Plan Review Details - Permit 13110505
Plan Review Stops For Permit 13110505
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2014-03-31 Cont ID  
Sent By skennedy Date 2014-03-31 Time 10:51 Rev Time 0.00
Received By skennedy Date 2014-03-31 Time 10:51 Sent To  
Notes
2014-03-31 10:52:37ONLY ONE COPY A SURVEY WAS SUBMITTED. AN ADDITIONAL
 SURVEY IS REQUIRED. OTHERWISE, THE SUBMITTALL IS
 APPROVED EXCEPT FOR THE ELECTRICAAL COMMENTS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2013-12-06 Cont ID  
Sent By shill Date 2013-12-06 Time 11:10 Rev Time 0.00
Received By shill Date 2013-12-06 Time 11:10 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status N Date 2014-04-03 Cont ID  
Sent By skennedy Date 2014-04-03 Time 14:08 Rev Time 0.00
Received By skennedy Date 2014-04-03 Time 14:08 Sent To  
Notes
2014-04-03 14:09:37SEPARATE ELECTRICAL SUBMITTAL REQUIRED FOR SITE
 LIGHTING.

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2014-03-31 Cont ID  
Sent By skennedy Date 2014-03-31 Time 10:46 Rev Time 0.00
Received By skennedy Date 2014-03-31 Time 10:46 Sent To  
Notes
2014-03-31 10:51:02ONLY ONE COPY OF A PHOTO METRICS PLAN WAS SUBMITTED. A
 SECOND COPY IS REQUIRED TO BE SUBMITTED. THE PLAN
 INDICATES ELECTRICAL SITE LIGHTING IS PROPOSED. THIS
 WILL REQUIRE AN ELECTRICAL PERMIT FOR SITE LIGHTING
 WORK. THE APPLICANT MAY CHOOSE TO SUBMIT ELECTRICAL
 DETAILS UNDER A SEPARATE PERMIT, OR INCORPORATE THAT
 WORK INTO THIS SUBMITTAL.

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2014-03-28 Cont ID  
Sent By mgonzale Date 2014-03-28 Time   Rev Time 2.00
Received By mgonzale Date 2014-03-28 Time   Sent To I
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2013-12-10 Cont ID  
Sent By mgonzale Date 2013-12-10 Time   Rev Time 0.25
Received By mgonzale Date 2013-12-10 Time   Sent To I
Notes
2013-12-10 06:17:29ADDRESS PLANNING COMMENT:
  
 IN ADDITION ADDRESS IF CHURCH WILL REQUIRE A DUMPSTER.
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES AND PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2014-03-31 Cont ID  
Sent By skennedy Date 2014-03-31 Time 10:52 Rev Time 0.00
Received By skennedy Date 2014-02-14 Time 11:39 Sent To  
Notes
2014-02-27 11:49:58SENT TO ENG BOX.
2014-02-15 11:39:28SENT TO ZONING BOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2013-12-12 Cont ID  
Sent By lwagner Date 2013-12-12 Time 09:03 Rev Time 0.00
Received By lwagner Date 2013-11-15 Time 11:07 Sent To  
Notes
2013-12-06 11:10:4712/6 TO ENGINEERING
  
2013-11-21 11:11:14MISC 2 BOX.
2013-11-15 11:07:25ROUTED TO ZONING

Review Stop P PLUMBING
Rev No 2 Status P Date 2014-03-31 Cont ID  
Sent By skennedy Date 2014-03-31 Time 10:24 Rev Time 0.00
Received By skennedy Date 2014-03-31 Time 10:24 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2013-12-12 Cont ID  
Sent By lwagner Date 2013-12-12 Time 09:03 Rev Time 0.00
Received By lwagner Date 2013-12-12 Time 08:51 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2014-02-27 Cont ID  
Sent By AAponte Date 2014-02-27 Time 11:48 Rev Time 0.00
Received By aaponte Date 2014-02-18 Time 12:31 Sent To  
Notes
2014-02-27 11:49:34PROVISO: A UNITY OF TITLE SHALL BE FILED AND APPROVED
 BY THE CITY (PARKIGN LOT + CHURCH PROPERTY).
2014-02-18 12:30:502/18/14 RESUB ZONING, SENT TO AA FOR REVIEW

Review Stop Z ZONING
Rev No 1 Status F Date 2013-11-21 Cont ID  
Sent By aaponte Date 2013-11-21 Time 11:07 Rev Time 0.00
Received By aaponte Date 2013-11-19 Time 13:21 Sent To  
Notes
2013-11-21 11:10:481. SITE PLAN APPROVAL PROCESS NEEDS COMPLETION BEFORE
 PERMIT CAN BE APPROVED.
 2. UNITY OF TITLE REQUIRED WITH CHURCH PARCEL.
 3.PLEASE PROVIDE PHOTOMETRICS FOR PARKING LOT.
 4. STRIPPING DETAIL SHALL COMPLY WITH CITY STANDARDS.
 FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA
 APONTE AT 561-822-1439.
2013-11-19 13:23:3211/19/13 - ZONING RECEIVED. SENT TO AA FOR REVIEW. LL


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved