEREIN
 DESCRIBED:
 AS DESCRIBED ON THE PERMIT AND APPROVED PLANS, THE
 INSTALLATION OF THE 4 LIGHTS BETWEEN BLDGS. 5 & 6.

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2014-07-30 Cont ID  
Sent By rmcdouga Date 2014-07-30 Time 08:14 Rev Time 0.00
Received By rmcdouga Date 2014-07-29 Time 17:59 Sent To  
Notes
2014-07-29 17:59:16TO RM
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2014-07-22 Cont ID  
Sent By rmcdouga Date 2014-07-22 Time 18:09 Rev Time 0.00
Received By rmcdouga Date 2014-07-18 Time 09:20 Sent To  
Notes
2014-07-19 09:20:36SENT TO RMCDOUGAL

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-04-16 Cont ID  
Sent By albarran Date 2014-04-16 Time 11:34 Rev Time 0.00
Received By rmcdouga Date 2014-03-24 Time 11:10 Sent To  
Notes
2014-04-16 11:35:12TAKEN TO ALLISON
2014-03-24 11:17:09INCOMING SENT TO ZONING.

Review Stop Z ZONING
Rev No 1 Status P Date 2014-04-03 Cont ID  
Sent By DMalone Date 2014-04-03 Time 11:50 Rev Time 0.00
Received By dmalone Date 2014-04-03 Time 11:50 Sent To E
Notes
2014-03-24 15:03:543/24/14 ZONING RECEIVED, SENT TO DM. SG