Plan Review Details - Permit 14020878
Plan Review Stops For Permit 14020878
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2014-05-16 Cont ID  
Sent By skennedy Date 2014-05-16 Time 10:52 Rev Time 0.00
Received By skennedy Date 2014-05-16 Time 10:55 Sent To  
Notes
2014-05-16 10:56:28SEE PROVISO ON PLAN, APPLICANT HAS AGREED TO SUBMIT
 REVISION UPON COMPLETION OF DESIGN.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2014-05-11 Cont ID  
Sent By skennedy Date 2014-05-11 Time 14:50 Rev Time 0.00
Received By skennedy Date 2014-05-11 Time 14:50 Sent To  
Notes
2014-05-11 14:38:56SECOND REVIEW:
  
 THE APPLICATION PROPOSES TO COMBINE TWO EXISTING
 RESIDENCES UPON SEPARATE PLATTED LOTS INTO ONE.
  
 PROVIDE AN UP TO DATE SURVEY FOR PROPOSED IMPROVEMENTS
 AS PREVIOUSLY REQUESTED. THIS IS REQUESTED TO
 COMPLIMENT THE SITE PROVIDED AND TO FUFILL THE PLAN
 SUBMITTAL REQUIREMENTS OF FBC 107.2.5 SITE PLAN AND
 FBC-110.7, DRAINAGE:
  
 FBC 107.2.5 SITE PLAN. THE CONSTRUCTION DOCUMENTS
 SUBMITTED WITH THE APPLICATION FOR PERMIT SHALL BE
 ACCOMPANIED BY A SITE PLAN SHOWING TO SCALE THE SIZE
 AND LOCATION OF NEW CONSTRUCTION AND EXISTING
 STRUCTURES ON THE SITE, DISTANCES FROM LOT LINES, THE
 ESTABLISHED STREET GRADES AND THE PROPOSED FINISHED
 GRADES AND, AS APPLICABLE, FLOOD HAZARD AREAS,
 FLOODWAYS, AND DESIGN FLOOD ELEVATIONS; AND IT SHALL BE
 DRAWN IN ACCORDANCE WITH AN ACCURATE BOUNDARY LINE
 SURVEY. IN THE CASE OF DEMOLITION, THE SITE PLAN SHALL
 SHOW CONSTRUCTION TO BE DEMOLISHED AND THE LOCATION AND
 SIZE OF EXISTING STRUCTURES AND CONSTRUCTION THAT ARE
 TO REMAIN ON THE SITE OR PLOT. THE BUILDING OFFICIAL IS
 AUTHORIZED TO WAIVE OR MODIFY THE REQUIREMENT FOR A
 SITE PLAN WHEN THE APPLICATION FOR PERMIT IS FOR
 ALTERATION OR REPAIR OR WHEN OTHERWISE WARRANTED..
  
 FBC-110.7 SUPPLY A DRAINAGE DESIGN. NEW CONSTRUCTION
 ACTIVITY SHALL NOT ADVERSELY IMPACT LEGAL HISTORIC
 SURFACE WATER DRAINAGE FLOWS SERVING ADJACENT
 PROPERTIES, AND MAY REQUIRE SPECIAL DRAINAGE DESIGN
 COMPLYING WITH ENGINEERING STANDARDS TO PRESERVE THE
 POSITIVE DRAINAGE PATTERNS OF THE AFFECTED SITES.
 SUPPLY A DRAINAGE DESIGN.
  
 THE ENERGY FORM SUBMITTED DID NOT COMPLY WITH THE
 MINIMUM REQUIREMENTS OF FBC 107.3.5.1.6 ENERGY
 CALCULATIONS - PROVIDE AN ENERGY SUBMITTAL COMPLIANT
 WITH FBC-E 103. A SIZING CALCULATION IS REQUIRED PER
 FBC-E 403.2.5.
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  
  
  
  
