Plan Review Details - Permit 13110134
Plan Review Stops For Permit 13110134
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2013-11-09 Cont ID  
Sent By rmcdouga Date 2013-11-09 Time 08:25 Rev Time 0.00
Received By rmcdouga Date 2013-11-09 Time 08:25 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2013-11-08 Cont ID  
Sent By mgonzale Date 2013-11-08 Time   Rev Time 1.00
Received By   Date 2013-11-08 Time   Sent To B
Notes
2013-11-08 11:34:32PROVISO:
  
 KEEP STORM WATER ON-SITE.
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES AND PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2013-11-09 Cont ID  
Sent By rmcdouga Date 2013-11-09 Time 08:26 Rev Time 0.00
Received By rmcdouga Date 2013-11-05 Time 13:21 Sent To  
Notes
2013-11-06 13:21:20SENT TO ZONING BOX

Review Stop Z ZONING
Rev No 1 Status P Date 2013-11-07 Cont ID  
Sent By llouie Date 2013-11-07 Time 13:19 Rev Time 0.00
Received By llouie Date 2013-11-07 Time 13:19 Sent To ENG
Notes
2013-11-07 13:19:45PASSED WITH PROVISO: CONCRETE SLABS SHALL BE SET BACK
 AT LEAST 2 FT. FROM THE PROPERTY LINES.
  
 SENT TO ENGINEERING FOR REVIEW ON DRAINAGE.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved