Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2014-09-25 Cont ID  
Sent By shill Date 2014-09-25 Time 18:42 Rev Time 0.00
Received By shill Date 2014-09-25 Time 18:42 Sent To  
Notes
2014-09-25 18:42:30 
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2014-01-11 Cont ID  
Sent By S HILL Date 2014-01-11 Time 14:38 Rev Time 0.00
Received By shill Date 2014-01-11 Time 14:38 Sent To ENG
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2013-11-02 Cont ID  
Sent By shill Date 2013-11-02 Time 13:04 Rev Time 0.00
Received By shill Date 2013-11-02 Time 13:04 Sent To Z
Notes
2013-11-02 13:05:34****CORRECTIONS****
 SAMANTHA HILL, BUILDING PLANS EXAMINER
 561-805-6724 [email protected]
 FBC FLORIDA BUILDING CODE 2010
 FBC R FLORIDA BUILDING CODE 2010 RESIDENTIAL
  
 COMMENTS FROM PREVIOUS LIST:
  
 1-2. ENGINEERING PROVIDED, BUT IS STILL FOR ANOTHER JOB
 LOCATED IN BOYNTON BEACH. INCLUDE JOB ADDRESS.
  
 3. OK
  
 4. PROVIDE A COPY OF THE CONTRACT FOR THIS JOB. VALUE
 IS TOO LOW FBC 109.
  
 2ND REVIEW, NOT ADDRESSED.
  
 **TWO SETS REQUIRED**
  
  
  
  
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2013-05-15 Cont ID  
Sent By shill Date 2013-05-15 Time 14:23 Rev Time 0.00
Received By shill Date 2013-05-15 Time 14:22 Sent To  
Notes
2013-05-15 14:29:24****CORRECTIONS****
 SAMANTHA HILL, BUILDING PLANS EXAMINER
 561-805-6724 [email protected]
 FBC FLORIDA BUILDING CODE 2010
 FBC R FLORIDA BUILDING CODE 2010 RESIDENTIAL
  
 1. DOCUMENTS PREPARED BY AN ENGINEER AND SUBMITTED FOR
 PUBLIC RECORD ARE TO BE SIGNED, SEALED, DATED ORIGINALS
 FS471. THE ENGINEERING FOR THE BOATLILFT APPEARS TO BE
 A COPY FROM ANOTHER JOB AND IS ILLEGIBLE.
  
 2. PROVIDE ENGINEERING OR CALCULATIONS FOR THE 10" NEW
 PILINGS WHICH WILL SUPPORT THE 16,000 LB BOATLIFT FBC R
 301.
  
 3. PROVIDE A SITE PLAN SHOWING LOCATION OF PROPOSED
 IMPROVEMENTS FBC 107.
  
 4. PROVIDE A COPY OF THE CONTRACT FOR THIS JOB. VALUE
 IS TOO LOW FBC 109.
  
  
  
  

Review Stop ENG ENGINEERING CSD
Rev No 4 Status P Date 2014-09-05 Cont ID  
Sent By cranford Date 2014-09-05 Time 14:13 Rev Time 0.25
Received By cranford Date 2014-09-05 Time 14:11 Sent To I
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 3 Status F Date   Cont ID  
Sent By mgonzale Date 2014-01-14 Time   Rev Time 0.25
Received By   Date 2014-01-14 Time   Sent To Z
Notes
2014-01-14 15:53:41ADDRESS PLANNING'S COMMENTS.
  
 ENGINEERING HAS NO COMMENTS.
  
 ROW PERMIT MAY BE REQUIRED IF SIDEWALK IS BLOCKED
 DURING CONSTRUCTION.
  
 [email protected]
 (561) 494-1085
  

Review Stop ENG ENGINEERING CSD
Rev No 2 Status F Date 2013-11-12 Cont ID  
Sent By shill Date 2013-11-12 Time 08:47 Rev Time 0.00
Received By shill Date 2013-11-12 Time 08:47 Sent To  
Notes
2013-11-12 08:47:54SEE PREVIOUS PLAN REVIEW COMMENT LIST (ENGINEERING
 REVIEW #1)
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2013-05-10 Cont ID  
Sent By mgonzale Date 2013-05-10 Time 11:52 Rev Time 1.00
Received By mgonzale Date 2013-05-10 Time 11:52 Sent To B
Notes
2013-05-10 15:02:05PROVIDE SURVEY FOR THE DOCK.
  
 PROVIDE ELEVATION OF DOCK
  
 PROVIDE HOW DOCK IS ACCESSED FROM FLAGLER ROW.
 ANY MODIFICATION TO BULK HEAD?
  
 [email protected]
 (561) 494-1085
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2014-09-25 Cont ID  
Sent By shill Date 2014-09-25 Time 18:42 Rev Time 0.00
Received By shill Date 2014-09-24 Time 17:56 Sent To  
Notes
2014-09-24 17:56:49TO ZONING
  

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2014-09-05 Cont ID  
Sent By skennedy Date 2014-09-05 Time 14:53 Rev Time 0.00
Received By skennedy Date 2014-08-29 Time 11:58 Sent To  
Notes
2014-08-30 11:59:22SENT TO ZONING BOX

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2014-01-16 Cont ID  
Sent By shill Date 2014-01-16 Time 13:35 Rev Time 0.00
Received By shill Date 2013-12-06 Time 17:21 Sent To  
Notes
2014-01-11 14:38:341/11 TO ENGINEERING
  
2013-12-06 17:21:55SENT TO ZONING BOX

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2013-11-12 Cont ID  
Sent By shill Date 2013-11-12 Time 08:47 Rev Time 0.00
Received By shill Date 2013-10-10 Time 12:56 Sent To  
Notes
2013-11-05 19:18:3511/5 TO ENGINEERING
  
2013-10-10 12:56:38SENT TO ZONING BOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2013-05-15 Cont ID  
Sent By shill Date 2013-05-15 Time 15:11 Rev Time 0.00
Received By shill Date 2013-03-26 Time 16:46 Sent To  
Notes
2013-05-14 14:40:095/14 TO MISC 3
  
2013-03-26 16:47:14INCOMING SENT TO ZONING BOX. JW

Review Stop Z ZONING
Rev No 5 Status P Date 2014-09-25 Cont ID  
Sent By llouie Date 2014-09-25 Time 15:03 Rev Time 0.00
Received By llouie Date 2014-09-25 Time 15:03 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 4 Status F Date 2014-09-03 Cont ID  
Sent By llouie Date 2014-09-03 Time 16:04 Rev Time 0.00
Received By llouie Date 2014-09-03 Time 16:04 Sent To ENG
Notes
2014-09-03 16:30:52PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE
 COMMENTS IN WRITING AND/OR ON THE PLANS WHERE
 APPLICABLE:
  
 1.) PLEASE DEMONSTRATE THAT THE LOCATION OF THE
 PROPOSED BOAT LIFTS ARE LOCATED WITHIN THE MIDDLE
 ONE-THIRD OF THE LOT. (ZLDR S.94-314(3) H.)
  
 (SPOKE TO DONNA ISHAM ON 9/3/14 REQUESTING ADDITIONAL
 INFORMATION IN PLANS).
  
 PLEASE NOTE THAT ANY CHANGES ON THE RESUBMITTED PLANS
 MAY RESULT IN ADDITIONAL COMMENTS. CONTACT LINDA LOUIE
 @ (561) 822-1458 IF YOU HAVE QUESTIONS.
  
2014-09-03 11:05:039/3/14 ZONING SENT TO LL. SG

Review Stop Z ZONING
Rev No 3 Status F Date 2013-12-11 Cont ID  
Sent By llouie Date 2013-12-11 Time 13:09 Rev Time 0.00
Received By llouie Date 2013-12-11 Time 13:02 Sent To B
Notes
2013-12-11 13:07:41** FAILED **
  
 PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE
 COMMENTS IN WRITING AND/OR ON THE PLANS WHERE
 APPLICABLE:
  
 1.) 10/23/13 REPEAT COMMENT: DOCKS, DOLPHINS, PILINGS,
 AND OTHER MOORING-RELATED FACILITIES SHALL BE
 CONSTRUCTED WITHIN THE MIDDLE 1/3 OF THE LOT ON WHICH A
 DOCK IS CONSTRUCTED. (ZLDR S.94-304(E))
  
 2.) THE PROPOSED BOAT LIFT TO THE SOUTH SEEMS TO FALL
 OUTSIDE OF THE MIDDLE 1/3. IF THE PROPOSED LOCATION OF
 THE BOAT LIFT TO THE SOUTH IS TO REMAIN OUTSIDE OF THE
 MIDDLE 1/3, THEN A CLASS "A" SPECIAL USE PERMIT IS
 REQUIRED. THE APPLICATION FOR A CLASS "A" SPECIAL USE
 PERMIT IS AVAILABLE ONLINE AT WWW.WPB.ORG
  
 PLEASE NOTE THAT ANY REVISIONS MAY RESULT IN ADDITIONAL
 COMMENTS. CONTACT LINDA LOUIE @ (561) 822-1442 IF YOU
 HAVE QUESTIONS.
  

Review Stop Z ZONING
Rev No 2 Status F Date 2013-10-23 Cont ID  
Sent By llouie Date 2013-10-23 Time 15:34 Rev Time 0.00
Received By llouie Date 2013-10-23 Time 15:34 Sent To B
Notes
2013-10-23 15:35:41** FAILED **
  
 1.) THE ENTIRE DOCK CANNOT EXCEED 100 FT. IN LENGTH.
 THIS IS NOT REFLECTED IN THE DIAGRAM. (ZLDR S.
 94-304(E))
  
 2.) DOCKS, DOLPHINS, PILINGS, AND OTHER MOORING-RELATED
 FACILITIES SHALL BE CONSTRUCTED WITHIN THE MIDDLE 1/3
 OF THE LOT ON WHICH A DOCK IS CONSTRUCTED. (ZLDR S.
 94-304(E))
  
 PLEASE NOTE THAT ANY REVISIONS MAY RESULT IN ADDITIONAL
 COMMENTS. CONTACT LINDA LOUIE @ (561) 822-1442 IF YOU
 HAVE QUESTIONS.
  

Review Stop Z ZONING
Rev No 1 Status F Date 2013-04-17 Cont ID  
Sent By mdekle Date 2013-04-17 Time   Rev Time  
Received By mdekle Date 2013-03-27 Time   Sent To ENG
Notes
2013-04-17 15:24:52ZONING REVIEW STATUS: FAILED
 ___________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 ___________________________________________
 PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING PLAN
 REVIEW COMMENTS:
  
 1. THE APPLICANT MUST DEMONSTRATE COMPLIANCE WITH THE
 APPLICABLE PROVISIONS FOUND WITHIN SECTION 94-304. IF
 YOU HAVE ANY QUESTIONS PLEASE CONTACT ME AND/OR CONSULT
 THE CITY?S ZONING AND LAND DEVELOPMENT REGULATIONS
 ONLINE @WWW.MUNICODE.COM.
  
 MURRIAH DEKLE, MPA, PLANNER
 PLANNING & ZONING DIVISION
 TEL: (561) 822-1442
 EMAIL: [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved