Plan Review Stops For Permit 14020586 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2014-05-11 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2014-05-11 |
Time |
12:17 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2014-05-11 |
Time |
12:06 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2014-04-25 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2014-04-25 |
Time |
11:31 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2014-04-25 |
Time |
11:31 |
Sent To |
|
|
Notes |
2014-04-25 11:59:29 | AS INDICATED PREVIOUSLY IN THE PLUMBING REVIEW COMMENT | | OF 3/14/14, PROVIDE DETAILS FOR THE CONSTRUCTION OF | | WALLS AND A DOOR FOR AFFORDING PRIVACY TO THE BATHROOM. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2014-03-16 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2014-03-16 |
Time |
11:38 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2014-03-16 |
Time |
11:38 |
Sent To |
|
|
Notes |
2014-03-16 11:34:11 | FBC 107.3.4 - PRODUCT APPROVALS FOR THOSE PRODUCTS | | WHICH ARE REGULATED BY DCA RULE 9N-3 ARE TO BE REVIEWED | | AND APPROVED IN WRITING BY THE DESIGNER OF RECORD. | | | | STEVEN KENNEDY, CBO | | CHIEF PLANS EXAMINER | | (561) 805-6710 | | [email protected] | | | | | | | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
P |
Date |
2014-05-11 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2014-05-11 |
Time |
12:17 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2014-05-11 |
Time |
12:17 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
F |
Date |
2014-04-25 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2014-04-25 |
Time |
11:59 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2014-04-25 |
Time |
11:59 |
Sent To |
|
|
Notes |
2014-04-25 12:02:22 | NO CIRCUIT IS SHOW FOR MECHANICAL EXHAUST WHICH MUST BE | | PROVIDED FOR THE BATH. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2014-03-16 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2014-03-16 |
Time |
11:24 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2014-03-14 |
Time |
15:51 |
Sent To |
|
|
Notes |
2014-03-16 11:39:17 | MINIMUM PLAN REVIEW CRITERIA. FBC- 107.3.5.3 ? | | | | PROVIDE LOAD CALCULATIONS BASED ON THE NEW ACTUAL | | CONNECTED LOAD. CALCULATIONS INDICATE 2 SMALL APPLIANCE | | KITCHEN CIRCUITS. THIS SHOULD BE REMOVED AS A KITCHEN | | MAY NOT BE PERMITTED WITHIN THE STRUCTURE. THE LOAD | | CALCULATIONS SHOULD INDUCATE THE EXISTING SERVICE IS | | ADEQUATE TO ACCOMODATE THE NEW, ALTHOUGH SMALL, | | PROPOSED LOAD. NOTE INDICATES GFI FOR BATH AREA, NO GFI | | TO SERVICE BATH IS PROVIDED. | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2014-05-11 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2014-05-11 |
Time |
12:18 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2014-05-01 |
Time |
07:20 |
Sent To |
|
|
Notes |
2014-05-01 07:20:33 | INCOMING S. KENNEDY'S DESK . JW |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2014-04-25 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2014-04-25 |
Time |
12:05 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2014-04-16 |
Time |
09:58 |
Sent To |
|
|
Notes |
2014-04-17 09:59:02 | TO SAK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2014-03-16 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2014-03-16 |
Time |
11:41 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2014-02-14 |
Time |
10:57 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
3 |
Status |
N |
Date |
2014-05-11 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2014-05-11 |
Time |
12:17 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2014-05-11 |
Time |
12:17 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
F |
Date |
2014-04-25 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2014-04-25 |
Time |
12:02 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2014-04-25 |
Time |
12:02 |
Sent To |
|
|
Notes |
2014-04-25 12:03:07 | SEE PREVIOUS COMMENT WHICH WAS NOT ADDRESS IN | | RESUBMITTAL. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2014-03-16 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2014-03-16 |
Time |
11:36 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2014-03-16 |
Time |
11:36 |
Sent To |
|
|
Notes |
2014-03-16 11:37:56 | FBC- 107.3.5.3 ? PROVIDE A MECHANICAL PLAN TO SHOW | | VENTILATION/EXHAUST FOR BATHROOM. |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
P |
Date |
2014-05-11 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2014-05-11 |
Time |
12:18 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2014-05-11 |
Time |
12:18 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
F |
Date |
2014-04-25 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2014-04-25 |
Time |
12:03 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2014-04-25 |
Time |
12:03 |
Sent To |
|
|
Notes |
2014-04-25 12:05:29 | SEE PREVIOUS COMMENTS WHICH WERE NOT ADDRESS IN | | RESUBMITTAL. |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2014-03-16 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2014-03-14 |
Time |
15:51 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2014-03-14 |
Time |
15:51 |
Sent To |
|
|
Notes |
2014-03-16 11:19:33 | PLAN INDICATES CONNECTION TO SEPTIC TANK, SHOW EVIDENCE | | OF AN APPROVED PRIVATE SEWAGE DISPOSAL SYSTEM IN | | ACCORDANCE WITH CHAPTER 64E-6, FLORIDA ADMINISTRATIVE | | CODE. | | IS THE BATHROOM TO BE AFFORDED PRIVACY? IF SO, SHOW | | PARTITION AND DOOR DETAILS. | | FBC R306.3 SEWAGE DISPOSAL. | | ALL PLUMBING FIXTURES SHALL BE CONNECTED TO A SANITARY | | SEWER OR TO AN APPROVED PRIVATE SEWAGE DISPOSAL SYSTEM | | IN ACCORDANCE WITH CHAPTER 64E-6, FLORIDA | | ADMINISTRATIVE CODE, STANDARDS FOR ONSITE SEWAGE | | TREATMENT AND DISPOSAL SYSTEMS.. | | | | SHOW CLEANOUTS REQUIRED PER FBC R-P3005.2 | | SHOW HORIZONTAL DRAINAGE PIPE SLOPING PER FBC R-P3005.2 | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2014-02-27 |
|
|
Cont ID |
|
Sent By |
dkittred |
Date |
2014-02-25 |
Time |
14:32 |
Rev Time |
0.00 |
Received By |
dkittred |
Date |
2014-02-25 |
Time |
13:41 |
Sent To |
|
|
Notes |
2014-02-25 14:32:31 | 2/25/14 SENT BACK TO R02. DK | | | 2014-02-25 14:31:59 | PLANNING AND ZONING COMMENTS: | | | | 2/25/14 (UPDATED 2/27/14) | | | | 1. DETACHED GARAGE SIZE AND SETBACKS REVIEWED ONLY. A | | SEPARATE PERMIT IS REQUIRED FOR THE PROPOSED DRIVEWAY. | | (NOTE: NEW DRIVEWAY CANNOT EXCEED 10 FEET IN WIDTH.) | | | | 2. IF ANY TREES WILL BE REMOVED OR RELOCATED DUE TO THE | | PROPOSED CONSTRUCTION, A TREE ALTERATION APPLICATION | | WILL NEED TO BE SUBMITTED THROUGH THE PLANNING DIVISION | | AND RECEIVE APPROVAL. | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT: | | | | DANIELLE J. KITTREDGE, AICP | | SENIOR PLANNER | | PLANNING & ZONING DIVISION | | PHONE: (561)-822-1443 | | EMAIL: [email protected] | | | 2014-02-24 14:11:03 | 2/24/14 |
|
|