2014-04-22 14:00:44SENT TO ENG.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2014-03-19 Cont ID  
Sent By skennedy Date 2014-03-19 Time 10:00 Rev Time 0.00
Received By skennedy Date 2014-03-16 Time 13:32 Sent To ENG
Notes
2014-03-16 13:56:55THE APPLICATION PROPOSES TO COMBINE TWO EXISTING
 RESIDENCES UPON SEPARATE PLATTED LOTS INTO ONE. PROVIDE
 A UNITITY OF TITLE AND AN UP TO DATE SURVEY FOR
 PROPOSED IMPROVEMENTS.
 ADDITIONAL INFORMATION IA AVAILABLE AT :HTTP://WPB.ORG/
 WP-CONTENT/UPLOADS/SITES/7/2012/05/2011-
 11-14-16-09-54-APPLICATIONFORUNITYOFTITLE.PDF
 FBC 107.3.5.1.6 ENERGY CALCULATIONS - PROVIDE AN ENERGY
 SUBMITTAL COMPLIANT WITH FBC-E 103
 FBC 107.3.4 - PRODUCT APPROVALS FOR THOSE PRODUCTS
 WHICH ARE REGULATED BY DCA RULE 9N-3 ARE TO BE REVIEWED
 AND APPROVED IN WRITING BY THE STRUCTURAL DESIGNER OF
 RECORD. SPECIFICALLY, PROVIDE EVIDENCE OF REVIEW OF
 ROOFING, WINDOW, SHUTTER, SIDING, AND DOOR SUBMITTALS
 BY FREDRICK SCHAFFER, PE.
 FBC-110.7 SUPPLY A DRAINAGE DESIGN. NEW CONSTRUCTION
 ACTIVITY SHALL NOT ADVERSELY IMPACT LEGAL HISTORIC
 SURFACE WATER DRAINAGE FLOWS SERVING ADJACENT
 PROPERTIES, AND MAY REQUIRE SPECIAL DRAINAGE DESIGN
 COMPLYING WITH ENGINEERING STANDARDS TO PRESERVE THE
 POSITIVE DRAINAGE PATTERNS OF THE AFFECTED SITES.
 SUPPLY A DRAINAGE DESIGN.
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  
  
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2014-04-22 Cont ID  
Sent By albarran Date 2014-04-22 Time 10:01 Rev Time 0.00
Received By albarran Date 2014-04-22 Time 08:24 Sent To ENG
Notes
2014-04-22 10:00:10ALL PREVIOUS COMMENTS HAVE BEEN PROPERLY ADDRESSED.
 ELECTRICAL REMINDER:
 AS PER NEC 240.24, ELECTRICAL PANELS OR OCPD?S CAN?T BE
 OVER THE STEPS OF A STAIRWAY OR INSIDE A CLOTHES
 CLOSET. CONFIRM THAT VEST 2 WILL NOT VIOLATE THIS
 REQUIREMENT.
 IMPORTANT NOTICE:
 UNLESS INSTALLED & COMPLETED BY THE ELECTRICAL
 CONTRACTOR OF RECORD, SEPARATE PERMIT WILL BE REQUIRED
 FOR ALL LOW VOLTAGE, DATA AND/OR COMMUNICATION SYSTEM
 INSTALLATIONS.
  

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2014-03-17 Cont ID  
Sent By albarran Date 2014-03-17 Time 16:06 Rev Time 0.00
Received By albarran Date 2014-03-17 Time 15:12 Sent To B
Notes
2014-03-17 16:24:06THE FIRST ELECTRICAL REVIEW FAILED AND THE FOLLOWING
 DEFICIENCIES WERE NOTED:
 1. STATE/INDICATE. THE APPLICABLE CODE ON THE -PLANS
 (2008 EDITION OF THE NATIONAL ELECTRICAL CODE)
 2 PAGE NUMBERS AS SUBMITTED DO NOT MATCH THE DRAWING
 INDEX.
 3. ELECTRICAL NOTES 1 & ELECTRICAL SPECIFICATIONS 4
 CONFLICT WITH EACH OTHER.
 4. NEC HAS SPECIFIC OUTLET PLACEMENTS REQUIREMENTS ON
 SECTION 210.52 THAT SHALL BE OBSERVED.
 5. NEC 210.8 HAS SPECIFIC GFCI REQUIREMENTS WHICH HAVE
 TO BE FOLLOWED.
 6. NEC 210.12 HAS ARC-FAULT REQUIREMENTS
 7. NEC 406.11 ADDRESSES TAMPER-RESISTANT DEVICES
 8. SHALL SUBMIT PANEL SCHEDULES FOR BOTH, PANELS A & B
 9. INCLUDE THE COMPASS ARROW ON THE ELECTRICAL DRAWINGS
 10 THE LOCATION OF THE 5 CONDENSING UNITS SHALL BE
 INDICATED ON THE DRAWINGS.
  
 IT IS NOT THE INTENT OF THIS REVIEW TO PROVIDE A PUNCH
 LIST FOR YOUR DESIGN PROFESSIONAL, BUT IF THERE ARE ANY
 QUESTIONS, PLEASE DO NOT HESITATE TO CONTACT:
 MIKE ALBARRAN, ELECTRICAL PLANS REVIEWER CITY OF WEST
 PALM BEACH
 PH: (561) 805-6718

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2014-05-03 Cont ID  
Sent By MGONZALE Date 2014-05-03 Time   Rev Time 0.25
Received By mgonzale Date 2014-05-03 Time   Sent To B
Notes
2014-05-03 10:56:09PROVISO:
  
 NO DOMESTIC WATER AND SEWER IS SHOWN ON PLANS. PROVIDE
 INFORMATION AT NEXT REVISION
  
 CONTACT.
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES AND PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2014-03-28 Cont ID  
Sent By skennedy Date 2014-03-19 Time 16:56 Rev Time 0.00
Received By mgonzale Date 2014-03-28 Time   Sent To Z
Notes
2014-03-28 12:54:30PROVIDE LOCATION OF WATER AND SEWER SERVICES
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2014-02-24 Cont ID  
Sent By fmittner Date 2014-02-24 Time 14:29 Rev Time 0.00
Received By fmittner Date 2014-02-24 Time 14:29 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2014-05-16 Cont ID  
Sent By skennedy Date 2014-05-16 Time 10:56 Rev Time 0.00
Received By skennedy Date 2014-05-15 Time 17:07 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2014-05-11 Cont ID  
Sent By skennedy Date 2014-05-11 Time 14:56 Rev Time 0.00
Received By skennedy Date 2014-04-16 Time 12:51 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-03-28 Cont ID  
Sent By skennedy Date 2014-03-28 Time 13:19 Rev Time 0.00
Received By skennedy Date 2014-02-24 Time 17:08 Sent To  
Notes
2014-02-24 17:09:00SENT TO R14 SHELF FOR REVIEW. JG.

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status P Date 2014-05-11 Cont ID  
Sent By skennedy Date 2014-05-11 Time 14:52 Rev Time 0.00
Received By skennedy Date 2014-05-11 Time 14:52 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2014-03-16 Cont ID  
Sent By skennedy Date 2014-03-16 Time 13:26 Rev Time 0.00
Received By skennedy Date 2014-03-16 Time 13:25 Sent To  
Notes
2014-03-16 13:26:58IMPACT FEE ASSESSMENT BY PALM BEACH COUNTY REQUIRED.
 THE PLANS ARE TO BE STAMPED AND RECEIPT PROVIDED.
 CONTACT 561 233 5100.

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2014-05-16 Cont ID  
Sent By skennedy Date 2014-05-16 Time 10:55 Rev Time 0.00
Received By skennedy Date 2014-05-16 Time 10:55 Sent To  
Notes
2014-05-16 10:55:26SEE PROVISO ON PLAN, APPLICANT HAS AGREED TO SUBMIT
 REVISION UPON COMPLETION OF DESIGN.

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2014-05-11 Cont ID  
Sent By skennedy Date 2014-05-11 Time 14:53 Rev Time 0.00
Received By skennedy Date 2014-05-11 Time 14:53 Sent To  
Notes
2014-05-11 14:56:23SECOND REVIEW:
  
 THE ENERGY SUBMITTAL MUST CONTAIN AN EQUIPMENT SIZING
 CALCULATION PER FBC-E 403.2.5
 FBC 107.3.5.1.6 ENERGY CALCULATIONS - PROVIDE AN ENERGY
 SUBMITTAL COMPLIANT WITH FBC-E 103
 FBC- 107.3.5.3 PROVIDE AN EQUIPMENT SCHEDULE TO LIST
 THE PROPOSED SYSTEM EQUIPMENT TO BE CHECKED TO COMPLY
 WITH THE SIZING CALCULATION.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2014-03-16 Cont ID  
Sent By skennedy Date 2014-03-19 Time 10:00 Rev Time 0.00
Received By skennedy Date 2014-03-16 Time 13:57 Sent To  
Notes
2014-03-16 14:03:50FBC 107.3.5.1.6 ENERGY CALCULATIONS - PROVIDE AN ENERGY
 SUBMITTAL COMPLIANT WITH FBC-E 103
 FBC- 107.3.5.3 ? PROVIDE A MECHANICAL PLAN TO SHOW BATH
 EXHAUST PER FBC-R M15 AND UPDATE THE EQUIPMENT SCHEDULE
 TO LIST THE PROPOSED SYSTEM EQUIPMENT. SHOW THE
 LOCATIONS OF THE A/C CONDENSING UNITS. SHOW KITHEN AND
 BATH EXHAUST.

Review Stop P PLUMBING
Rev No 4 Status P Date 2014-05-16 Cont ID  
Sent By skennedy Date 2014-05-16 Time 10:55 Rev Time 0.00
Received By skennedy Date 2014-05-16 Time 10:55 Sent To  
Notes
2014-05-16 10:54:53SEE PROVISO ON PLAN, APPLICANT HAS AGREED TO SUBMIT
 REVISION UPON COMPLETION OS DESIGN.

Review Stop P PLUMBING
Rev No 3 Status P Date 2014-05-15 Cont ID  
Sent By skennedy Date 2014-05-15 Time 14:25 Rev Time 0.00
Received By skennedy Date 2014-05-15 Time 14:25 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2014-05-11 Cont ID  
Sent By skennedy Date 2014-05-11 Time 14:51 Rev Time 0.00
Received By skennedy Date 2014-05-11 Time 12:30 Sent To  
Notes
2014-05-11 14:51:48SECOND REVIEW:
  
 FBC 107.3.5.3 RESIDENTIAL - PROVIDE THE LOCATION OF THE
 PROPOSED WATER METER AND THE SEWER TIE-IN. THE PLUMBING
 WASTE DIAGRAM SHOULD SHOW A CONNECTION TO THE SEWER AND
 THE BUILDING SEWER TO THE SEWER TIE-IN. PLEASE NOTE:
 THERE IS A NOTE FROM THE ENGINEER THAT THE PLUMBING
 WASTE RISER IS FOR REFERENCE AND THE PLUMBER IS TO
 PROVIDE SHOP DRAWINGS FOR REVIEW BY ENGINEER OF RECORD.
  
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2014-03-16 Cont ID  
Sent By skennedy Date 2014-03-16 Time 14:06 Rev Time 0.00
Received By skennedy Date 2014-03-16 Time 14:06 Sent To E
Notes
2014-03-16 14:21:11FBC 107.3.5.3 RESIDENTIAL - PROVIDE THE LOCATION OF THE
 PROPOSED WATER METER AND THE SEWER TIE-IN. THE PLUMBING
 WASTE DIAGRAM SHOULD SHOW A CONNECTION TO THE SEWER AND
 THE BUILDING SEWER TO THE SEWER TIE-IN. PLEASE NOTE:
 THERE IS A NOTE FROM THE ENGINEER THAT THE PLUMBING
 WASTE RISER IS FOR REFERENCE AND THE PLUMBER IS TO
 PROVIDE SHOP DRAWINGS FOR REVIEW BY ENGINEER OF RECORD.
  
  

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status P Date 2014-05-15 Cont ID  
Sent By skennedy Date 2014-05-15 Time 14:25 Rev Time 0.00
Received By skennedy Date 2014-05-15 Time 14:25 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2014-02-24 Cont ID  
Sent By fmittner Date 2014-02-24 Time 14:29 Rev Time 0.00
Received By fmittner Date 2014-02-24 Time 14:29 Sent To  
Notes
***NONE***