Plan Review Stops For Permit 13101138 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2013-12-18 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-12-18 |
Time |
06:56 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-12-17 |
Time |
18:56 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2013-12-05 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-12-05 |
Time |
10:09 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-12-05 |
Time |
06:09 |
Sent To |
|
|
Notes |
2013-12-04 18:05:49 | 2010 FBC | | | | DENIED BY BUILDING | | | | 1) FOR RE-ROOFING OF THE UTILITY ROOM. SPECIFY THE | | FASTENING OPTION LISTED ON PAGE 17 OF NOA NO. | | 07-1219.09 THAT WILL BE USED TO INSTALL THIS SYSTEM. | | SUBMIT TWO SETS OF RAS 117 CALCULATIONS FOR ENHANCED | | FASTENING AT THE PERIMETER AND CORNER AREAS AS REQUIRED | | BY LIMITATION #7 ON PAGE 19 OF THE PRODUCT APPROVAL. | | | | 2) BASED ON THE CONTRACT THAT WAS SUBMITTED THE PERMIT | | VALUE FOR THE WORK WAS INCREASED FROM $ 25,900.00 TO $ | | 53,500.00. CITY AMENDMENTS 109.3 | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | [email protected] |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2013-12-18 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-12-18 |
Time |
07:47 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-12-17 |
Time |
18:56 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2013-12-04 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-12-04 |
Time |
19:00 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-12-04 |
Time |
18:52 |
Sent To |
|
|
Notes |
2013-12-04 18:58:30 | 2010 FBC / 2008 NEC | | | | DENIED BY ELECTRICAL | | | | 1) SUBMIT TWO SETS OF LOAD CALCULATIONS FOR THE | | DWELLING UNIT INCLUDING ALL OF THE NEW ELECTRICAL | | EQUIPMENT. CITY AMENDMENTS 107.3.5.3 | | | | 2) SUBMIT TWO COPIES OF A PANEL SCHEDULE FOR THE | | EXISTING SERVICE INCLUDING ALL NEW AND UPGRADED | | CIRCUITS. CITY AMENDMENTS 107.3.5.3 | | | | 3) SUBMIT THE SPECIFICATIONS WITH THE ELECTRICAL | | REQUIREMENTS FOR THE NEW TANKLESS ELECTRIC WATER | | HEATER. NEC 110.3(B) | | | | 4) THE SMOKE ALARMS ARE TO BE LOCATED IN THE SLEEPING | | ROOMS SO THAT THEY WILL PROVIDE THE MOST EFFECTIVE | | COVERAGE IN ACCORDANCE WITH THEIR LISTING/LABELING. NEC | | 110.3(B) | | | | 5) THE NAME AND LICENSE NUMBER OF THE PERSON | | RESPONSIBLE FOR THE DESIGN IS REQUIRED TO BE ON THE | | ELECTRICAL DRAWINGS. FS 471.003(2)(H) | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | [email protected] |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2013-12-18 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-12-18 |
Time |
09:28 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-12-16 |
Time |
10:44 |
Sent To |
|
|
Notes |
2013-12-16 10:44:44 | RESUBMITTAL SENT TO R. MCDOUGAL'S DESK FOR REVIEW. JG. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2013-12-05 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-12-05 |
Time |
10:10 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-10-31 |
Time |
10:25 |
Sent To |
|
|
Notes |
2013-11-04 10:26:45 | INCOMING SENT TO BIN R-08. JW |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
P |
Date |
2013-12-18 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-12-18 |
Time |
09:28 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-12-17 |
Time |
18:56 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2013-12-04 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-12-04 |
Time |
18:05 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-12-04 |
Time |
18:05 |
Sent To |
|
|
Notes |
2013-12-04 18:29:22 | 2010 FBC | | | | DENIED BY MECHANICAL | | | | 1) A MECHANICAL PERMIT IS REQUIRED TO REPLACE THE HVAC | | EQUIPMENT AS NOTED IN THE CITY'S WORK SPECIFICATIONS. | | CITY AMENDMENTS 105.1 | | | | 2) SUBMIT TWO COPIES OF EQUIPMENT SIZING CALCULATIONS | | AS SPECIFIED IN THE SCOPE OF WORK. FBCR M1401.3 | | | | 3) SUBMIT TWO SETS OF MECHANICAL PLANS SHOWING THE | | LOCATION OF THE EQUIPMENT, THE SUPPLY DUCT SIZE, | | LOCATION, GRILL SIZES, CFMS AT EACH SUPPLY OUTLET AND | | THE RETURN DUCT SIZE, LOCATION, GRILL SIZES. CITY | | AMENDMENTS 107.3.5.3 | | | | 4) SHOW COMPLIANCE WITH BALANCED RETURN AIR AS REQUIRED | | BY FBCR M1602.4. | | | | 5) PROVIDE AN EQUIPMENT SCHEDULE ON THE PLANS THAT IS | | CONSISTENT WITH THE SIZING CALCULATIONS. THE NAME AN | | LICENSE NUMBER OF THE PERSON RESPONSIBLE FOR THE DESIGN | | IS REQUIRED ON THE MECHANICAL PLANS. CITY AMENDMENTS | | 107.2.1.3 AND FS 471.003 (2) (H) | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | [email protected] |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2013-12-04 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-12-04 |
Time |
16:43 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-12-04 |
Time |
16:43 |
Sent To |
|
|
Notes |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
1 |
Status |
N |
Date |
2013-12-04 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-12-04 |
Time |
17:11 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-12-04 |
Time |
16:44 |
Sent To |
|
|
Notes |
2013-12-04 17:11:02 | RE-ROOF - FLAT ROOF AT REAR UTILITY ROOM 49 SQFT, 9 FT | | MRH | | | | GAF CONVENTIONAL BUILT UP ROOF SYSTEM NOA NO. | | 07-1219.09 | | | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2013-11-14 |
|
|
Cont ID |
|
Sent By |
dkittred |
Date |
2013-11-14 |
Time |
11:44 |
Rev Time |
0.00 |
Received By |
dkittred |
Date |
2013-11-14 |
Time |
11:41 |
Sent To |
|
|
Notes |
2013-11-14 11:40:42 | PLANNING & ZONING COMMENTS: | | | | 11/14/13 | | PREVIOUS COMMENTS REGARDING LANDSCAPING ARE *VOID*. PER | | ANGELLA, CITY HOUSING PROJECT AND NOT REQUIRED. DK | | | 2013-11-06 09:23:53 | PLANNING AND ZONING COMMENTS: ***FAILED*** | | | | 11/6/13 | | THE VALUE OF THE CONSTRUCTION ($35,500) EXCEEDS 50% OF | | THE STRUCTURE'S VALUE ($56,431) ACCORDING TO THE P.B.C. | | PROPERTY APPRAISER'S OFFICE; THEREFORE, PURSUANT TO | | SECTION 94-441(C)(2) OF THE ZONING AND LAND DEVELOPMENT | | REGULATIONS (ZLDR), THE LANDSCAPE ON THE SITE SHALL BE | | IN COMPLIANCE WITH ALL APPLICABLE REGULATIONS FOUND IN | | ARTICLE XIV OF THE ZLDR. IF THE SITE CONFORMS TO | | ARTICLE XIV, THEN TWO (2) COPIES OF A LANDSCAPE PLAN | | DEMONSTRATING COMPLIANCE SHALL BE INCLUDED WITH THE | | PERMIT RE-SUBMITTAL. IF THE SITE DOES NOT CONFORM TO | | ARTICLE XIV, THEN PRIOR TO THE ZONING APPROVAL OF THIS | | PERMIT A SEPARATE LANDSCAPE PERMIT AND IRRIGATION | | PERMIT SHALL BE SUBMITTED SHOWING MATERIAL TO BRING THE | | SITE INTO CONFORMITY. | | (NOTE: ZLDR SEC. 94-442(B)(2)A. ? FOR SINGLE-FAMILY | | DWELLING UNITS, AT LEAST ONE SHADE, FLOWERING, OR FRUIT | | TREE SHALL BE PLANTED FOR EACH 1,200 SQUARE FEET OF | | OPEN SPACE OR PORTION THEREOF. FOR SINGLE-FAMILY | | DWELLING UNITS, AT LEAST ONE SHRUB SHALL BE PLANTED FOR | | EACH 500 SQUARE FEET OF OPEN SPACE OR PORTION THEREOF.) | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT: | | | | DANIELLE J. KITTREDGE, AICP | | SENIOR PLANNER | | PLANNING & ZONING DIVISION | | PHONE: (561)-822-1443 | | EMAIL: [email protected] | | | 2013-11-05 18:10:41 | 11/5/13 |
|
|