Plan Review Details - Permit 14020366
Plan Review Stops For Permit 14020366
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2014-03-18 Cont ID  
Sent By skennedy Date 2014-03-18 Time 12:15 Rev Time 0.00
Received By skennedy Date 2014-03-18 Time 12:15 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2014-03-18 Cont ID  
Sent By mgonzale Date 2014-03-18 Time   Rev Time 1.00
Received By mgonzale Date 2014-03-18 Time   Sent To B
Notes
2014-03-18 10:06:20PASSED WITH PROVISOS:
  
 #1 PAVING SHALL NOT ALTER THE HEIGHT OF ROADWAY
 #2 NEW PAVING SHALL NOT CAUSE ADVERSE STORMWATER
 EFFECTS
 #3 THERMO PLASTIC STRIPING IS HIGHLY RECOMMENED AS
 DRIVEWAY APPROCHES PALM BEACH COUNTY ROADWAY (JOG ROAD)
 #4 MUTCD MANUAL SHOULD BE CONSULTED IF REPLACEMENT OF
 SIGNS AND IF ROAD TRAFFIC ELEMENTS ARE DISTURBED.
 #5 FDOT TRUNCATED DOMES SHOULD BE INSTALLED AT ANY AND
 ALL PEDESTRIAN CROSSINGS.
 #6 CONTRACTOR FINAL CERTIFICATION IS REQUIRED
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES AND PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2014-03-18 Cont ID  
Sent By skennedy Date 2014-03-18 Time 12:15 Rev Time 0.00
Received By skennedy Date 2014-02-11 Time 16:13 Sent To  
Notes
2014-02-11 16:13:50SENT TO ZONING BOX

Review Stop Z ZONING
Rev No 1 Status P Date 2014-03-03 Cont ID  
Sent By ESchneid Date 2014-03-03 Time 14:54 Rev Time 0.25
Received By eschneid Date 2014-02-12 Time   Sent To ENG
Notes
2014-02-12 11:35:482/12/14 ZONING RECEIVED. SENT TO ES FOR REVIEW


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved