Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2013-11-07 Cont ID  
Sent By skennedy Date 2013-11-07 Time 16:05 Rev Time 0.00
Received By skennedy Date 2013-11-07 Time 16:05 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2013-10-11 Cont ID  
Sent By dharvey Date 2013-10-11 Time 11:35 Rev Time 0.00
Received By dharvey Date 2013-10-11 Time 11:32 Sent To  
Notes
2013-10-11 11:35:18NEED TO COMPLY WITH FBC 1603.1.4 FOR WIND DDSIGN DATA
 ON CONSTRUCTION DOCUMENTS.
  
 1) PROVIDE ULTIMATE DESIGN WIND SPEED AND NORMAL DESIGN
 WIND SPEED AS DETERMINED IN ACCORDANCE WITH FBC SECTION
 1609.3.1.
 2) PROVIDE RISK CATEGORY FROM TABLE 1604.5 OR TABLE
 1.5-1 OF ASCE 7.
 3) WIND EXPOSURE.
 4) APPLICABLE ENCLOSURE CLASSIFICATION.
 5) COMPONETS AND CLADDING DESIGN PRESSURES.
  
 REVIEWED BY WDS.
  
 DENIED SENT TO (F)
 CALL CONTRACTOR.
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2013-11-01 Cont ID  
Sent By albarran Date 2013-11-01 Time 15:46 Rev Time 0.00
Received By albarran Date 2013-11-01 Time 15:46 Sent To B
Notes
2013-11-01 15:52:48THE ELECTRICAL SCOPE OF THIS PERMIT IS LIMITED TO THE
 ELECTRICAL COMPLIANCE WITH NEC ARTICLE 600 FOR THE
 ACTUAL SIGN. THE ELECTRICAL CONNECTIONS TO SAME ARE
 UNDER A DIFFERENT PERMIT.
 SENT TO MISC. 2
  

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2013-10-11 Cont ID  
Sent By dharvey Date 2013-10-11 Time 11:36 Rev Time 0.00
Received By dharvey Date 2013-10-11 Time 11:35 Sent To  
Notes
2013-10-11 11:36:26PROVIDE ALL ELECTRICAL DATA FOR A COMPLETE SIGN
 ELECTRIC. INCLUDE-- CIRCUITRY WITH CONDUIT AND
 CONDUCTOR SIZING, VOLTAGE DROP CALCS, WIND LOAD PER SE
 FLORIDA ENGINEERING, DISCONNECT LOCATIONS, UL LISTINGS,
 ETC.......
 REVIEWED BY WDS
 DENIED IN (F)
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2013-11-07 Cont ID  
Sent By skennedy Date 2013-11-07 Time 16:05 Rev Time 0.00
Received By skennedy Date 2013-10-16 Time   Sent To  
Notes
2013-10-16 14:41:45ZONING BOX
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2013-11-02 Cont ID  
Sent By shill Date 2013-11-02 Time 12:24 Rev Time 0.00
Received By shill Date 2013-10-07 Time 10:14 Sent To  
Notes
2013-11-02 12:26:2611/2 FIRST SUBMITTAL HAS NOT COMPLETED ALL REVIEWS.
 CUSTOMER RESUBMITTED PRIOR TO COMPLETION OF ALL
 REVIEWS. ROUTING PLAN TO DENIED DRAWER TO MATCH WITH
 RESUBMITTAL AT FUTURE DATE. SH
  
2013-10-07 10:14:49ROUTED TO ZONING

Review Stop Z ZONING
Rev No 2 Status P Date 2013-10-29 Cont ID  
Sent By ajones Date 2013-10-29 Time 10:41 Rev Time 0.00
Received By ajones Date 2013-10-29 Time 10:41 Sent To E
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2013-10-10 Cont ID  
Sent By ajones Date 2013-10-10 Time 10:50 Rev Time 0.00
Received By ajones Date 2013-10-10 Time 10:50 Sent To  
Notes
2013-10-10 11:22:3210/10/13- DENIED- PLANS NEED TO BE STAMPED BY THE PALM
 BEACH OUTLETS AND A SITE PLAN INDICATING THE LOCATION
 OF THE BAY NEEDS TO BE INCLUDED.
  
 ANGELLA VANN