Plan Review Stops For Permit 14021097 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
6 |
Status |
P |
Date |
2015-01-21 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2015-01-21 |
Time |
13:48 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2015-01-21 |
Time |
11:15 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
5 |
Status |
F |
Date |
2015-01-05 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2015-01-05 |
Time |
07:55 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2015-01-05 |
Time |
07:55 |
Sent To |
|
|
Notes |
2015-01-05 08:39:49 | 2010 FBC | | 4TH REVIEW | | DENIED BY BUILDING | | | | 1) THE INFORMATION LISTED ON THE ENERGY CALCULATION IS | | NOT CONSISTANT WITH THE EQUIPMENT SIZING CALCULATIONS | | OR THE EQUIPMENT SCHEDULE ON THE MECHANICAL PLANS. THE | | SEER AND BTUS FOR THE HEATING AND COOLING ARE | | DIFFERENT. PLEASE CORRECT. THE INFORMATION ON THE PLANS | | AND ENERGY FORMS ARE REQUIRED TO BE CONSISTENT. FBC | | R107.2.1 | | THE RESULTS ON THE RESUMBMITTED EQUIPMENT SIZING | | CALCULATIONS WERE IMPROPERLY CHANGED. | | THE EQUIPMENT SIZING CALCULATIONS CAN NOT BE CHANGED BY | | SOMEONE CROSSING OUT THE RESULTS ON THE SUMMARY SHEET | | AND WRITING IN DIFFERENT RESULTS. THE CARRIER MODEL | | 24ACC624A HAS A MAXIMUM SEER OF 16 AND THE ENERGY | | CALCULATION FORM LISTS R-17. THE ENERGY CALCULATION | | FORM LISTS THE WALL INSULATION AS R-5 AND SHEET A102 OF | | THE PLANS HAS R-4.2THE EQUIPMENT SIZING CALCULATIONS | | AND THE ENERGY CALCULATIONS WILL NEED TO BE RE-DONE | | USING THE SAME INPUT INFORMATION SO THAT THE REPORTS | | ARE CONSISTENT WITH EACH OTHER. | | | | 2) THE PREPARER AND THE OWNER/AGENT ARE REQUIRED TO | | SIGN THE ENERGY CALC. FORM. FBC ENERGY CONSERVATION | | SECTION 103.2.3.2 THE NEW FORMS ARE REQUIRED TO BE | | SIGNED. | | | | 3) MAKE SURE THAT THE CORRECT INFORMATION APPEARS IN | | THE EQUIPMENT SCHEDULE ON THE MECHANICAL PLAN. FBC | | 107.2.1 | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | [email protected] |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
F |
Date |
2014-12-11 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2014-12-11 |
Time |
17:28 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2014-12-11 |
Time |
15:28 |
Sent To |
|
|
Notes |
2014-12-11 18:20:38 | 2010 FBC | | 3RD REVIEW | | DENIED BY BUILDING | | | | 1) THE INFORMATION LISTED ON THE ENERGY CALCULATION IS | | NOT CONSISTANT WITH THE EQUIPMENT SIZING CALCULATIONS | | OR THE EQUIPMENT SCHEDULE ON THE MECHANICAL PLANS. THE | | SEER AND BTUS FOR THE HEATING AND COOLING ARE | | DIFFERENT. PLEASE CORRECT. THE INFORMATION ON THE PLANS | | AND ENERGY FORMS ARE REQUIRED TO BE CONSISTENT. FBC | | R107.2.1 | | | | 2) THE PREPARER AND THE OWNER/AGENT ARE REQUIRED TO | | SIGN THE ENERGY CALC. FORM. FBC ENERGY CONSERVATION | | SECTION 103.2.3.2 | | | | 3) SUBMIT TWO COPIES OF PRODUCT APPROVALS FOR THE NEW | | PGT IMPACT RATED SINGLE HUNG WINDOWS THAT ARE SPECIFIED | | ON PLAN SHEET A102 AS REQUIRED BY DCA RULE 9N-3. | | MIAMI-DADE NOAS AND FLORIDA PRODUCT APPROVALS ARE | | ACCEPTABLE. | | | | 4) THE PRODUCT APPROVALS ARE REQUIRED TO BE REVIEWED | | AND APPROVED IN WRITING BY THE DESIGNER OF RECORD FOR | | THE PROJECT. CITY AMENDMENTS 107.3.4.1 | | | | 5) IN ORDER TO SPEED PLAN REVIEW, PLEASE SUBMIT A | | RESPONSE LETTER THAT INDICATES HOW EACH OF THE REVIEW | | COMMENTS WAS ADDRESSED. | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | [email protected] |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
F |
Date |
2014-10-30 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2014-10-30 |
Time |
11:41 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2014-10-30 |
Time |
09:20 |
Sent To |
|
|
Notes |
2014-10-30 11:41:10 | 2010 FBC | | 2ND REVIEW | | DENIED BY BUILDING | | | | 1) COMPLIED | | | | 2) COMPLIED | | | | 3) COMPLIED | | | | 4) COMPLIED | | | | 5) COMPLIED | | | | 6)COMPLIED | | | | 7) THE CITY AND PERMIT OFFICE ARE SPECIFIED AS RIVIERA | | BEACH ON THE ENERGY CALCULATION. THIS PROJECT IS | | LOCATED IN THE CITY OF WEST PALM BEACH (JURISDICTION | | NUMBER 604700). PLEASE CORRECT. FBC ENERGY CONSERVATION | | SECTION 103.2.1.1.1 | | (THE ENERGY CALCULATIONS WILL NEED TO BE REDONE WITH | | THE CORRECT INFORMATION.) | | | | 8) THE OWNER/AGENT IS REQUIRED TO SIGN THE ENERGY CALC. | | FORM. FBC ENERGY CONSERVATION SECTION 103.2.3.2 | | | | 9) THE ATTIC DUCT INSULATION IS LISTED AS R-13 ON THE | | ENERGY CALC. FORM AND THE MECHANICAL PLANS SPECIFY R-6. | | PLEASE CORRECT. FBC ENERGY CONSERVATION SECTION | | 103.2.3.2 ( THE INFORMATION ON THE PLANS AND ENERGY | | FORMS ARE REQUIRED TO BE CONSISTENT. FBC R107.2.1 | | | | 10) THE ENERGY CALC. FORM SPECIFIES THAT THE EXTERIOR | | CONCRETE BLOCK WALLS HAVE R-13 INSULATION. PROVIDE A | | WALL SECTION THAT SHOWS THE TYPE OF INSULATION THAT | | WILL BE INSTALLED. CITY AMENDMENTS 107.2.1 & FBC ENERGY | | CONSERVATION SECTION 103.2.1.1.1 ( THE PLANS SPECIFY | | R-4.2 INSULATION ON THE EXTERIOR CONCRETE WALLS. ) | | | | 11) SUBMIT TWO COPIES OF PRODUCT APPROVALS FOR THE PGT | | & LAWSON SINGLE HUNG WINDOWS THAT ARE SPECIFIED ON PLAN | | SHEET A102 AND FOR THE STRUCTURAL MULLIONS AS REQUIRED | | BY DCA RULE 9N-3. MIAMI-DADE NOAS AND FLORIDA PRODUCT | | APPROVALS ARE ACCEPTABLE. | | | | 12) THE PRODUCT APPROVALS ARE REQUIRED TO BE REVIEWED | | AND APPROVED IN WRITING BY THE DESIGNER OF RECORD FOR | | THE PROJECT. CITY AMENDMENTS 107.3.4.1 | | | | 13) SHOW COMPLIANCE WITH FBCR 301.2.1.2 FOR OPENING | | PROTECTION FROM LARGE MISSILE IMPACT. IF STORM PANELS | | ARE USED SUBMIT TWO COPIES OF THEIR PRODUCT APPROVALS, | | AN INSTALLATION SCHEDULE AND A KEY PLAN. DCA RULE 9N-3 | | & CITY AMENDMENTS 107.2.1. | | | | 14) IN ORDER TO SPEED PLAN REVIEW, PLEASE SUBMIT A | | RESPONSE LETTER THAT INDICATES HOW EACH OF THE REVIEW | | COMMENTS WAS ADDRESSED. | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | [email protected] |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2014-07-16 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2014-07-16 |
Time |
17:51 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2014-07-16 |
Time |
08:19 |
Sent To |
|
|
Notes |
2014-07-16 15:47:33 | 2010 FBC | | | | DENIED BY BUILDING | | | | 1) SPECIFY THE WIND DESIGN DATA ON THE PLANS. THIS | | STRUCTURE IS LOCATED IN 17O MPH VULT WIND SPEED AND | | EXPOSURE CATEGORY C. THE FBCR 301.2.1 | | | | 2) PROVIDE A STRUCTURAL DETAIL FOR THE CONCRETE BLOCK | | WALL IN-FILL AT THE KITCHEN WINDOW THAT SHOWS THE | | REINFORCING BAR SIZE AND LOCATION. CITY AMENDMENTS | | 107.2.1.3 & FBCR 301.1 | | | | 3) THE TYPE OF CONSTRUCTION FOR THIS STRUCTURE IS V-B | | PER FBC TABLE 601. PLEASE CORRECT BUILDING TYPE ON | | SHEET A100. | | | | 4) SHOW COMPLIANCE WITH FBCR 314.3.1 FOR SMOKE ALARMS | | AND FBCR 315 FOR CARBON MONOXIDE ALARMS. | | | | 5) SHOW THAT THE BATHROOM WINDOWS COMPLY WITH FBCR | | 308.4 FOR SAFETY GLAZING IN HAZARDOUS LOCATIONS. | | | | 6) THE WINDOW BUCK DETAIL ON SHEET A102 SPECIFIES 3/13" | | X 1-3/4" TAPCONS WITH A 1-1/4" MINIMUM WOOD EMBED. THE | | EXTERIOR WALLS ARE CONCRETE BLOCK NOT WOOD. THE LENGTH | | OF THE TAPCONS WILL NOT PROVIDE AN 1-1/4" EMBED DEPTH | | WHEN FASTENED THROUGH A 3/4" BUCK AND A 1/4" SHIM | | SPACE. PLEASE CLARIFY. CITY AMENDMENTS 107.2.1 AND FBCR | | 612.10.2.1 | | | | 7) THE CITY AND PERMIT OFFICE ARE SPECIFIED AS RIVIERA | | BEACH ON THE ENERGY CALCULATION. THIS PROJECT IS | | LOCATED IN THE CITY OF WEST PALM BEACH (JURISDICTION | | NUMBER 604700). PLEASE CORRECT. FBC ENERGY CONSERVATION | | SECTION 103.2.1.1.1 | | | | 8) THE OWNER/AGENT IS REQUIRED TO SIGN THE ENERGY CALC. | | FORM. FBC ENERGY CONSERVATION SECTION 103.2.3.2 | | | | 9) THE ATTIC DUCT INSULATION IS LISTED AS R-13 ON THE | | ENERGY CALC. FORM AND THE MECHANICAL PLANS SPECIFY R-6. | | PLEASE CORRECT. FBC ENERGY CONSERVATION SECTION | | 103.2.3.2 | | | | 10) THE ENERGY CALC. FORM SPECIFIES THAT THE EXTERIOR | | CONCRETE BLOCK WALLS HAVE R-13 INSULATION. PROVIDE A | | WALL SECTION THAT SHOWS THE TYPE OF INSULATION THAT | | WILL BE INSTALLED. CITY AMENDMENTS 107.2.1 & FBC ENERGY | | CONSERVATION SECTION 103.2.1.1.1 | | | | 11) SUBMIT TWO COPIES OF PRODUCT APPROVALS FOR THE PGT | | & LAWSON SINGLE HUNG WINDOWS THAT ARE SPECIFIED ON PLAN | | SHEET A102 AND FOR THE STRUCTURAL MULLIONS AS REQUIRED | | BY DCA RULE 9N-3. MIAMI-DADE NOAS AND FLORIDA PRODUCT | | APPROVALS ARE ACCEPTABLE. | | | | 12) THE PRODUCT APPROVALS ARE REQUIRED TO BE REVIEWED | | AND APPROVED IN WRITING BY THE DESIGNER OF RECORD FOR | | THE PROJECT. CITY AMENDMENTS 107.3.4.1 | | | | 13) SHOW COMPLIANCE WITH FBCR 301.2.1.2 FOR OPENING | | PROTECTION FROM LARGE MISSILE IMPACT. IF STORM PANELS | | ARE USED SUBMIT TWO COPIES OF THEIR PRODUCT APPROVALS, | | AN INSTALLATION SCHEDULE AND A KEY PLAN. DCA RULE 9N-3 | | & CITY AMENDMENTS 107.2.1. | | | | 14) IN ORDER TO SPEED PLAN REVIEW, PLEASE SUBMIT A | | RESPONSE LETTER THAT INDICATES HOW EACH OF THE REVIEW | | COMMENTS WAS ADDRESSED. | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | [email protected] | 2014-06-26 11:44:35 | SENT TO R07. JW |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2014-03-10 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2014-03-10 |
Time |
08:55 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2014-03-10 |
Time |
08:55 |
Sent To |
|
|
Notes |
2014-03-10 08:58:02 | IT APPEARS THIS IS A DEMOLITION REQUEST IN PREPARATION | | FOR A REMODEL. THE SCOPE IS UNCLEAR AS INFORMATION | | BEYOND THIS SCOPE IS INCLUDED. ADDITIONALLY, THE TITLE | | BLOCK INDICATES THE JOB ADDRESS IS IN MIAMI BEACH. | | CONTRACTOR TO RESUSSBMIT AND CLARIFY. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2014-12-11 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2014-12-11 |
Time |
15:53 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2014-12-11 |
Time |
15:29 |
Sent To |
|
|
Notes |
2014-12-11 15:54:09 | RED-LINED PLANS. APPROVED WITH EXCEPTIONS NOTED ON | | PLANS. | 2014-12-04 09:59:38 | NEW SHEETS SUBMITTED. JG. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2014-07-17 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2014-07-17 |
Time |
11:02 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2014-07-17 |
Time |
11:02 |
Sent To |
|
|
Notes |
2014-07-17 11:03:38 | RED-LINED PLANS. APPROVED WITH EXCEPTIONS NOTED ON | | PLANS. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
6 |
Status |
N |
Date |
2015-01-21 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2015-01-21 |
Time |
13:48 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2015-01-16 |
Time |
17:34 |
Sent To |
|
|
Notes |
2015-01-16 17:35:21 | RE-SUBMITTAL SENT TO ZONING SHELF FOR LINDA LOUIE | | REVIEW. JG. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
5 |
Status |
N |
Date |
2015-01-05 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2015-01-05 |
Time |
07:55 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2014-12-22 |
Time |
06:20 |
Sent To |
|
|
Notes |
2014-12-23 06:18:28 | SENT TO ZONING |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2014-12-11 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2014-12-11 |
Time |
18:21 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2014-12-03 |
Time |
09:57 |
Sent To |
|
|
Notes |
2014-12-04 09:57:52 | RE-SUBMITTAL SENT TO ZONING SHELF FOR LINDA LOUIE | | REVIEW. JG. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2014-10-30 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2014-10-30 |
Time |
11:41 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2014-10-21 |
Time |
11:14 |
Sent To |
|
|
Notes |
2014-10-22 11:15:57 | RE-SUBMITTAL SENT TO ZONING SHELF FOR LINDA'S REVIEW. | | JG. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2014-07-17 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2014-07-17 |
Time |
11:03 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2014-06-25 |
Time |
11:44 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2014-03-10 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2014-03-10 |
Time |
08:55 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2014-02-28 |
Time |
08:54 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
3 |
Status |
P |
Date |
2014-12-11 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2014-12-11 |
Time |
16:45 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2014-12-11 |
Time |
16:45 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
F |
Date |
2014-10-30 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2014-10-30 |
Time |
09:10 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2014-10-30 |
Time |
09:10 |
Sent To |
|
|
Notes |
2014-10-30 09:10:06 | 2010 FBC | | | | DENIED BY MECHANICAL (2ND REVIEW) ( ITEMS 2 THROUGH 5 | | FROM THE FIRST REVIEW WERE NOT ADDRESSED.) | | | | 1) COMPLIED | | | | 2) SPECIFY THE SIZE OF THE RETURN AIR TRANSFER DUCTS TO | | SHOW COMPLIANCE WITH FBCR M 1602.4 FOR BALANCED RETURN | | AIR. | | | | 3) SPECIFY THE SIZE OF THE SUPPLY DUCT TO THE NEW | | BATHROOM. CITY AMENDMENTS 107.3.5.3 | | | | 4) THE BATHROOM EXHAUST DUCTS ARE REQUIRED TO DISCHARGE | | DIRECTLY TO THE OUTDOORS. FBCR M1507.2 | | | | 5) INDICATE HOW THE RETURN AIR WILL GET TO THE AIR | | HANDLER THAT IS LOCATED IN THE CLOSET. IF IT IS THROUGH | | THE BI-FOLD DOORS, SPECIFY THAT THEY WILL BE LOUVERED. | | FBCR M1602 | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | [email protected] |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2014-07-16 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2014-07-16 |
Time |
13:33 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2014-07-16 |
Time |
08:18 |
Sent To |
|
|
Notes |
2014-07-16 13:52:09 | 2010 FBC | | | | DENIED BY MECHANICAL | | | | 1) THE PRINTED NAME AND SIGNATURE OF THE PERSON | | RESPONSIBLE FOR THE DESIGN OF THE MECHANICAL SYSTEM IS | | REQUIRED ON THE PLANS. CITY AMENDMENTS 107.2.1 | | | | 2) SPECIFY THE SIZE OF THE RETURN AIR TRANSFER DUCTS TO | | SHOW COMPLIANCE WITH FBCR M 1602.4 FOR BALANCED RETURN | | AIR. | | | | 3) SPECIFY THE SIZE OF THE SUPPLY DUCT TO THE NEW | | BATHROOM. CITY AMENDMENTS 107.3.5.3 | | | | 4) THE BATHROOM EXHAUST DUCTS ARE REQUIRED TO DISCHARGE | | DIRECTLY TO THE OUTDOORS. FBCR M1507.2 | | | | 5) INDICATE HOW THE RETURN AIR WILL GET TO THE AIR | | HANDLER THAT IS LOCATED IN THE CLOSET. IF IT IS THROUGH | | THE BI-FOLD DOORS, SPECIFY THAT THEY WILL BE LOUVERED. | | FBCR M1602 | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | [email protected] |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2014-12-11 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2014-12-11 |
Time |
17:15 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2014-12-11 |
Time |
15:29 |
Sent To |
|
|
Notes |
2014-12-04 09:59:11 | NEW SHEETS SUBMITTED. JG. |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2014-07-16 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2014-07-16 |
Time |
08:29 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2014-07-16 |
Time |
08:18 |
Sent To |
|
|
Notes |
2014-07-16 08:58:12 | RED-LINED PLANS. APPROVED WITH EXCEPTIONS NOTED ON | | PLANS. |
|
|
Review Stop |
Z |
ZONING |
Rev No |
5 |
Status |
P |
Date |
2015-01-21 |
|
|
Cont ID |
|
Sent By |
llouie |
Date |
2015-01-21 |
Time |
|
Rev Time |
0.00 |
Received By |
llouie |
Date |
2015-01-20 |
Time |
|
Sent To |
B |
|
Notes |
2015-01-20 10:15:59 | ** ZONING FAILED ** | | | | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE | | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE | | APPLICABLE: | | | | 1.) REPEAT COMMENT (7/2/14; 10/27/14; 12/5/14; | | 12/23/14): THE VALUE OF THE CONSTRUCTION ($28,000) | | EXCEEDS 50 PERCENT OF THE STRUCTURE'S VALUE ($31,348 IN | | 2013 AND $52,720 IN 2014) ACCORDING TO THE P.B.C. | | PROPERTY APPRAISER'S OFFICE; THEREFORE, PURSUANT TO | | SECTION 94-441(C)(2) OF THE ZONING AND LAND DEVELOPMENT | | REGULATIONS (ZLDR), THE LANDSCAPE ON THE SITE SHALL BE | | IN COMPLIANCE WITH ALL APPLICABLE REGULATIONS FOUND IN | | ARTICLE XIV OF THE ZLDR. IF THE SITE CONFORMS TO | | ARTICLE XIV, THEN TWO (2) COPIES OF A LANDSCAPE PLAN | | DEMONSTRATING COMPLIANCE SHALL BE INCLUDED WITH THE | | PERMIT RE-SUBMITTAL. IF THE SITE DOES NOT CONFORM TO | | ARTICLE XIV, THEN PRIOR TO THE ZONING APPROVAL OF THIS | | PERMIT A SEPARATE LANDSCAPE PERMIT SHALL BE SUBMITTED | | SHOWING MATERIAL TO BRING THE SITE INTO CONFORMITY. | | | | PLEASE NOTE THAT ANY CHANGES ON THE RESUBMITTED PLANS | | MAY RESULT IN ADDITIONAL COMMENTS. CONTACT LINDA LOUIE | | @ (561) 822-1458 IF YOU HAVE QUESTIONS. | | | | NOTE: | | - SPOKE TO MIGUEL ESPINOZA ON 1/20/15. INFORMED MR. | | ESPINOZA THAT A SEPARATE LANDSCAPE PERMIT IS REQUIRED | | FOR THE LANDSCAPE PLANS WHICH WERE LOCATED IN THE | | MASTER PERMIT. MR. ESPINOZA INFORMED LINDA LOUIE THAT | | HE WILL DROP BY CITY HALL TO FILE THE SEPARATE PAPER | | WORK FOR THE LANDSCAPE PERMIT. | | | | - SPOKE TO JOSE JARAMILLO, PROJECT ARCHITECT ON 12/23 | | REGARDING LANDSCAPING REQUIREMENT; INFORMED MR. | | JARAMILLO THAT ZONING CANNOT PASS PERMIT UNTIL A | | LANDSCAPE PERMIT IS RECEIVED FOR THE PROJECT. MR. | | JARMILLO INFORMED LINDA LOUIE THAT HE IS WORKING ON THE | | LANDSCAPE PLANS AND WILL SUBMIT FOR THE LANDSCAPE | | PERMIT WHEN COMPLETED. |
|
|
Review Stop |
Z |
ZONING |
Rev No |
4 |
Status |
F |
Date |
2014-12-23 |
|
|
Cont ID |
|
Sent By |
llouie |
Date |
2014-12-23 |
Time |
16:41 |
Rev Time |
0.00 |
Received By |
llouie |
Date |
2014-12-23 |
Time |
16:41 |
Sent To |
B |
|
Notes |
2014-12-23 16:45:55 | ** ZONING FAILED ** | | | | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE | | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE | | APPLICABLE: | | | | 1.) REPEAT COMMENT (7/2/14; 10/27/14; 12/5/14): THE | | VALUE OF THE CONSTRUCTION ($28,000) EXCEEDS 50 PERCENT | | OF THE STRUCTURE'S VALUE ($31,348 IN 2013 AND $52,720 | | IN 2014) ACCORDING TO THE P.B.C. PROPERTY APPRAISER'S | | OFFICE; THEREFORE, PURSUANT TO SECTION 94-441(C)(2) OF | | THE ZONING AND LAND DEVELOPMENT REGULATIONS (ZLDR), THE | | LANDSCAPE ON THE SITE SHALL BE IN COMPLIANCE WITH ALL | | APPLICABLE REGULATIONS FOUND IN ARTICLE XIV OF THE | | ZLDR. IF THE SITE CONFORMS TO ARTICLE XIV, THEN TWO (2) | | COPIES OF A LANDSCAPE PLAN DEMONSTRATING COMPLIANCE | | SHALL BE INCLUDED WITH THE PERMIT RE-SUBMITTAL. IF THE | | SITE DOES NOT CONFORM TO ARTICLE XIV, THEN PRIOR TO THE | | ZONING APPROVAL OF THIS PERMIT A SEPARATE LANDSCAPE | | PERMIT SHALL BE SUBMITTED SHOWING MATERIAL TO BRING THE | | SITE INTO CONFORMITY. | | | | PLEASE NOTE THAT ANY CHANGES ON THE RESUBMITTED PLANS | | MAY RESULT IN ADDITIONAL COMMENTS. CONTACT LINDA LOUIE | | @ (561) 822-1458 IF YOU HAVE QUESTIONS. | | | | NOTE: | | - SPOKE TO JOSE JARAMILLO, PROJECT ARCHITECT ON 12/23 | | REGARDING LANDSCAPING REQUIREMENT; INFORMED MR. | | JARAMILLO THAT ZONING CANNOT PASS PERMIT UNTIL A | | LANDSCAPE PERMIT IS RECEIVED FOR THE PROJECT. MR. | | JARMILLO INFORMED LINDA LOUIE THAT HE IS WORKING ON THE | | LANDSCAPE PLANS AND WILL SUBMIT FOR THE LANDSCAPE | | PERMIT WHEN COMPLETED. |
|
|
Review Stop |
Z |
ZONING |
Rev No |
3 |
Status |
F |
Date |
2014-12-05 |
|
|
Cont ID |
|
Sent By |
llouie |
Date |
2014-12-05 |
Time |
09:02 |
Rev Time |
0.00 |
Received By |
llouie |
Date |
2014-12-05 |
Time |
09:02 |
Sent To |
B |
|
Notes |
2014-12-05 09:03:22 | ** FAILED ** | | | | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE | | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE | | APPLICABLE: | | | | 1.) REPEAT COMMENT (7/2/14; 10/27/14): A NEW A/C UNIT | | HAS BEEN DETECTED IN THE FLOOR PLANS. PROVIDE AN | | UPDATED SURVEY OF THE PROPERTY AND ILLUSTRATE THE | | LOCATION OF THE A/C UNIT IN RELATIONSHIP TO THE | | PROPERTY LINE(S). | | | | 2.) REPEAT COMMENT (7/2/14; 10/27/14): THE A/C UNIT | | SHALL NOT PROJECT MORE THAN 4 FT. INTO ANY SETBACK. THE | | SETBACK OF THE PROPOSED A/C UNIT CANNOT BE DETERMINED | | WITHOUT A SURVEY OF THE PROPERTY. (ZLDR S.94-305(B)(4)) | | | | 3.) REPEAT COMMENT (7/2/14; 10/27/14): THE VALUE OF THE | | CONSTRUCTION ($28,000) EXCEEDS 50 PERCENT OF THE | | STRUCTURE'S VALUE ($31,348 IN 2013 AND $52,720 IN 2014) | | ACCORDING TO THE P.B.C. PROPERTY APPRAISER'S OFFICE; | | THEREFORE, PURSUANT TO SECTION 94-441(C)(2) OF THE | | ZONING AND LAND DEVELOPMENT REGULATIONS (ZLDR), THE | | LANDSCAPE ON THE SITE SHALL BE IN COMPLIANCE WITH ALL | | APPLICABLE REGULATIONS FOUND IN ARTICLE XIV OF THE | | ZLDR. IF THE SITE CONFORMS TO ARTICLE XIV, THEN TWO (2) | | COPIES OF A LANDSCAPE PLAN DEMONSTRATING COMPLIANCE | | SHALL BE INCLUDED WITH THE PERMIT RE-SUBMITTAL. IF THE | | SITE DOES NOT CONFORM TO ARTICLE XIV, THEN PRIOR TO THE | | ZONING APPROVAL OF THIS PERMIT A SEPARATE LANDSCAPE | | PERMIT SHALL BE SUBMITTED SHOWING MATERIAL TO BRING THE | | SITE INTO CONFORMITY. | | | | 4.) REPEAT COMMENT (10/27/14): THE LATEST REVISION, | | SHOWING A DIFFERENT LOCATION FOR THE PROPOSED A/C UNIT | | IS NOT CONSISTENT WITHIN THE FLOOR PLANS; THERE SEEMS | | TO BE MORE THAN ONE (1) POSSIBLE LOCATION FOR THE A/C | | UNIT. PLEASE ADDRESS FOR CONSISTENCY. | | | | PLEASE NOTE THAT ANY CHANGES ON THE RESUBMITTED PLANS | | MAY RESULT IN ADDITIONAL COMMENTS. CONTACT LINDA LOUIE | | @ (561) 822-1458 IF YOU HAVE QUESTIONS. | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
F |
Date |
2014-10-27 |
|
|
Cont ID |
|
Sent By |
llouie |
Date |
2014-10-27 |
Time |
16:12 |
Rev Time |
0.00 |
Received By |
llouie |
Date |
2014-10-27 |
Time |
16:12 |
Sent To |
B |
|
Notes |
2014-10-27 16:13:30 | ** FAILED ** | | | | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE | | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE | | APPLICABLE: | | | | 1.) REPEAT COMMENT (7/2/14): A NEW A/C UNIT HAS BEEN | | DETECTED IN THE FLOOR PLANS. PROVIDE AN UPDATED SURVEY | | OF THE PROPERTY AND ILLUSTRATE THE LOCATION OF THE A/C | | UNIT IN RELATIONSHIP TO THE PROPERTY LINE(S). | | | | 2.) REPEAT COMMENT (7/2/14): THE A/C UNIT SHALL NOT | | PROJECT MORE THAN 4 FT. INTO ANY SETBACK. THE SETBACK | | OF THE PROPOSED A/C UNIT CANNOT BE DETERMINED WITHOUT A | | SURVEY OF THE PROPERTY. (ZLDR S.94-305(B)(4)) | | | | 3.) REPEAT COMMENT (7/2/14): THE VALUE OF THE | | CONSTRUCTION ($28,000) EXCEEDS 50 PERCENT OF THE | | STRUCTURE'S VALUE ($31,348 IN 2013 AND $52,720 IN 2014) | | ACCORDING TO THE P.B.C. PROPERTY APPRAISER'S OFFICE; | | THEREFORE, PURSUANT TO SECTION 94-441(C)(2) OF THE | | ZONING AND LAND DEVELOPMENT REGULATIONS (ZLDR), THE | | LANDSCAPE ON THE SITE SHALL BE IN COMPLIANCE WITH ALL | | APPLICABLE REGULATIONS FOUND IN ARTICLE XIV OF THE | | ZLDR. IF THE SITE CONFORMS TO ARTICLE XIV, THEN TWO (2) | | COPIES OF A LANDSCAPE PLAN DEMONSTRATING COMPLIANCE | | SHALL BE INCLUDED WITH THE PERMIT RE-SUBMITTAL. IF THE | | SITE DOES NOT CONFORM TO ARTICLE XIV, THEN PRIOR TO THE | | ZONING APPROVAL OF THIS PERMIT A SEPARATE LANDSCAPE | | PERMIT SHALL BE SUBMITTED SHOWING MATERIAL TO BRING THE | | SITE INTO CONFORMITY. | | | | 4.) THE LATEST REVISION, SHOWING A DIFFERENT LOCATION | | FOR THE PROPOSED A/C UNIT IS NOT CONSISTENT WITHIN THE | | FLOOR PLANS; THERE SEEMS TO BE MORE THAN ONE (1) | | POSSIBLE LOCATION FOR THE A/C UNIT. PLEASE ADDRESS FOR | | CONSISTENCY. | | | | PLEASE NOTE THAT ANY CHANGES ON THE RESUBMITTED PLANS | | MAY RESULT IN ADDITIONAL COMMENTS. CONTACT LINDA LOUIE | | @ (561) 822-1458 IF YOU HAVE QUESTIONS. |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2014-07-02 |
|
|
Cont ID |
|
Sent By |
llouie |
Date |
2014-07-02 |
Time |
10:54 |
Rev Time |
0.00 |
Received By |
llouie |
Date |
2014-07-02 |
Time |
10:54 |
Sent To |
|
|
Notes |
2014-07-02 10:56:09 | ** FAILED ** | | | | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE | | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE | | APPLICABLE: | | | | 1.) A NEW A/C UNIT HAS BEEN DETECTED IN THE PLANS. | | PROVIDE AN UPDATED SURVEY OF THE PROPERTY AND | | ILLUSTRATE THE LOCATION OF THE A/C UNIT IN RELATIONSHIP | | TO THE PROPERTY LINE(S). | | | | 2.) THE A/C UNIT SHALL NOT PROJECT MORE THAN 4 FT. INTO | | ANY SETBACK. (ZLDR S.94-305(B)(4)) | | | | 3.) THE VALUE OF THE CONSTRUCTION ($28,000) EXCEEDS 50 | | PERCENT OF THE STRUCTURE'S VALUE ($31,348) ACCORDING TO | | THE P.B.C. PROPERTY APPRAISER'S OFFICE; THEREFORE, | | PURSUANT TO SECTION 94-441(C)(2) OF THE ZONING AND LAND | | DEVELOPMENT REGULATIONS (ZLDR), THE LANDSCAPE ON THE | | SITE SHALL BE IN COMPLIANCE WITH ALL APPLICABLE | | REGULATIONS FOUND IN ARTICLE XIV OF THE ZLDR. IF THE | | SITE CONFORMS TO ARTICLE XIV, THEN TWO (2) COPIES OF A | | LANDSCAPE PLAN DEMONSTRATING COMPLIANCE SHALL BE | | INCLUDED WITH THE PERMIT RE-SUBMITTAL. IF THE SITE DOES | | NOT CONFORM TO ARTICLE XIV, THEN PRIOR TO THE ZONING | | APPROVAL OF THIS PERMIT A SEPARATE LANDSCAPE PERMIT | | SHALL BE SUBMITTED SHOWING MATERIAL TO BRING THE SITE | | INTO CONFORMITY. | | | | PLEASE CALL LINDA LOUIE @ (561) 822-1458 IF THERE ARE | | QUESTIONS. | | | | | | | | | 2014-07-01 16:40:12 | 7-1-14 |
|
|