Plan Review Stops For Permit 13030336 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2013-03-18 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2013-03-18 |
Time |
08:46 |
Rev Time |
0.00 |
Received By |
shill |
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2013-03-12 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2013-03-12 |
Time |
17:31 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2013-03-12 |
Time |
17:31 |
Sent To |
|
|
Notes |
2013-03-12 17:34:00 | ****CORRECTIONS**** | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | 561-805-6724 [email protected] | | FBC FLORIDA BUILDING CODE 2010 | | FBC R FLORIDA BUILDING CODE 2010 RESIDENTIAL | | | | 1. NOA CANNOT BE MODIFIED EXCEPT WITH ENGINEERING USING | | ALTERNATIVE METHODS AND MATERIALS FBC 104.11. PLEASE | | EITHER PROVIDE A FLORIDA STATE OR LOCAL PRODUCT | | APPROVAL OR A MIAMI DADE NOA WITH THE PROPOSED | | APPLICATION OR USE ASSEMBLY AS DESIGNED. | | | | |
|
|
|