Plan Review Details - Permit 13090010
Plan Review Stops For Permit 13090010
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2013-09-27 Cont ID  
Sent By jwitmer Date 2013-09-27 Time 15:27 Rev Time 0.00
Received By jwitmer Date 2013-09-27 Time 15:27 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2013-09-13 Cont ID  
Sent By jwitmer Date 2013-09-13 Time 07:59 Rev Time 0.00
Received By jwitmer Date 2013-09-13 Time 07:31 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2013-10-07 Cont ID  
Sent By dharvey Date 2013-10-07 Time 06:43 Rev Time 0.00
Received By dharvey Date 2013-10-07 Time 06:37 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2013-09-23 Cont ID  
Sent By dharvey Date 2013-09-23 Time 17:34 Rev Time 0.00
Received By dharvey Date 2013-09-23 Time 17:34 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2013-10-07 Cont ID  
Sent By rmcdouga Date 2013-10-07 Time 06:28 Rev Time 0.00
Received By rmcdouga Date 2013-10-07 Time 06:28 Sent To  
Notes
2013-10-07 06:32:24PLANS WERE RE-STAMPED BY W JOLIN ON 10/5/2013 . RM

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2013-09-09 Cont ID  
Sent By lphilmor Date 2013-09-09 Time 06:47 Rev Time 0.00
Received By lphilmor Date 2013-09-09 Time 06:47 Sent To B
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2013-10-07 Cont ID  
Sent By dharvey Date 2013-10-07 Time 06:44 Rev Time 0.00
Received By dharvey Date 2013-09-24 Time 14:30 Sent To  
Notes
2013-10-07 06:44:22TO R MCDOUGAL
2013-09-24 14:30:50B23
 RESTAMP FOR B, E, FIRE
  
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2013-09-23 Cont ID  
Sent By dharvey Date 2013-09-23 Time 17:35 Rev Time 0.00
Received By dharvey Date 2013-09-23 Time 17:35 Sent To  
Notes
2013-09-03 18:00:30B23

Review Stop P PLUMBING
Rev No 2 Status P Date 2013-09-26 Cont ID  
Sent By lwagner Date 2013-09-26 Time 15:49 Rev Time 0.00
Received By lwagner Date   Time   Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2013-09-11 Cont ID  
Sent By lwagner Date 2013-09-11 Time 12:34 Rev Time 0.00
Received By lwagner Date 2013-09-11 Time 11:18 Sent To  
Notes
2013-09-11 12:34:26FBC 2010 PLUMBING REVIEW #1
 DENIED:
  
 SHEET A-1 PLUMBING RISER SHOWS THE PUMP DISCHARGE TO A
 VENT.
 712.3.5 EJECTOR CONNECTION TO THE DRAINAGE SYSTEM.
 PUMPS CONNECTED TO THE DRAINAGE SYSTEM SHALL CONNECT TO
 THE BUILDING SEWER OR SHALL CONNECT TO A WYE FITTING IN
 THE BUILDING DRAIN A MINIMUM OF 10 FEET (3048 MM) FROM
 THE BASE OF ANY SOIL STACK, WASTE STACK OR FIXTURE
 DRAIN. WHERE THE DISCHARGE LINE CONNECTS INTO
 HORIZONTAL DRAINAGE PIPING, THE CONNECTOR SHALL BE MADE
 THROUGH A WYE FITTING INTO THE TOP OF THE DRAINAGE
 PIPING.
  
 REVIEW BY
 LARRY WAGNER
 CHIEF PLUMBING INSPECTOR
 PHONE # 805-6692
 EMAIL [email protected]
 FAX # 805-6676
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved