Plan Review Stops For Permit 13020033 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2013-02-07 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-02-07 |
Time |
14:57 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-02-07 |
Time |
14:57 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2013-02-04 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-02-04 |
Time |
16:53 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-02-04 |
Time |
16:53 |
Sent To |
|
|
Notes |
2013-02-04 16:58:07 | 2010 FBC | | | | DENIED BY BUILDING | | | | 1) SPECIFY WHICH ONE OF THE FASTENING OPTIONS AND | | DESIGN PRESSURES LISTED ON PAGE 27 OF THE NOA FOR THE | | GAF MODIFIED ROOF SYSTEM WILL BE USED. FBCR 905.11.3 | | | | 2) SUBMIT TWO COPIES OF SIGNED AND SEALED RAS 117 | | CALCULATIONS FOR ENHANCED FASTENING AS REQUIRED BY | | LIMITATION NUMBER 7 ON PAGE 31 OF THE NOA. FBCR | | 905.11.3 AND CITY AMENDMENTS 107.2.1.4 | | | | 3) PER FBC EXISTING BUILDING SECTION 611.1.1, NOT MORE | | THAN 25 PER CENT OF THE TOTAL ROOF AREA OR ROOF SECTION | | OF ANY EXISTING BUILDING OR STRUCTURE SHALL BE | | REPAIRED, REPLACED OR RECOVERED IN ANY 12 MONTH PERIOD | | UNLESS THE ENTIRE ROOFING SYSTEM OR ROOF SECTION | | CONFORMS TO REQUIREMENTS OF THIS CODE. PROVIDE TWO | | COPIES OF A DIMENSIONED DIAGRAM OF THE ROOF INDICATING | | THE AREA OF THE PROPOSED REPAIRS. | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | [email protected] |
|
|
|