Plan Review Details - Permit 13070624
Plan Review Stops For Permit 13070624
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2013-07-24 Cont ID  
Sent By shill Date 2013-07-24 Time 14:47 Rev Time 0.00
Received By shill Date 2013-07-24 Time 14:47 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2013-07-18 Cont ID  
Sent By shill Date 2013-07-18 Time 17:44 Rev Time 0.00
Received By shill Date 2013-07-18 Time 17:44 Sent To  
Notes
2013-07-18 17:52:31****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. APPLICATION STATES THAT ROOF PITCH IS 1/12. SEE NOA,
 PAGE 4, SLOPE IS TO BE 2:12 OR GREATER. THIS MAY BE
 SUBMITTED USING ALTERNATIVE MATERIALS AND METHODS:
  
 104.11 ALTERNATIVE MATERIALS, DESIGN AND METHODS OF
 CONSTRUCTION AND EQUIPMENT. THE
 PROVISIONS OF THIS CODE ARE NOT INTENDED TO PREVENT THE
 INSTALLATION OF ANY MATERIAL OR TO PROHIBIT
 ANY DESIGN OR METHOD OF CONSTRUCTION NOT SPECIFICALLY
 PRESCRIBED BY THIS CODE, PROVIDED THAT
 ANY SUCH ALTERNAT IVE HAS BEEN APPROVED. AN ALTERNATIVE
 MATERIAL, DESIGN OR METHOD OF
 CONSTRUCTION SHALL BE APPROVED WHERE THE BUILDING
 OFFICIAL FINDS THAT THE PROPOSED DESIGN IS
 SATISFACTORY AND COMPLIES WITH THE INTENT OF THE
 PROVISIONS OF THIS CODE, AND THAT THE MATERIAL, METHOD
 OR WORK OFFERED IS, FOR THE PURPOSE INTENDED, AT LEAST
 THE EQUIVALENT OF THAT PRESCRIBED IN THIS CODE IN
 QUALITY, STRENGTH, EFFECTIVENESS, FIRE RESISTANCE,
 DURABILITY AND SAFETY. WHEN ALTERNATE LIFE SAFETY
 SYSTEMS ARE DESIGNED, THE SFPE ENGINEERING GUIDE TO
 PERFORMANCE-BASED FIRE PROTECTION
 ANALYSIS AND DESIGN OF BUILDINGS, OR OTHER METHODS
 APPROVED BY THE BUILDING OFFICIAL MAY BE USED.
 THE BUILDING OFFICIAL SHALL REQUIRE THAT SUFFICIENT
 EVIDENCE OR PROOF BE SUBMITTED TO SUBSTANTIATE ANY
 CLAIM MADE REGARDING THE ALTERNATIVE.
 104.11.1 RESEARCH REPORTS. SUPPORTING DATA, WHERE
 NECESSARY TO ASSIST IN THE APPROVAL OF
 MATERIALS OR ASSEMBLIES NOT SPECIFICALLY PROVIDED FOR
 IN THIS CODE, SHALL CONSIST OF VALID
 RESEARCH REPORTS FROM APPROVED SOURCES.
 104.11.2 TESTS. WHENEVER THERE IS INSUFFICIENT EVIDENCE
 OF COMPLIANCE WITH THE PROVISIONS OF
 THIS CODE, OR EVIDENCE THAT A MATERIAL OR METHOD DOES
 NOT CONFORM TO THE REQUIREMENTS OF THIS
 CODE, OR IN ORDER TO SUBSTANTIATE CLAIMS FOR
 ALTERNATIVE MATERIALS OR METHODS, THE BUILDING
 OFFICIAL SHALL HAVE THE AUTHORITY TO REQUIRE TESTS AS
 EVIDENCE OF COMPLIANCE TO BE MADE AT NO
 EXPENSE TO THE JURISDICTION. TEST METHODS SHALL BE AS
 SPECIFIED IN THIS CODE OR BY OTHER
 RECOGNIZED TEST STANDARDS. IN THE ABSENCE OF RECOGNIZED
 AND ACCEPTED TEST METHODS, THE
 BUILDING OFFICIAL SHALL APPROVE THE TESTING PROCEDURES.
 TESTS SHALL BE PERFORMED BY AN APPROVED
 AGENCY. REPORTS OF SUCH TESTS SHALL BE RETAINED BY THE
 BUILDING OFFICIAL FOR THE PERIOD REQUIRED
 FOR RETENTION OF PUBLIC RECORDS.
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved