Plan Review Stops For Permit 13121112 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2014-03-06 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2014-03-06 |
Time |
18:09 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2014-03-06 |
Time |
18:09 |
Sent To |
|
|
Notes |
2014-02-27 08:47:43 | 2/26/14 ZONING RESUB SENT TO LL. SG |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2014-02-22 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2014-02-22 |
Time |
12:04 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2014-02-22 |
Time |
12:04 |
Sent To |
|
|
Notes |
2014-02-22 12:05:55 | ****CORRECTIONS**** | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | 561-805-6724 [email protected] | | FBC FLORIDA BUILDING CODE 2010 | | FBC R FLORIDA BUILDING CODE 2010 RESIDENTIAL | | | | COMMENTS FROM PREVIOUS LIST NOT ADDRESSED: | | | | 1. PROVIDE A LEGIBLE PLAN TO PROVIDE THE FOLLOWING | | INFORMATION: | | | | TOTAL NUMBER OF PARKING SPACES | | NUMBER OF ACCESSIBLE SPACES | | LOCATION OF ACCESSIBLE ENTRANCES | | LOCATION OF ACCESSIBLE SPACES AND ACCESS AISLES | | SHOW ACCESSIBLE ROUTE FROM PUBLIC WAY | | ACCESSIBLE ROUTE FROM ACCESSIBLE SPACE TO ACCESSIBLE | | ENTRANCE | | | | SEE FBC 2010 ACCESSIBLITY 202.3 (ALTERATIONS), 208.2 | | (PARKING SPACES), 502 (PARKING SPACES), 206 (ACCESSIBLE | | ROUTE). | | | | YOU MAY FIND THE FOLLOWING DOCUMENT USEFUL, | | PARTICULARLY THE INTRODUCTION: "WHEN A BUSINESS | | RESTRIPES A PARKING LOT, IT MUST PROVIDE ACCESSIBLE | | PARKING SPACES AS REQUIRED BY THE ADA STANDARDS FOR | | ACCESSIBLE DESIGN." | | | | HTTP://WWW.ADA.GOV/RESTRIPE.HTM | | | | 2. FBC 2010 ACCESSIBILITY ADVISORY 502.3, WHERE THE | | ACCESSIBLE ROUTE MUST CROSS VEHICULAR TRAFFIC LANES, | | MARKED CROSSINGS ENHANCE PEDESTRIAN SAFETY; PLEASE | | INDICATE LOCATION ON PLAN. | | | | 3. THE INDIVIDUAL TAKING RESPONSIBILITY SHALL PROVIDE | | THEIR PRINTED NAME AND SIGNATURE ON THE PLAN, FBC 107. | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2014-01-17 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2014-01-17 |
Time |
18:09 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2014-01-17 |
Time |
18:09 |
Sent To |
ENG |
|
Notes |
2014-01-17 18:09:52 | ****CORRECTIONS**** | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | 561-805-6724 [email protected] | | FBC FLORIDA BUILDING CODE 2010 | | FBC R FLORIDA BUILDING CODE 2010 RESIDENTIAL | | | | 1. PROVIDE A LEGIBLE PLAN TO PROVIDE THE FOLLOWING | | INFORMATION: | | | | TOTAL NUMBER OF PARKING SPACES | | NUMBER OF ACCESSIBLE SPACES | | LOCATION OF ACCESSIBLE ENTRANCES | | LOCATION OF ACCESSIBLE SPACES AND ACCESS AISLES | | SHOW ACCESSIBLE ROUTE FROM PUBLIC WAY | | ACCESSIBLE ROUTE FROM ACCESSIBLE SPACE TO ACCESSIBLE | | ENTRANCE | | | | SEE FBC 2010 ACCESSIBLITY 202.3 (ALTERATIONS), 208.2 | | (PARKING SPACES), 502 (PARKING SPACES), 206 (ACCESSIBLE | | ROUTE). | | | | YOU MAY FIND THE FOLLOWING DOCUMENT USEFUL, | | PARTICULARLY THE INTRODUCTION: "WHEN A BUSINESS | | RESTRIPES A PARKING LOT, IT MUST PROVIDE ACCESSIBLE | | PARKING SPACES AS REQUIRED BY THE ADA STANDARDS FOR | | ACCESSIBLE DESIGN." | | | | HTTP://WWW.ADA.GOV/RESTRIPE.HTM | | | | 2. FBC 2010 ACCESSIBILITY ADVISORY 502.3, WHERE THE | | ACCESSIBLE ROUTE MUST CROSS VEHICULAR TRAFFIC LANES, | | MARKED CROSSINGS ENHANCE PEDESTRIAN SAFETY; PLEASE | | INDICATE LOCATION ON PLAN. | | | | 3. THE INDIVIDUAL TAKING RESPONSIBILITY SHALL PROVIDE | | THEIR PRINTED NAME AND SIGNATURE ON THE PLAN, FBC 107. | | | | |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
3 |
Status |
P |
Date |
2014-02-26 |
|
|
Cont ID |
|
Sent By |
mgonzale |
Date |
2014-02-26 |
Time |
12:06 |
Rev Time |
1.00 |
Received By |
mgonzale |
Date |
2014-02-26 |
Time |
12:05 |
Sent To |
Z |
|
Notes |
2014-02-26 12:30:31 | NO OBJECTION: | | | | PLAN SHOWS | | #1 DIRECTIONAL TRAFFIC FLOW ARROWS. THESE MUST APPEAR | | ON PAVEMENT. | | #2 PARKING 5 WAS ELEMINITANTED AS THIS AREA MAY BE | | UTILIZE FOR FUTURE DUMPSTER ACCESS. | | #3 AREA AROUND EXISTING SIGN MUST BE STRIPED AS SHOWN | | TO AVOID VEHICULAR TRAFFIC. | | | | MANUEL JULIAN GONZALEZ | | ENGINEERING PROJECT COORDINATOR | | ENGINEERING SERVICES AND PUBLIC WORKS DEPARTMENT | | 401 CLEMATIS STREET, 4TH FLOOR | | WEST PALM BEACH, FL 33401 | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | MAIN PHONE: (561) 822-1200 | | DIRECT: (561) 494-1085 | | FAX: (561) 494-1116 | | MOBILE: (561) 644-7301 | | EMAIL: [email protected] | | WWW.WPB.ORG/ENGINEERING | | |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
2 |
Status |
F |
Date |
2014-02-13 |
|
|
Cont ID |
|
Sent By |
MGONZALE |
Date |
2014-02-13 |
Time |
|
Rev Time |
0.25 |
Received By |
mgonzale |
Date |
2014-02-13 |
Time |
|
Sent To |
B |
|
Notes |
2014-02-13 15:51:08 | PLEASE RESPOND TO COMMENTS IN WRITTING: | | | | #1 PLAN DOES NOT SHOW DETAIL OF PARKING DIMENSIONS, | | SETBACKS, AND DRIVE ISLES. | | | | #2 PROVIDE A SURVEY OF THE PROPERTY IF AVAILABLE. | | | | #3 ADA PARKING MUST SHOW ACCESSABILITY TO ADA ACCESS | | (AKA BUILDING ENTRY) | | | | MANUEL JULIAN GONZALEZ | | ENGINEERING PROJECT COORDINATOR | | ENGINEERING SERVICES AND PUBLIC WORKS DEPARTMENT | | 401 CLEMATIS STREET, 4TH FLOOR | | WEST PALM BEACH, FL 33401 | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | MAIN PHONE: (561) 822-1200 | | DIRECT: (561) 494-1085 | | FAX: (561) 494-1116 | | MOBILE: (561) 644-7301 | | EMAIL: [email protected] | | WWW.WPB.ORG/ENGINEERING | | |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
F |
Date |
2014-01-27 |
|
|
Cont ID |
|
Sent By |
Mgonzale |
Date |
2014-01-27 |
Time |
|
Rev Time |
1.00 |
Received By |
mgonzale |
Date |
2014-01-27 |
Time |
|
Sent To |
I |
|
Notes |
2014-01-27 12:10:35 | PROVIDE SIGNS AS REQUIRED. STOP SIGN AND STOP BAR, ETC. | | | | FOLLOWS PLANNING COMMENTS. | | | | [email protected] |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2014-03-06 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2014-03-06 |
Time |
18:10 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2014-02-26 |
Time |
18:48 |
Sent To |
|
|
Notes |
2014-02-26 18:34:18 | SENT TO ZONING |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2014-02-22 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2014-02-22 |
Time |
12:05 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2014-02-11 |
Time |
06:05 |
Sent To |
|
|
Notes |
2014-02-12 06:05:51 | INCOMING SENT TO ZONING BOX. JW |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2014-02-12 |
|
|
Cont ID |
|
Sent By |
jwitmer |
Date |
2014-01-27 |
Time |
06:04 |
Rev Time |
0.00 |
Received By |
jwitmer |
Date |
2013-12-30 |
Time |
18:14 |
Sent To |
|
|
Notes |
2013-12-30 18:14:33 | SENT TO ZONING BOX. |
|
|
Review Stop |
Z |
ZONING |
Rev No |
3 |
Status |
P |
Date |
2014-02-27 |
|
|
Cont ID |
|
Sent By |
sgraham |
Date |
2014-02-28 |
Time |
08:48 |
Rev Time |
0.00 |
Received By |
sgraham |
Date |
2014-02-27 |
Time |
08:48 |
Sent To |
B |
|
Notes |
2014-02-28 16:38:59 | ZONING APPROVED WITH THE FOLLOWING PROVISO: | | | | 1.) PARKING STALL STRIPING SHALL COMPLY WITH ZLDR | | S.94-485. STRIPING DETAIL ATTACHED WITH PLANS. | | | | | 2014-02-27 08:49:04 | 2/26/14 ZONING RESUB SENT TO LL SG |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
F |
Date |
2014-02-13 |
|
|
Cont ID |
|
Sent By |
LLouie |
Date |
2014-02-13 |
Time |
15:14 |
Rev Time |
0.00 |
Received By |
llouie |
Date |
2014-02-12 |
Time |
|
Sent To |
ENG |
|
Notes |
2014-02-13 15:24:45 | ** FAILED ** | | | | THE SCOPE OF WORK HAD CHANGED IN THE RE-SUBMITTAL. | | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE | | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE | | APPLICABLE: | | | | 1.) THE SUBMITTED PLAN SHOWS CONFLICT WITH THE LOCATION | | OF PARKING STALL 7 WITH AN EXISTING POLE SIGN THAT IS | | NOT ILLUSTRATED IN THE PLAN. EITHER RELOCATE OR REMOVE | | PARKING STALL 7 FROM THE PLAN. | | | | NOTE: THE STRIPPING WILL NEED TO COMPLY WITH ZLDR | | S.94-485(J). A STRIPPING DETAIL WILL BE INCLUDED IN THE | | CONTRACTOR'S SET. | | | | PLEASE NOTE THAT ANY REVISIONS MAY RESULT IN ADDITIONAL | | COMMENTS. CONTACT LINDA LOUIE @ (561) 822-1458 IF YOU | | HAVE QUESTIONS. | | | 2014-02-12 11:46:48 | 2/12/14 ZONING RECEIVED. SENT TO LL FOR REVIEW. SG |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2014-01-07 |
|
|
Cont ID |
|
Sent By |
llouie |
Date |
2014-01-07 |
Time |
10:21 |
Rev Time |
0.00 |
Received By |
llouie |
Date |
2014-01-07 |
Time |
10:21 |
Sent To |
B |
|
Notes |
2014-01-07 10:23:23 | ** FAILED ** | | | | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE | | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE | | APPLICABLE: | | | | 1.) IF THE SCOPE OF WORK CONSISTS OF ONLY RE-STRIPPING | | AND SEALCOATING THE EXISTING PARKING AREA, THEN AN | | APPROVED (SITE) PLAN, SHOWING THE LOCATION AND APPROVED | | NUMBER OF ALL PARKING SPACES ON THE PROPERTY SHALL BE | | SUBMITTED. THE APPLICANT MAY WISH TO CONTACT THE | | CONSTRUCTION SERVICES DEPARTMENT AT (561) 805-6700 TO | | SEE IF THERE IS AN APPROVED SITE PLAN ON FILE. | | | | 2.) THE SCOPE OF WORK SEEMS TO BE LOCATED ON TWO | | SEPARATE PARCELS. REQUIRED PARKING SHALL BE LOCATED ON | | THE PARCEL ON WHICH THE USE IS SERVED. | | | | 3.) PARKING CANNOT BE PROVIDED ON THE PARCEL TO THE | | SOUTH UNLESS THE PARCELS ARE JOINED BY A UNITY OF | | TITLE. (ZLDR S.94-485(C)) | | | | 4.) THE PARKING AREA SHALL BE RE-STRIPPED IN ACCORDANCE | | WITH ZLDR S. 94-485(J), FIGURE XV-2) | | | | 5.) ALL STANDARD PARKING STALLS MUST BE A MINIMUM OF | | EIGHT (8) FEET AND SIX (6) INCHES IN WIDTH, AND | | EIGHTEEN (18) FEET IN LENGTH. (ZLDR S. 94-485(N)) | | | | 6.) ALL HANDICAPPED PARKING SPACES SHALL BE A MINIMUM | | OF TWELVE (12) FEET WIDE AND EIGHTEEN (18) FEET LONG. | | (ZLDR 94-485(O)(2)) | | | | 7.) PROVIDE THE DIMENSIONS FOR THE PARKING STALLS, | | DRIVE AISLES AND INGRESS/EGRESS. | | | | PLEASE NOTE THAT ANY REVISIONS MAY RESULT IN ADDITIONAL | | COMMENTS. CONTACT LINDA LOUIE @ (561) 822-1442 IF YOU | | HAVE QUESTIONS. | | |
|
|