Plan Review Stops For Permit 13070712 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2013-10-17 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2013-10-17 |
Time |
06:49 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2013-10-17 |
Time |
06:49 |
Sent To |
ENG |
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2013-08-22 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2013-08-22 |
Time |
20:03 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2013-08-22 |
Time |
20:03 |
Sent To |
|
|
Notes |
2013-08-22 20:04:02 | RESIDENT AND GUEST PARKING ONLY | | STUCTURE BUILT PRIOR TO MARCH 1991 | | FILED LETTER FROM CONDO ASSOC W/PLAN | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2013-08-06 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2013-08-06 |
Time |
11:52 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2013-08-06 |
Time |
11:52 |
Sent To |
ENG |
|
Notes |
2013-08-06 11:52:49 | ****CORRECTIONS**** | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | 561-805-6724 [email protected] | | FBC FLORIDA BUILDING CODE 2010 | | FBC R FLORIDA BUILDING CODE 2010 RESIDENTIAL | | | | 1. PROVIDE A LEGIBLE PLAN TO PROVIDE THE FOLLOWING | | INFORMATION: | | | | TOTAL NUMBER OF PARKING SPACES | | NUMBER OF ACCESSIBLE SPACES | | LOCATION OF ACCESSIBLE ENTRANCES | | LOCATION OF ACCESSIBLE SPACES AND ACCESS AISLES | | SHOW ACCESSIBLE ROUTE FROM PUBLIC WAY | | ACCESSIBLE ROUTE FROM ACCESSIBLE SPACE TO ACCESSIBLE | | ENTRANCE | | | | SEE FBC 2010 ACCESSIBLITY 202.3 (ALTERATIONS), 208.2 | | (PARKING SPACES), 502 (PARKING SPACES), 206 (ACCESSIBLE | | ROUTE). | | | | YOU MAY FIND THE FOLLOWING DOCUMENT USEFUL, | | PARTICULARLY THE INTRODUCTION: "WHEN A BUSINESS | | RESTRIPES A PARKING LOT, IT MUST PROVIDE ACCESSIBLE | | PARKING SPACES AS REQUIRED BY THE ADA STANDARDS FOR | | ACCESSIBLE DESIGN." | | | | HTTP://WWW.ADA.GOV/RESTRIPE.HTM | | | | 2. FBC 2010 ACCESSIBILITY ADVISORY 502.3, WHERE THE | | ACCESSIBLE ROUTE MUST CROSS VEHICULAR TRAFFIC LANES, | | MARKED CROSSINGS ENHANCE PEDESTRIAN SAFETY; PLEASE | | INDICATE LOCATION ON PLAN. | | | | 3. THE INDIVIDUAL TAKING RESPONSIBILITY SHALL PROVIDE | | THEIR PRINTED NAME AND SIGNATURE ON THE PLAN, FBC 107. | | | | | | |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
2 |
Status |
P |
Date |
2013-10-20 |
|
|
Cont ID |
|
Sent By |
Mgonzale |
Date |
2013-10-20 |
Time |
|
Rev Time |
1.00 |
Received By |
mgonzale |
Date |
2013-10-20 |
Time |
|
Sent To |
I |
|
Notes |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
F |
Date |
2013-08-19 |
|
|
Cont ID |
|
Sent By |
mgonzale |
Date |
2013-08-19 |
Time |
|
Rev Time |
|
Received By |
mgonzale |
Date |
2013-08-19 |
Time |
|
Sent To |
|
|
Notes |
2013-08-19 09:46:01 | I HAVE ATTACHED CITY'S STANDARD PARKING DETAIL FOR ADA | | AND PARKING STALL. | | | | [email protected] |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2013-10-22 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2013-10-22 |
Time |
09:22 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2013-09-26 |
Time |
17:24 |
Sent To |
|
|
Notes |
2013-10-02 10:48:54 | SENT TO MISC 2 BOX. | 2013-09-26 17:25:37 | INCOMING SENT TO ZONING BOX. JW |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2013-08-19 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2013-08-19 |
Time |
11:37 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2013-07-19 |
Time |
14:39 |
Sent To |
|
|
Notes |
2013-07-19 14:39:51 | INCOMING SENT TO ZONING BOX . JW |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
P |
Date |
2013-10-02 |
|
|
Cont ID |
|
Sent By |
aaponte |
Date |
2013-10-02 |
Time |
10:48 |
Rev Time |
0.00 |
Received By |
aaponte |
Date |
2013-09-27 |
Time |
09:08 |
Sent To |
|
|
Notes |
2013-09-27 09:09:12 | ZONING RECEIVED. SENT TO AA FOR REVIEW. |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2013-07-31 |
|
|
Cont ID |
|
Sent By |
jroach |
Date |
2013-07-31 |
Time |
10:22 |
Rev Time |
0.00 |
Received By |
aaponte |
Date |
2013-07-24 |
Time |
15:59 |
Sent To |
|
|
Notes |
2013-07-31 10:58:21 | 1. PLEASE PROVIDE A SURVEY OF THE AFFECTED AREA. | | 2. NEW STRIPING SHALL COMPLY WITH CITY'S STRIPING | | DETAIL AND DIMENSIONS- SEC 94-485. | | 3. ASPHALT OVERLAY REQUIRES COMPLIANCE WITH LANDSCAPE | | REQUIREMENTS. PLEASE PROVIDE INFORMATION TO CONFIRM | | COMPLIANCE WITH THE 5 FEET LANDSCAPE BUFFER AROUND THE | | PARKING LOT. | | FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA | | APONTE AT 561-822-1439. |
|
|