Plan Review Stops For Permit 13060313 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2013-07-29 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-07-29 |
Time |
14:44 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-07-29 |
Time |
13:10 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2013-07-17 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-07-17 |
Time |
10:48 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-07-16 |
Time |
07:07 |
Sent To |
|
|
Notes |
2013-07-17 10:48:25 | 2010 FBC | | | | DENIED BY BUILDING | | | | 1) OWNER/AGENT IS REQUIRED TO SIGN ENERGY COMPLIANCE | | FORM. FBC ENERGY CONSERVATION CHAPTER 4, FBC ENERGY | | CONSERVATION 101.4.5 | | | | 2) THE PRODUCT APPROVALS SUBMITTED FOR THE NEW WINDOW | | HAS A DESIGN PRESSURE RATING OF - 60 PSF AND THE PLANS | | SPECIFY -61.12 PSF IS REQUIRED. PLEASE SUBMIT TWO | | COPIES OF WINDOW PRODUCT APPROVALS WITH ADEQUATE DESIGN | | PRESSURES. DCA RULE 9N-3 AND FBC R301.2.1 | | | | 3) THE VALUE OF $3000.00 FOR THE SCOPE OF WORK FOR THIS | | PROJECT APPEARS TO BE LOW. PROVIDE A COST BREAKDOWN | | INCLUDING ALL DESIGN, LABOR, MATERIAL, INCLUDING ALL | | TRADES PLUS PROFIT AND OVERHEAD FOR THIS PROJECT. FOR | | PERMITTING PURPOSES THE VALUATION IS THE TOTAL | | REPLACEMENT VALUE OF ALL STRUCTURAL, ELECTRIC, | | PLUMBING, INTERIOR FINISH, DESIGN FEES, OVERHEAD AND | | PROFIT. CITY AMENDMENTS 109.3 | | | | NOTE: ONE SET OF THE APPROVED PLANS WILL NEED TO BE | | SIGNED OUT AND TAKEN TO PALM BEACH COUNTY FOR AN IMPACT | | FEE REVIEW. THE PLANS WITH THE COUNTY IMPACT REVIEW | | STAMP AND A COPY OF THE IMPACT FEE RECEIPT WILL BE | | RETURNED TO THE CITY BUILDING DEPARTMENT BEFORE THE | | PERMIT IS ISSUED. | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | [email protected] |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2013-06-13 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-06-13 |
Time |
09:03 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-06-13 |
Time |
07:01 |
Sent To |
|
|
Notes |
2013-06-13 09:31:44 | 2010 FBC | | | | DENIED BY BUILDING | | | | 1) SUBMIT TWO COPIES OF A SITE PLAN / SURVEY THAT | | SPECIFIES THE DISTANCE FROM THE ENCLOSED PORCH TO | | PROPERTY LINES AND OTHER STRUCTURES LOCATED ON THE SAME | | LOT. THIS IS REQUIRED TO VERIFY COMPLIANCE WITH FBC | | R302.6 DWELLING FIRE SEPARATION. | | | | 2) SHOW COMPLIANCE WITH FBC ENERGY CONSERVATION CHAPTER | | 4 BY SUBMITTING THE REQUIRED FORMS. FBC ENERGY | | CONSERVATION 101.4.5 | | | | 3) SUBMIT TWO COPIES OF PRODUCT APPROVALS FOR THE NEW | | WINDOWS AND DOORS AS REQUIRED BY DCA RULE 9N-3. | | | | 4) SHOW COMPLIANCE WITH FBC R703.6.3 FOR THE REQUIRED | | BOND BREAK BETWEEN THE STUCCO AND THE WATER-RESISTIVE | | BARRIER ON THE EXTERIOR WOOD FRAME WALLS. | | | | 5) SHOW COMPLIANCE WITH FBC R703.6.2 AND ASTM C1063 FOR | | THE REQUIRED STUCCO WEEP SCREED AT THE BASE OF THE WOOD | | FRAME WALLS. | | | | 6) THE VALUE OF $3000.00 FOR THE SCOPE OF WORK FOR THIS | | PROJECT APPEARS TO BE LOW. PROVIDE A COST BREAKDOWN | | INCLUDING ALL DESIGN, LABOR, MATERIAL, INCLUDING ALL | | TRADES PLUS PROFIT AND OVERHEAD FOR THIS PROJECT. CITY | | AMENDMENTS 109.3 | | | | NOTE: ONE SET OF THE APPROVED PLANS WILL NEED TO BE | | SIGNED OUT AND TAKEN TO PALM BEACH COUNTY FOR AN IMPACT | | FEE REVIEW. THE PLANS WITH THE COUNTY IMPACT REVIEW | | STAMP AND A COPY OF THE IMPACT FEE RECEIPT WILL BE | | RETURNED TO THE CITY BUILDING DEPARTMENT BEFORE THE | | PERMIT IS ISSUED. | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | [email protected] |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2013-06-12 |
|
|
Cont ID |
|
Sent By |
dharvey |
Date |
2013-06-12 |
Time |
15:31 |
Rev Time |
0.00 |
Received By |
dharvey |
Date |
2013-06-12 |
Time |
15:31 |
Sent To |
|
|
Notes |
2013-06-12 15:34:33 | 6-12-13 | | DRAWINGS HAVE BEEN APPROVED PROVISIONALLY. FAILURE TO | | CORRECT THE INDICATED DEFICIENCES PRIOR TO INSPECTION, | | WILL RESULT IN A FAILED INSPECTION AND THE ASSESSMENT | | OF RE-INSPECTION FEES. | | APPROVED AS NOTED. | | VB |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2013-07-29 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-07-29 |
Time |
14:44 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-07-20 |
Time |
14:23 |
Sent To |
|
|
Notes |
2013-07-20 14:24:48 | INCOMING SENT TO R. MCDOUGALS' DESK . JW |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2013-06-13 |
|
|
Cont ID |
|
Sent By |
lmartine |
Date |
2013-06-13 |
Time |
12:14 |
Rev Time |
0.00 |
Received By |
lmartine |
Date |
2013-06-10 |
Time |
16:27 |
Sent To |
|
|
Notes |
2013-06-10 16:31:23 | *EXPEDITED* | | R--17 | | |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
2 |
Status |
P |
Date |
2013-08-01 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-08-01 |
Time |
11:23 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-08-01 |
Time |
11:23 |
Sent To |
|
|
Notes |
2013-08-01 11:25:46 | MU-2013-016707-0000 CALLED COUNTY AND VERIFIED THAT | | FEES WERE PAID. |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
1 |
Status |
F |
Date |
2013-06-13 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-06-13 |
Time |
07:04 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-06-13 |
Time |
07:04 |
Sent To |
|
|
Notes |
2013-06-13 07:05:59 | AN IMPACT FEE REVIEW BY PALM BEACH COUNTY IS REQUIRED. |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2013-06-13 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-06-13 |
Time |
07:24 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-06-13 |
Time |
07:03 |
Sent To |
|
|
Notes |
|
|